Title Page
-
Name:
-
Property Address:
-
Job Number:
-
Inspection Date:
-
Manager's Name:
External Assessment
Manager - Quality Assurance Inspection
-
Weather Conditions Time of Inspection
-
Photograph front and sides
-
Photograph water meter
-
External assessment - I confirm the following items are complete:
-
1. Driveway complete;<br>➢ Excluding saw cuts and sealing
-
2. Final site clean complete;<br>➢ Excluding, collection of the waste compound
-
3. Hardscapes complete;<br>➢ Excluding, Turf & Plants
-
4. Colour bond / Timber fences installed;<br>➢ Excluding gates & block off's
-
5. Pest Control;<br>➢ Excluding, charging of the lines
-
6. Power connected;<br>➢ Take photos of inside meter box
-
7. Pest Sticker inside meter box? ➢ Take photo of the sticker
-
8. Gas installation; ➢ Excluding connected to the house
- Gas meter installed
- Gas meter not installed (final inspection won't pass)
- Fitted for gas bottles (compliance plate installed)
- Fitted for gas bottles (compliance plate not installed)
- Gas not included
External Assessment
-
Is the outside complete? (YES or NO)
-
Estimated Date for the Re-Inspection?
-
Additional Notes:
-
Additional Photographs:
-
Proceed to Conduct the Quality Assurance Inspection
Failed items add notes and photos
-
Take Close up Photos of all Items and Failed Items Create an Action
-
Guide to Standards & Tolerances
https://www.fairtrading.nsw.gov.au/__data/assets/pdf_file/0008/369980/NSW_Guide_to_Standards_and_Tolerances.pdf -
Quality Assurance Inspection
STANDARD EXTERNAL - CHECK
-
Front External steps installed?
-
Porch External tiles checked for chips, scratches and cracks
-
Vertical trims (32mm x 18mm) are installed to porch and barge returns where brick meets hardie flex.
-
Side External steps installed?
-
Laundry External tiles checked for chips, scratches and cracks
-
Barge returns to be straight and plumb
-
Rear External steps installed?
-
Alfresco External tiles checked for chips, scratches and cracks
-
Vertical trims (32mm x 18mm) are installed to Alfresco and barge returns where brick meets hardie flex.
-
Take a photo of the lower roof from the rear yard
-
Take a photo of the rear walls (first floor cladding / brickwork if applicable)
-
Window angles installed
-
Is the fascia and gutter clean?
-
Gas box lid installed and painted
-
Water tank installed
-
Brick pointing complete
-
Brickwork checked for efflorescence / calcium staining
-
Brickwork checked
-
External window frames checked for scratches
-
External glass checked for scratches
-
Where zero overhang bricks to finish hard up behind fascia and barges
-
EXTERNAL
EXTERNAL
-
External Omission:
-
Add media
STANDARD INTERNAL - CHECK
-
Has the front door been painted / stained?
-
Has the cleaners removed the plastic of the front door glass?
-
Does the front entrance lock work and lock?
-
Main floor tiles installed and clean
-
Silicon complete to main floor tiles?
-
Are the hallway walls and cornices straight?
-
Check the garage panel lift door is operating?
-
Is the steel beam above the garage door painted and all trims in the garage complete?
-
Are there any stains on the garage slab?
-
Are the left of building materials stacked neatly?
-
Is all rubbish removed from the garage?
-
Powder room Vanity, top, mirror, tap and basins checked and there was no chips or scratches found
-
Powder room silicon complete, shower, splash backs, basin/bowl, openings, floor, cabinetry etc?
-
Powder room Shower screens check for leaks there was no leaks found
-
Are lift off hinges required to the wet area door?
-
Check robes that shelves installed, cleaned and doors open and close freely
-
Laundry tub or cabinetry, take photos and check that there are no stains, dents or large scratches found
-
Take photos under the laundry tub, plumbing connected and walls painted
-
Check laundry door, painted, cleaned and operational
-
Laundry silicon complete, splash backs, tub, openings, floor, cabinetry etc?
-
Kitchen Stone Bench tops have been checked there was no chips or scratches found
-
Kitchen Sink and under sink has been checked and no stains, dents or large scratches found
-
Kitchen Cupboard doors, panels and pantry shelves checked and no dents, chips or scratches found
-
Kitchen Glass or tiled splash backs checked and no dents, chips or scratches found
-
Kitchen silicon complete, splash backs, sink, openings, floor, cabinetry, bulkheads etc?
-
Ground floor Internal window frames have been checked and there was no scratches found
-
Ground floor Internal glass checked and there was no scratches found
-
Check under stairs, trims installed, painting, floor coverings, light works etc?
-
Staircase has been painted / stained?
-
If the staircase is stained, take close up photos of all the treads (tread by tread)
-
If the staircase has carpet, take photos of the carpets condition
-
If the staircase has glass panels, check for scratches or chips in the glass
-
If the staircase has metal or timber bars, check clean and tidy and excess paint removed
-
Carpet installed and clean
-
First floor Internal window frames have been checked and there was no scratches found
-
First floor Internal glass checked and there was no scratches found
-
Are all the window restricters installed?
-
Check robes that shelves installed, cleaned and doors open and close freely
-
Lower roof tiles checked there was no cracked or chipped tiles found
-
Lower metal roof sheets checked there was no dents or larges scratches found
-
Balcony handrails checked there was no dents or scratches found
-
Check balcony tiles and floor waste installed
-
Balcony posts /piers checks and no defects found
-
Vertical trims (32mm x 18mm) are installed to balcony and barge returns where brick meets hardie flex.
-
Check all Shower screens for leaks (run water against each corner of the shower screen)
-
Bath tubs checked and there was no chips or scratches found
-
Check all first floor vanities, tops, mirrors, taps and basins are checked and there was no chips or scratches found
-
Check all first floor vanity mirrors are installed and no cracks, chips or scratches found
-
FF wet room silicon complete, showers, splash backs, basin/bowl, openings, floor, behind bath, cabinetry etc?
-
Wet area floor tiles and floor wastes checked
-
Are lift off hinges required to the wet area doors?
INTERNAL
-
Internal Omission:
-
Add media
Presentation
-
Paint Touch Up's
- Paint Touch up's are complete
- Paint Touch up's have been dotted
- Paint Touch up's not dotted
- Paintwork Incomplete
-
House Clean
Manager's Approval
-
I, confirm the following;
- Practical Completion can proceed
- Practical Completion can not proceed
-
Name & Signature:
-
Anticipated date for the re-inspection:
-
ACM - Re-Inspection<br>The house can now proceed towards Practical Completion:
-
Name & Signature:
-
Date & Time:
Quality Report
-
Please tell us specifically what makes this home exceptional quality:
- The overall quality was exceptional
- The customers upgrades made the home exceptional
- The design and finish was exceptional