Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
JOB TASK OBSERVATION: PRODUCTION DRILLING
-
Driller
-
Task Observed
-
Select date
PROCEDURE KNOWLEDGE AND COMPLIANCE
-
Proper Signs And Barricade Are In Place On The Bottom Sill (Longhole Drilling Above)
-
Proper Sings Are Up At The Entrance To The Work Area (Danger - Trailing Cable And Drilling In Progress)
-
Pre-Operational Checklist Is Complete
-
Spill Kit Is On The Drill
-
Proper Tie-Off Equipment Available On The Drill
-
Area Clear Of Hazards (eg Loose Rock, Services, etc)
-
Ground Support Checked
-
Area Inspected For Misfires - Face Singed Off
-
Trailing Cable Connected Correctly
-
Comments
-
Observer