Information

  • Document No.

  • Audit Title

  • Rubicon P.M.Checklist

  • Conducted on

  • Prepared by

External

  • Are fences and gates in good condition?

  • Is the inlet screen clear of obstructions?

  • Is access to the pumps and control cabinet clear of weeds and obstructions?

  • Add media

Pump Compound

  • Is pipe work free of leaks and corrosion?

  • Is pressure sensor gauge operational?

  • Pipeline pressure kPa.

  • Is PRV in good operational condition. Check pressure gauge reads the same as pressure sensor.

  • Is wet well free of silt and debris?

  • Depth to bottom of well in metres.

  • Add media

Control and Electrical Cubicle.

  • Is the cubicle free of weeds,vermin and corrosion?

  • Is earth stake connected and in good condition?

  • Are all locks and doors secure?

  • Is the lighting in good operational condition?

  • Pump 1 operating hours.

  • Pump 2 operating hours.

  • Pump 1 kW.

  • Pump speed.

  • Pump 2 kW.

  • Pump speed.

  • Flow rate ML/day.

  • Flow meter total Ml.

  • Add media

  • Comments

Pumps and Motors

  • Are all pump bearing oils at correct level?

  • Has grease been applied to pumps and motors as per schedule?

  • Are pumps and motors well painted and free of corrosion?

  • Comments.

  • Add media

Completed by.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.