JOB TASK OBSERVATION: DRILLING WITHIN 2m OF PREVIOUSLY BLASTED GROUND
-
Driller
-
Task Observed
-
Select date
PROCEDURE KNOWLEDGE AND COMPLIANCE
-
Appropriate Drill Plans
-
JHA Completed
-
Drill Plans Identify All Potential Drilling Hazards
-
Proper Signs And Barricades Are In Place At All Possible Access Points (Above/Below/In The Adjacent Drift)
-
Inspected For Misfired Explosives
-
Trailing Cable Connected Properly
-
2nd Person Present For Collaring Holes And Back-up On Remote Drilling
-
No Personel Infront Of Jacks When Drill Is Running
-
Driller And Spotter Retreat To A Safe Location When Drilling Remote
-
Driller And Spotter Do Not Return To The Rig Until All Rods Are Removed
-
Reason For Remote Drilling Is Understood By Driller and Spotter
-
Proper Signs And Baricades Are Posted Once Drilling Is Complete
-
Comment
-
Observer