  • PROJECT NAME:

  • PROJECT ADDRESS
  • Project Status

  • INSTALLING CONTRACTOR

  • ROOF REF. (EG. SPORTS HALL)

  • PICTURE OF PROJECT

  • REASON VISIT

  • CONDUCTED BY

  • DATE

  • CARLISLE® Construction Materials Ltd
    Lancaster House
    Millennium Business Park
    NG19 7DW

  • Telephone - 01623 627285
    Email - info.uk@ccm-europe.com
    Web - www.ccm-europe.com/gb/

PROJECT VISIT

  • weather conditions

  • Temperature in C°

  • Project photo overview:

  • ROOFING CONTRACTOR PRESENT

  • GENERAL INFORMATION

  • Type project:

  • Other remarks:

ROOF SURFACE

  • ROOF SUBSTRATE

  • IF REFURBISHMENT PLEASE STATE

  • SUBSTRATE CONDITION

  • Overview picture(s) roof surface and/or drawing:

MATERIALS AND ROOF STRUCTURE

  • WATERPROOF COVERING

  • Production number:

  • ROOF BUILD UP

  • INSULATION TYPE

  • INSULATION THICKNESS

  • Vapour barrier:

  • Other:

  • Other remarks:

  • ON-SITE MATERIAL STORAGE

MEMBRANE INSTALLATION

  • PRIMER APPLIED IN ACCORDANCE WITH CCM INSTALLATION GUIDELINES

  • LAP WIDTH TO CCM INSTALLATION GUIDELINES

  • WELDED LAP TO CCM INSTALLATION GUIDELINES

  • VISIBLE BLEED 2-4MM

  • ROUNDED CORNERS

  • AUTOMATED WELDER

  • CORRECT WELDING NOZZLE BEING USED (40MM)

  • TEST WELD

  • ROOF EDGE DETAILS

  • UPSTAND DETAILS

  • INTERNAL CORNERS INSTALLED TO CCM INSTALLATION GUIDELINES

  • EXTERNAL CORNERS INSTALLED TO CCM INSTALLATION GUIDELINES

  • RAINWATER/OVERFLOW OUTLETS INSTALLED TO CCM INSTALLATION GUIDELINES

  • ROOF PENETRATIONS

  • SYSTEM ACCESSORIES

  • MECHANICAL FIXINGS AS SPECIFIED BY MANUFACTURER

  • MECHANICAL FIXING PLATES FITTED IN ACCORDANCE WITH WIND UP-LIFT CALCULATION

OBSERVATIONS AND RECOMMENDATIONS

  • OBSERVATIONS

  • IMAGE

  • COMMENTS

  • IMAGE

  • COMMENTS

  • IMAGE

  • COMMENTS

  • IMAGE

  • COMMENTS

  • IMAGE

  • COMMENTS

  • RECOMMENDATIONS

  • STATUS

  • CCM REPRESENTATIVE

  • CONTRACTOR REPRESENTATIVE

  • This audit has been undertaken to the areas as indicated and is restricted to accessible visable areas and unless otherwise stated has been non-destructive. The audit should not be regarded as a complete assessment of the roof and the ultimate responsibility of the quality of the workmanship is that of the installing contractor.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.