Information
-
Client Name:
- MVH
- Hafod
- Tai Calon
- Stonewater
- Monmouthshire H/A
- Wales & West
-
Location.
-
Tenure.
- Owner occupier
- Local Authority
- Housing Association
- Privately Rented
-
Address
-
Property Type.
- Mid-Terrace
- End terrace
- Semi-detached
- Detached
- Ground Floor Flat
- Middle Floor Flat
- Top Floor Flat
- Masonette
- Bungalow
- House
- Commercial Building
-
Building Finish.
- Brick
- Painted Render
- Brick/Render
- Pebble Dash
- Recon Stone
- Spar
- Limestone/Sandstone
- Granite/Whinstone
-
Installation Completed By
Property details
-
Main Heating type,
-
Protected species or rodents present in building.
-
Special Instructions.
Access
-
Client Instructions.
-
Access Issues.
-
Access Equipment Required.
- Stepladder
- None
- Ladder
- Scaffold / Tower
CWI
Cavity Wall Insulation
-
Please provide photos of all elevations
-
M2 area of CWI to be insulated
-
Material being used for install
-
Installers name
-
Date
-
Provide photos of install including, drill, bead in holes and sealed up drill pattern.
Dynamic Risk Assessment
Dynamic Risk Assessment.
-
Please select yes if insulation work as to be installed.
-
Reversing vehicle.
-
Asbestos
-
Overhead electricity cables.
-
Use of a step ladders.
-
Use of a ladder.
-
Manual Handling.
-
Hand tools.
-
Vibration.
-
Noise.
-
House keeping.
-
Use of mobile elevation working platform (mewp) or a scaffold tower.
-
Lone worker.
-
I have assessed the conditions on site ensuring there is adequate ventilation and no evidence of damp and no remedial works required. Unless listed below, there are no additional significant hazards observed that are not addressed in the generic risk assessment for the work to be undertaken.
-
Assessors signature