Information
-
Document No.
-
Audit Title
-
Rubicon P.M.Checklist
-
Conducted on
-
Prepared by
External
-
Are fences and gates in good condition?
-
Is the inlet screen clear of obstructions?
-
Is access to the pumps and control cabinet clear of weeds and obstructions?
-
Add media
Pump Compound
-
Is pipe work free of leaks and corrosion?
-
Is pressure sensor gauge operational?
-
Pipeline pressure kPa.
-
Is PRV in good operational condition. Check pressure gauge reads the same as pressure sensor.
-
Is wet well free of silt and debris?
-
Depth to bottom of well in metres.
-
Add media
Control and Electrical Cubicle.
-
Is the cubicle free of weeds,vermin and corrosion?
-
Is earth stake connected and in good condition?
-
Are all locks and doors secure?
-
Is the lighting in good operational condition?
-
Pump 1 operating hours.
-
Pump 2 operating hours.
-
Pump 1 kW.
-
Pump speed.
-
Pump 2 kW.
-
Pump speed.
-
Flow rate ML/day.
-
Flow meter total Ml.
-
Add media
-
Comments
Pumps and Motors
-
Are all pump bearing oils at correct level?
-
Has grease been applied to pumps and motors as per schedule?
-
Are pumps and motors well painted and free of corrosion?
-
Comments.
-
Add media