Pre-commisioning checks
-
CONFIRM THE REQUIRED APPLIANCE HEAT OUTPUT RATING FROM THE DESIGNER / INSTALLER AND INSERT BELOW
-
KW
-
CUSTOMER ADDRESS
-
POST CODE
-
DATE CONDUCTED
-
TECHNICIANS NAME
-
Document number automatically entered *** DO NOT TYPE NUMBER****
-
APPLIANCE MAKE
-
APPLIANCE MODEL
-
SERIAL NUMBER
-
BURNER MAKE
-
BURNER MODEL
-
TYPE
-
TANK TYPE
-
FLUE TYPE
-
FUEL TYPE
-
CALL TYPE
Oil firing service and commissioning schedule
-
OIL STORAGE
- CHECKED
- PASSED
- FAILED
-
OIL SUPPLY SYSTEM
- CHECKED
- PASSED
- FAILED
-
AIR SUPPLY
- CHECKED
- PASSED
- FAILED
-
CHIMNEY / FLUE
- CHECKED
- PASSED
- FAILED
-
ELECTRICAL SAFETY
- CHECKED
- PASSED
- FAILED
-
HEAT EXCHANGER
- CHECKED
- PASSED
- FAILED
-
COMBUSTION CHAMBER
- CHECKED
- PASSED
- FAILED
-
PRESSURE JET BURNER
- CHECKED
- PASSED
- FAILED
-
VAPOURISING AND WALL FLAME BURNER
- CHECKED
- PASSED
- FAILED
- N/A
-
WALL FLAME BURNER (ADDITIONAL)
- CHECKED
- PASSED
- FAILED
- N/A
-
APPLIANCE SAFETY CONTROLS
-
HEATING SYSTEM SERVICE
-
CONTROLS CHECK
- CHECKED
- PASSED
- FAILED
-
SYSTEM CHECK - HOT WATER TYPE
- CHECKED
- PASSED
- FAILED
- N/A
-
SYSTEM CHECK - WARM AIR TYPE
-
IMPORTANT - THE COMMENTS BELOW MAY INCLUDE ADVICE ON REMEDIAL WORK NECCESSARY TO ENABLE THE INSTALLATION TO COMPLY WITH THE REQUIREMENTS OF BUILDING REGULATIONS , CONTROL OF POLLUTION AND BRITISH STANDARDS
-
COMMENTS
TEST RESULTS
-
AS REQUIRED BY BS5410-1 COMBUSTION TEST RESULTS HAVE BEEN PRODUCED ELECTRONICALLY . TEST RESULTS INSERTED BELOW
-
PUMP PRESSURE
-
PUMP VACUUM
-
DRAUGHT
-
CO2 %
-
FLUE GAS TEMP °C
-
EFFICIENCY NETT
-
EFFICIENCY % GROSS
-
SMOKE No.
-
CO (PPM)
-
EXCESS AIR %
-
NOZZLE SIZE
-
NOZZLE ANGLE °C
-
NOZZLE PATTERN
-
FLOW RATE (OIL) LOW CC/MIN
-
FLOW RATE (OIL) HIGH CC/MIN
-
FLOW RATE (DHW) COLD L/MIN
-
FLOW RATE (DHW) HOT L/MIN
SIGN OFF
-
CUSTOMER SIGNATURE
-
TECHNICIAN SIGNATURE