Title Page

  • Project

  • Date of Report

  • Prepared by

  • Engineers on site

  • Is Fujitsu PC for these works?

  • Works fall under Fujitsu PC - RAMs, Work site pack or HS board visible on site in line with Fujitsu's Health and Safety policies

  • Works do not fall under Fujitsu PC - RAMs available on site in line with Fujitsu's Health and Safety policies

Activities Undertaken

  • Work Undertaken ie. Survey/ Installation/ Testing

Work Report

  • Location

  • Camera Locations
  • Camera

  • Proposed Camera Fix Point

  • Any restrictions identified with the location

  • Is the Proposed location suitable

  • Local Cabinet ID

  • Is there existing network switch within the cabinet

  • Is there sufficient capacity on the switch for all camera quantities?

  • Is there space within the cabinet to house an additional switch?

  • Are there network patch panels already available?

  • What free ports are available?

  • Are there network outlets available (within 3 meters of the camera)?

  • Are there existing CP available?

  • Is there a requirement for the CP?

  • Does the new CP require new containment to be installed?

  • Earthing of containment required

  • Levels of engineering effort required to install new containment? (Engineers/Shifts)

  • Cable Requirements

  • Cable Length

  • Is surge arrest (lightening protection) required to be installed?

  • Is new containment required for the cable installation

  • Length and Type of containment?

  • Earth containment required?

  • Levels of Engineering effort required to install the containment (Number of persons / shifts)?

  • Is tamper proof enclosure required?

  • Where will the internal CAT6 and external CAT6 be transitioned?

  • Can the cabling be installed on existing containment?

  • Permits required for installation?

  • Are any isolations required to be in place to enable the installation?

  • Is Fire Stopping required?

  • Access equipment required to be used?

  • Any additional requirements needed for the installation?

  • Any other addtional comments/ considerations?

End of Shift Report and Issues

  • Shift Update ( Give a detailed site report on all works completed)

  • Add Photos of DABS/NABS

  • Add Photos of POWRA Sheet

  • Add Photo of other additional documents completed

  • Did the job require to be stopped at any time for Health and Safety reasons?

  • Has the works created any new Hazards?

  • Have there been any complaints made about the job you have just completed?

  • Before you leave

  • Have you cleaned and tided up the work area after the job?

  • Have you left the task area in a safe condition?

  • End Time and Date:

  • Task/ Job Closed out by:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.