Title Page
-
Project
-
Date of Report
-
Prepared by
-
Engineers on site
-
Is Fujitsu PC for these works?
-
Works fall under Fujitsu PC - RAMs, Work site pack or HS board visible on site in line with Fujitsu's Health and Safety policies
-
Works do not fall under Fujitsu PC - RAMs available on site in line with Fujitsu's Health and Safety policies
Activities Undertaken
-
Work Undertaken ie. Survey/ Installation/ Testing
Work Report
-
Location
Camera Locations
-
Camera
-
Proposed Camera Fix Point
-
Any restrictions identified with the location
-
Is the Proposed location suitable
-
Local Cabinet ID
-
Is there existing network switch within the cabinet
-
Is there sufficient capacity on the switch for all camera quantities?
-
Is there space within the cabinet to house an additional switch?
-
Are there network patch panels already available?
-
What free ports are available?
-
Are there network outlets available (within 3 meters of the camera)?
-
Are there existing CP available?
-
Is there a requirement for the CP?
-
Does the new CP require new containment to be installed?
-
Earthing of containment required
-
Levels of engineering effort required to install new containment? (Engineers/Shifts)
-
Cable Requirements
-
Cable Length
-
Is surge arrest (lightening protection) required to be installed?
-
Is new containment required for the cable installation
-
Length and Type of containment?
-
Earth containment required?
-
Levels of Engineering effort required to install the containment (Number of persons / shifts)?
-
Is tamper proof enclosure required?
-
Where will the internal CAT6 and external CAT6 be transitioned?
-
Can the cabling be installed on existing containment?
-
Permits required for installation?
-
Are any isolations required to be in place to enable the installation?
-
Is Fire Stopping required?
-
Access equipment required to be used?
-
Any additional requirements needed for the installation?
-
Any other addtional comments/ considerations?
End of Shift Report and Issues
-
Shift Update ( Give a detailed site report on all works completed)
-
Add Photos of DABS/NABS
-
Add Photos of POWRA Sheet
-
Add Photo of other additional documents completed
-
Did the job require to be stopped at any time for Health and Safety reasons?
-
Has the works created any new Hazards?
-
Have there been any complaints made about the job you have just completed?
-
Before you leave
-
Have you cleaned and tided up the work area after the job?
-
Have you left the task area in a safe condition?
-
End Time and Date:
-
Task/ Job Closed out by: