Information

  • Document No.

  • Site

  • Location
  • Project team on site

  • Conducted on

  • Prepared by

Site information

  • Landscaping areas of responsibility

  • Drainage survey completed

  • Warehouse ILS & cost code

  • Trade counter contact details

GA & GE Plans

  • M:\screwfix-data\corprorate data\trade counters\trade counters\format,development and property \stores\pre trading

External

  • Front elevation signage installed as per drawing?

  • LED lights to sign?

  • RH side elevation signage installed to drawing?

  • LED lights to sign?

  • LH side elevation installed as per drawing?

  • LED lights to sign?

  • Rear side elevation signage installed as per drawing?

  • LED lights to sign?

  • AO Frames and temporary banner frame installed as per drawing?

  • Bollards outside trade counter installed as per drawing, free from scratches and clean?

  • Fragile roof signs installed as per drawing?

  • Fire exit signs externally to fire doors and LMO if applicable

  • External alarm box (Defence)

  • Front door lock changed

  • LMO door lock changed

  • Goods in bell tested

  • Vinyl film to glazing

  • Camera covering the LMO door

Car Park

  • Car park lining complete (if applicable)

  • Car park ground no trip hazards

Warehouse & GIN Roller Shutter

  • Manual wind with chain stay

  • Roller shutter service completed

  • Door contacts

  • 24hr activation buzzer

  • Camera positioned correctly

  • Internal bollards with L plates fitted to shutter and bollards fitted correctly free from scratches and clean

  • 1no. Fused connection unit for goods in bell system, c/w bell, transformer and external bell push

  • Lighting installed to racking aisles and as per RCP drawing

Managers Bench

  • 1no. Single data by control box at high level for ADT

  • 3 No Double power sockets on the trunking and 3 No power in the locked cupboard and 3no. Double data points

Utilities

  • Gas shut off valve signage installed

  • Mains water shut off valve signage installed

Earth Bonding Strap Fitted To

  • Incoming gas main

  • Incoming water pipe

  • Building frame

  • Incoming main switchgear

Trade Counter

  • Cameras installed to specification and as per ADT drawings

  • Overall condition of back of counter, sealed to floor and walls

  • Flooring fitted behind counter

  • Warehouse floor decorated

  • Induction loop supplied and set-up

  • Fragile roof sign fitted to centre and open sides of the bulkhead

  • Trade counter internal clipper frames installed (landscape) + one portrait for legals

  • DDA counter sign fitted next to drop down section

  • All merchandising installed to drawing

  • Letterbox sealed where applicable

  • Shopfront doors

  • Shopfront doors silicone sealed

  • 'Screwfix' decals fitted to door(s)

  • Hearing loop sticker affixed to top hinge side of the door

  • Push/Pull signs fitted

  • Fire exit light above shop front door(s)

  • Over door heater installed and tested

  • Roller shutter manual handle or battery back up if newly fitted

  • Roller shutter tested, piston locks align/shoot bolts easily key operated

  • 10 double power and 13 data points (small & medium)

  • 15 double power and 16 data points (large only)

  • Cable protection fitted to drop section

  • Flooring & mat

  • Skirting sealed

  • Decorations

  • Ceiling

  • Lighting

  • Double power socket for vacuum cleaner

  • Panic alarms fitted as per specification to right of counter pod

  • Overall condition of front counter, sealed to floor and walls

  • PC's in position

Trade + Counter

  • Burford door installed correctly

  • Plumber / electrician decal fitted to Trade + door

  • Burford door silicone sealed

  • Push / Pull signs fitted

  • Flooring

  • Skirting sealed

  • Decorations

  • Ceiling

  • Lighting

  • Cameras installed to specification and as per ADT drawings

  • Overall condition of front of counter, sealed to floor and walls

  • PC's in position

  • Overall condition of the back of the counter, sealed to floor and walls

  • Panic alarms fitted as per specification, to left of the counter pod

  • 6no. Double power and 4no. Double data sockets

  • Cable protection fitted to drop counter

  • Trade + internal clipper frames fitted (portrait)

  • All merchandising installed to drawing

One to One Room

  • Flooring

  • Heating ,no heating to be fitted in cash offices

  • Spy hole fitted to door and tested

  • Panic alarm fitted by the door

  • 1no. Double data point to dado

  • Thumb turn lock to the door

  • Decorations

  • Ceiling

  • Lighting on switch?

  • Ventilation

  • Camera positioned above the safe ( safe door visible in front of worktop)

Staff Room

  • Flooring ( vinly only)

  • Heating on locked thermostat

  • Hot Water Heater

  • Temperature of water; temperature must be 50+ degrees

  • Space to receive fridge complete with socket

  • 2 x Low level cabinet with sink unit and cutlery drawer

  • 2 x high level cupboards

  • 1no. Twin socket above worktop

  • Thumb turn lock and key

  • Panic alarm by safe

  • Decorations

  • Ceiling

  • Lighting

  • 1no. Extraction fan c/w timer over-run linked to the lighting circuit. A minimum of 10 air changes per hour

Male Toilet

  • Signage

  • Flooring

  • Door stop

  • Pans

  • Toilet roll holder

  • Sink unit with '2 tile high' splash back

  • Temperature of water, temperature must be 50+ degrees

  • Electric hand drier with splash back below

  • 1no. Fused connection unit for the hand drier

  • Mirror

  • 1no. Hat & coat hook

  • Decorations

  • Ceiling

  • Lighting installed on PIR

  • Ventilation

Female & DDA Toilet

  • Signage

  • Flooring

  • Door stop

  • Pans

  • Toilet roll holder

  • Sink unit with '2 tile high' splash back

  • Temperature of water, temperature must be 50+ degrees

  • Electric hand drier with splash back below

  • 1no. Fused connection unit for the hand drier

  • Mirror

  • 1no. Hat & coat hook

  • Decorations

  • Ceiling

  • Lighting installed on PIR

  • Ventilation

  • DOC M pack installed

Fire Alarm

  • Surface mounted four zone panel

  • A4 colour and silver anodised framed zone chart is to be provided and positioned beneath the fire panel

  • Automatic detectors are to be positioned throughout the building

  • Manual call points are to be positioned at exit doors and consist of break glass units

Fire Exits

  • 24hr Activation (audible alarm when opened)

  • Door contacts

  • Steel door fitted with night drop bars ( No night bars in Scottish sites)

Last Man Out Door & Intruder alarm

  • Push pad and external locking mechanism

  • ADT keypad

  • Door contacts

  • Detectors installed as per drawing issued by ADT

Warehouse Racking

  • Polypal installation carried out to latest drawing and free from damage

  • Loading sheets attached to end of racking

Fire Extinguishers & Signage

  • Extinguishers installed as per drawing

  • Have all extinguishers got seal tags fitted

  • Adequate signage displayed

Emergency Lighting

  • Emergency lights tested in all areas?

Demonstrations & Issued Items

  • Warehouse heater to store manager by principle contractor project manager

  • Fire alarm system to store manager by electrician

  • Add signature

  • Mains board and lighting to store manager by electrician

  • Add signature

  • Mains board and lighting to store manager by electrician

  • Add signature

  • Security / alarm system to store manager by ADT

  • Add signature

  • O&M file issued to store manager by principle contractor project manager

  • Add signature

  • Keys issued to store manager by principle contractor project manager

  • Add signature

Sign Off

  • All snags to be completed within 1 week of handover date

  • Classification

  • Project Summary

Warranty visit

  • Select date

  • Store Manager

  • Store Development Manager

  • Principle Contractor PM

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.