List contractors on site
Checking the contractor/ contractors have the relevant documentation to fulfil their responsibilities
-
Have you checked that the principle contractor or contractors has the capability and necessary skill,knowledge, training and experience to fulfill their duties.(Have they the most recent scope of works)
-
Has a project or client brief been issued to the projects team.(question the site agent on site specific pre construction issues)
-
Has the project team been provided with information about the existing site or structure ( pre-construction information, asbestos reports ) ?
-
Are suitable arrangements in place to manage health & safety throughout the project. ,( Check daily health & safety check list)
-
Where required, has an online F10 notification form been submitted to HSE to notify them of commencement of works.
-
Has project specific health and safety advise been sought ( site specific ie next river, electric sub station)
-
Is the asbestos R&D survey available
-
Has the asbestos be left in situ ( photo removal certification)
Project data/information ( check the latest programme of works)
-
Have you checked that a construction phase plan has adequately developed before works start.
-
Has a schedule of key activities been produced for the project.( Are you happy with the POW)
-
Has sufficient time been allowed to complete the key activities.
Checking principal contractors / contractor/ workers hold relevant documentation to carry out their tasks, required skills, training and experience.
-
Is there a visitors log book
-
Has the site induction been completed and signed for.
-
Do all contractors hold a valid CSCS card.
-
Do persons hold relevant valid certification to use specialist equipment ie scaffolds mewps etc ( and is it in date)
-
Is there a site specific risk assessment/ method statement been read and signed by contractors.
-
Is there any young under 18 years old workers on site.
-
If YES has a young persons risk assessment been completed.
Is the site being managed appropriately
-
On arrival was the site secure
-
Is the site security adequate.( Are there weak areas not covered by signage)
-
Is there an assembly point for emergencies.
-
Is there a sufficient amount of first aiders trained and in date .( Check site manager certificates)
-
Is there a health and safety notice board with required minimum standard and emergency contact details assembly point details.
-
Is there a procedure for reporting accidents / incidents and how they are recorded.
-
Are you satisfied that suitable welfare facilities have been provided before work starts on site.
-
Check the fire evacuation plan and is it current?
-
Is there a means to raise the alarm.
-
Is there enough fire signage internal & external
-
Is there a means to extinguish a fire ie portable extinguishers ( in date of service).
-
Add media
-
Are the people present on site wearing the minimum standards of PPE.
-
Are all hazards and risks identified through signage or notices
-
Is there a means of isolating work areas of high risk from other workers ie barrier/ danger tape.
-
Check if the current working with screwfix in on view and signed for.
SDM site visit specific questions
-
Check that 110volt is being used and check cable management
-
Have all site tools been PAT tested and in date .
-
Check the site house keeping
-
Is programme on track within time scales
-
Have you discussed any design changes with the PM
-
Quality of the SDM induction
-
Site manager knowledge of works programme.
-
Check insurance documentation for all contractors are they in date.
-
Summary of site visit
-
SDM details
-
Site Manager details