JOB TASK OBSERVATION: DEVELOPMENT FACE LOADING
-
Name
-
Task Observed
-
Select date
PROCEDURE KNOWLEDGE AND COMPLIANCE
-
Proper Sings Are In Place Prior To Loading Activities (eg Loaded Round, Loading In Progress)
-
Leaky Feeder Blast Box Checked (eg Sufficient Charge, Good Leaky Feeder Signal etc)
-
Caps And Powder Stored On Opposite Sides Of The Drift Until Loading
-
Good Housekeeping
-
Face Hand Scaled And Free Of Loose Rock
-
Loading Hose Properly Primed With Product (Emulsion Loading Only)
-
Face Loaded From The Top Down
-
Perimeter Powder Corectly Loaded (18 inch Collars, Dynosplit Traced with B-Line)
-
Care Taken Not To Damage Shock Tube By Impact Or Pulling On The Tube
-
Hole Properly Cleaned Prior To Loading
-
Stick Powder Loaded Correctly
-
Det Cord Is Connected After The Round Is Loaded
-
Explosives Boxes Confirmed To Be Empty And Removed For Proper Disposal
-
Signs - Danger Loaded Round - Installed At All Access Points To Blast. NOTE: Is This A Breakthrough Round?
-
Blast Connected To Leaky Feeder Blast Box No More Than 1 Hour From Blast Time
-