Information
-
Document No.
-
Audit Title Liffey P.M. Checklist.
-
Conducted on
-
Prepared by
External
-
Is building in good condition?
-
Is earth stake connected and in good condition?
-
Have weeds been controlled?
-
Are drains in good condition?
-
Is access track in good condition?
-
Is the Liffey River intake clear of obstructions?
-
Is the Stoneycroft PSV in good operating condition?
-
Are external pipes and fittings free of leaks and corrosion?
-
Add media
Internal
-
Are all lights and electrical fittings in good condition?
-
Is fire extinguisher in good working condition?
-
Is sisilation in good condition?
-
Is area clean and tidy?
-
Are pipes and fittings free of leaks and corrosion?
-
Add media
Valves and Fittings
-
Are the non-return valves operating correctly?
-
Are the valves and fittings free of leaks?
-
Add media
Pressure sustaining valve and pressure relief valve
-
Is the pressure sustaining valve isolated?
-
Are solenoids in good working order?
-
Is proximity switch in good operating condition?
-
Is the Pressure relief valve operational?
-
Does the pressure gauge read the same as PIT 2020?
-
Are all relief valves in open position?<br><br><br><br>
-
Add media
Split Case Pumps
-
Pump 1 operating hours
-
Has grease been applied every 1000 hrs for pump 1000 hrs for motor?
-
Pump 2 operating hours
-
Has grease been applied every 1000hrs for pump 1000 hrs for motor?
-
Pump 1 kWh
-
Pump 2 kWh
-
Are pumps and motors free of vibration and unusual noise?
-
Are glands in good operating condition?
-
Are all guards correctly fitted?
-
Are all pump isolation valves in open position?
-
Add media
Turbine Pump
-
Turbine pump operating hours
-
Has grease been applied every 200hrs for pump 1000 hrs for motor?
-
Turbine pump kWh
-
Are pump and motor free of vibration and unusual noise?
-
Are glands in good operating condition?
-
Are all guards correctly fitted?
-
Is wet well in good condition?
-
Wet well depth measurement from underside of cover.
-
Add media
Flow meters
-
FLOM 1 reading (Liffey River)
-
+ Flow
-
- Flow
-
FLOM 2 reading
-
Pipeline pressure kPa
Electrical
-
Is the dam level sensor in good condition?
-
Are electrical cabinets in good condition?
-
Is the PLC and touch screen operational?
-
Are VFD units operational?
-
Add media
-
Comments