Title Page
-
Document No. 1
-
Corn Belt Energy Corporation Job Briefing/Tailgate
-
Corn Belt Energy Cooperation Job Briefing Compliance Checklist
-
It is understood that the Job briefing occurs before the beginning of each new job at the job site location.
-
It is understood that an updated job briefing must occur if significant changes occur at the job site or new employees arrive at the job site.
-
It is understood that a more extensive job briefing must be conducted if: the work involved is complicated, particularly hazardous, employees have not performed the task in the last year, or the employees cannot be expected to recognize and avoid the hazards associated with the job.
General Information
-
Date/Time
-
Weather
- Sunny
- Partly Sunny
- Partly Cloudy
- Cloudy
- Night
- Foggy
- Snow
- Rain
- Ice
-
Temperature
- 100 to 110 Degreees
- 90 to 100 Degrees
- 80 to 90 Degrees
- 70 to 80 Degrees
- 60 to 70 Degrees
- 50 to 60 Degrees
- 40 to 50 Degrees
- 30 to 40 Degrees
- 20 to 30 Degrees
- 10 to 20 Degrees
- 0 to 10 Degreees
- -10 to 0 Degrees
- -20 to -10 Degrees
- -30 to -20 Degrees
-
Wind Direction/Speed
- North
- Northeast
- East
- Southeast
- South
- Southwest
- West
- Northwest
- 0 to 10 MPH
- 10 to 20 MPH
- 20 to 30 MPH
- 30 to 40 MPH
- 40 to 50 MPH
- 50 + MPH
-
Physical Address
-
Map Location/Line Number
-
Work Order Number if Applicable
Vehicle Information
-
Vehicles at Jobsite
- 9918 Small Service Bucket
- 9910 Small Service Bucket
- 9921 Small Service Bucket
- 9914 Small Service Bucket
- 9902 Small Service Bucket
- 9930 Small Service Bucket
- 9903 Small Service Bucket
- 9929 55' Large Bucket
- 9927 Digger
- 9911 Digger
- 9920 Digger
- 9901 Digger
- 9916 3/4 Ton Warehouse Pickup
- 9907 Spare 55’ Large Bucket
- 9925 Mechanics Truck
- 9926 Versalift Large Bucket
-
Equipment on Job Site
- North Equipment
- 9968 V5800 Trencher
- 9962 Small Old Trencher
- 9971 ASV
- 9970 VFlextrack
- 9959 Kubota Tractor
- 9931 Polaris Ranger 4 X 4
-
All vehicles have been inspected and daily logs filled out.
Safety Information
-
Type of Work Being Performed
- 1 phase pole change HOT
- 1 phase pole change DEAD
- 2 phase pole change HOT
- 2 phase pole change DEAD
- 3 phase pole change HOT
- 3 phase pole change DEAD
- Primary UG Trenching
- Primary UG Boring
- Secondary UG Trenching
- Secondary UG Boring
- OH Transformer Install/Remove
- PAD Transformer Install/Remove
- Anchor Install/Remove
- Retire/Remove OH LIne
- Line Rebuild/Lean Line
- Primary OH Install/Remove
- Secondary OH Install/Remove
- OH Maintenance
- UG Maintenance
- Other
-
If other is picked from list before or some other type of special work is being performed, please provide desciption.
-
Traffic Control Measures have been discussed and all necessary are in use, to include flashers, beacons, cones, traffic vests, signs, barricades and flaggers.
-
All hazards associated with the job have been discussed.(Add notes if necessary)
-
All work procedures involved have been discussed.(Add notes if necessary)
-
Have nearby crews been informed of your work(Contractor or CBEC)
-
Energy source controls have been discussed to include: direction of feed, non-reclose operation, Lockout/Tagout, de-energize location and proper grounding of lines.
-
Has equipment been grounded for work to be performed.
-
What energy source controls are in place?
- Line Grounded
- Lock Out/Tag Out
- Open Air
- One Shot Installed
-
PPE requirements have been discussed, inspected for condition and are being utilized for hazards associated with job.
-
Has a call been made to JULIE to locate underground utilities.(800-892-0123)(811)
-
Are JULIE marks current?
-
Flags Posted?
-
All special precautions and concerns have been addressed. Please list any in notes section.
-
Person in Charge
- Cimei, Steve
- Derudeis, Michael
- Doyle, Kris
- Henning, Gerry
- Knudsen, Adam
- Law, Joe
- Lind, Jamie
- Ponsetti, David
- Rolando, Rod
- Sanders, Steve
- Neahring, Tom
- Galassi, Matt
- Skaggs, Randy
- Gary Glover
-
Signature/Initials of person in charge.
-
Employees involved in Job Briefing/Tailgate
- Cimei, Steve
- Derudeis, Michael
- Doyle, Kris
- Henning, Gerry
- Knudsen, Adam
- Law, Joe
- Lind, Jamie
- Ponsetti, David
- Rolando, Rod
- Sanders, Steve
- Neahring, Tom
- Galassi, Matt
- Skaggs, Randy
- Gary Glover
-
Each employee involved in Job Briefing/Tailgate must initial the box below.
-
Before work begins, all personnel on this job site are in agreement as to the work being done, their duties in the job and safety measures to be taken. All hazards directly associated with this job have been discussed. Crew members and persons on the job site are aware of energy source controls and CBEC Dispatch has been notified of your work location. All PPE is to be inspected prior to the start of work or on a daily basis. Be Safe!!
-
All Pre Job Briefings conducted CBEC property shall meet the OSHA Minimum Requirements as stated under 29 CFR 1910.269 (c) Job Briefing