Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
JOB TASK OBSERVATION: DEVELOPMENT FACE DRILLING
-
Operator
-
Task Observed
-
Drill ID
-
Select date
PROCEDURE KNOWLEDGE AND COMPLIANCE
-
Pre-Operational Checklist Completed
-
Spill Kit On The Drill
-
Ground Support As Per The Ground Control Mangement Plan And Current Ground Contol Directives
-
Trailing Cable Connected Properly
-
Signs In Place (eg Danger - Trailing Cable, Drilling In Progress etc)
-
Cut Holes Are Driiled On Opposite Side From The Last Round
-
Lifter Tubes Are In Place
-
Bootlegs Identified And New Holes Not Drilled Within 150mm
-
Holes Not Drilled Into Halfbarrels
-
No Holes Within 2m Of Misfires
-
Breakthrough Round:
-
Breakthrough Excavation Inspected And Cleared Of Misfires
-
Approipriate Signs In Place On Breackthrough Side Of Round (eg Drilling In Progress)
-
Comments
-
Observer