Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Trail Overview
-
Select date
-
Assessor:
-
Trail region:
- Lindisfarne/Geilston Bay
- Rosny/Tranmere/Bellerieve
- Cambridge/Seven Mile Beach/Acton
- Sandford North/Lauderdale
- Sandford South
- Cremorne/Clifton Beach
- South Arm/Opossum Bay
- Richmond
-
Trail name:
-
Map code:
-
Inspection Frequency:
- 3-6 months
- 6 months or less
- 6-12 months
-
Audit starting point:
-
Suitable users group:
- Walking/dog walking
- Running
- Mountain bike riding
- Horse riding
- Fire trail
-
Actual users group:
- Walking/dog walking
- Running
- Mountain bike riding
- Horse riding
- Fire trail
-
Usage level:
- Low
- Medium
- High
-
Is there appropriate signage at entrances? eg: distance, difficulty, track name, restrictions on use (motor bikes etc.)
-
Comments:
-
Access restricted:
- None
- Bollard
- Slip Rail
- Boom gate
- Other
-
Comments:
-
Photo:
Surfacing:
-
Surface materials:
- Dirt
- Red gravel
- Mudstone gravel
- Sand
- Grass
- Other
-
Notes on condition: eg: slippery, rutted.
-
Photo:
-
Comments:
-
Photo:
-
Average track width:
- <0.5m
- 0.5m-1m
- 1m-2m
- 2m+
-
If benching is used, is cutting on top side and filling on bottom side of track satisfactory? Eg: sufficient cross fall for drainage, is bottom side stable?
-
Comments:
-
Photo:
-
Track muddiness:
- None
- Low
- Medium
- High
- Running water
-
Are drainage systems present and functioning? eg: culverts, grips, swails, no sitting water.
-
Comments:
-
Photo:
-
Comment:
-
Photo:
Vegetation:
-
Are site lines clear?
-
Comments:
-
Photo:
-
Is the trail clear of dangerous trees/over hanging limbs?
-
Comments:
-
Photo:
-
Are trail edges clear of grass etc. at a height that does not require mowing or brush cutting?
-
Comments:
-
Photo:
-
Are the trail edges and trail weed free?
-
Comments:
-
Photo:
Environmental:
-
Is the trail free of rubbish?
-
Comments:
-
Photo:
-
Unapproved track alterations:
- None
- Bike jumps
- Detour
- Informal tracks branching off main track
- Removal of vegetation
-
Comments:
-
Photo:
-
Is the trail free of vandalism?
-
Comment:
-
Photo:
-
Is the trail free of unauthorised use? eg: 4wd, motorbike. Note some trails are used as fire trails and 4wd use will be visible.
-
Comments:
-
Photo:
Timber/stone structures:
-
If timber/stone structures are present are they in a safe and operable condition?
-
Comments:
-
Photo:
-
Recommended additional structures:
-
Comments:
Audit completion point:
-
Final point of audit:
-
Comments/general recommendations: