Information
-
Document No.
-
Name of company?
-
Name of person taking the test?
-
Mobile contact number.
-
Date of test?
-
Site of induction?
-
By signing a contractor acknowledgement statement you indicate you have read and understood the requirements of the CBRE/CIMB HSE Guidelines Safety Manual.
-
40 Creek Street is a smoke free zone? If you are caught smoking you can be asked to leave site!
-
Tick three types of documents you are required to provide building management.
-
SWMS
-
Relevant permits
-
JSA
-
Site specific risk assessments
-
Are subcontractors also required to sign in/out?
-
If you sign out a key from the onsite lock box, you are responsible for the key and if lost you will have to pay for the building to be re-keyed
-
Are you required to report all accidents/incidents involving your personnel to building management?
-
Tick examples of high risk work permits.
-
Working at heights permits.
-
Hot works permits.
-
Confined space entry permits.
-
Roof access permits.
-
Core holing permits.
-
Cold works permits.
-
You cannot start any works at 40 Creek Street unless you have provided a signed HSE form, work specific risk assessment, Induction checklist, all relevant works SWMS, permits & licences or tickets.
-
Where is the first aid kit located?
-
Security desk on the ground floor.
-
Building managers office.
-
On every office level at the first aiders desk.
-
Only fight a fire if save to do so and you have been trained.
-
if you bring chemical to site, what documents are you required to give building management?
-
Don't know.
-
Safety Data Sheets (SDS).
-
How often must you complete a site specific induction training?
-
What type Fire Extinguishers are located in all Fire Hose Reel Risers on office levels?
-
What type of fires can the Extinguishers put out that are located in all Fire Hose Reel Risers on office levels?
-
What type Fire Extinguishers are located in all Fire Hose Reel Risers on basement levels?
-
What type of fires can the Extinguishers put out that are located next to the fire stairs on basement levels?
-
Where are the fire hose reels and fire extinguishers located throughout the building?
-
Don't know.
-
On each level and located next to fire exits.
-
All over the building.
Emergency evacuation procedures
-
Do you know what to do when you hear an ALERT CONDITION "BEEP, BEEP, BEEP" in the building? Please tick
-
Proceed to internal assembly area or the nearest emergency exit. If there is time - collect essential personal belongings and
-
Do not congregate in passageways; remain at your internal assembly area if safe to do so.
-
Do not travel between buildings/floors.
-
Do you know what to do when you hear an ALERT CONDITION "WOOP, WOOP, WOOP" in the building? Please tick
-
Exit when directed by a Warden via the nearest safe exit, closing all doors behind you. DO NOT USE LIFTS. In the absence of a Warden, exit when stairway is clear.
-
Proceed directly to the external assembly area (Refer to the Site plan)
-
DO NOT re-enter the building until the “All Clear” is given by the responding Emergency Services.
-
Who is your emergency contact in the event of an accident/incident?
-
Please take a photo of your relevant licences or tickets.
-
Add media
Contractor HSE Guidelines
-
I acknowledge having received a copy of the CBRE “Contractor HSE Guidelines”. As a contractor of CBRE, I have read the “Contractor HSE Guidelines” and understand their contents in full. I agree to abide by the conditions stated in these guidelines, health and safety legislative requirements and/or any other direction by CBRE in relation to the health and safety of the site generally. * Please read and ensure your understanding of the booklet, then sign the in the below box with the issuing officer.
-
Contractors signature
-
Issuing officer
-
Please take a photo of yourself and smile!
-
Add media
-
Sign off
-
Date and time.
-
********************PLEASE NOW COMPLETE INDUCTION CHECKLIST************************