Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

JOB TASK OBSERVATION: DEVELOPMENT FACE DRILLING

  • Operator

  • Task Observed

  • Drill ID

  • Select date

PROCEDURE KNOWLEDGE AND COMPLIANCE

  • Pre-Operational Checklist Completed

  • Spill Kit On The Drill

  • Ground Support As Per The Ground Control Mangement Plan And Current Ground Contol Directives

  • Trailing Cable Connected Properly

  • Signs In Place (eg Danger - Trailing Cable, Drilling In Progress etc)

  • Cut Holes Are Driiled On Opposite Side From The Last Round

  • Lifter Tubes Are In Place

  • Bootlegs Identified And New Holes Not Drilled Within 150mm

  • Holes Not Drilled Into Halfbarrels

  • No Holes Within 2m Of Misfires

  • Breakthrough Round:

  • Breakthrough Excavation Inspected And Cleared Of Misfires

  • Approipriate Signs In Place On Breackthrough Side Of Round (eg Drilling In Progress)

  • Comments

  • Observer

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.