Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Select date

Type of Capital Work

  • Please select the type of work that was completed:

  • Building Type

1.0 - Site Documentation

  • 1.1 - Was the work order left on site or given given to you?

  • 1.2 - Are the battery reading made available?

  • 1.3 - Have you been made aware that the as-built photos been uploaded to k-store?

  • 1.4 - Has the power plant documentation been left on site or made available to you? (IP Addresses, Firmware version, Software version)

  • 1.5 - Are asset tags on all the equipment installed?

  • 1.6 - Is there a placard for the site posted for asset tracking? CATS

  • 1.7 - Are you aware that the new equipment been scanned for CATS?

  • 1.8 - Are the cables in the shelter clearly identified?

2.0 - Site Safety

  • 2.1 - Does this site meet our Roof Top Safety program? If NO, please provide comments and or photos.

  • 2.2 - Are all other safety items in place, stairs, railing...? If no please provide comments or photos.

  • 2.3 - Was the site left in a relatively clean state inside and outside? If NO please provide comments and or photos.

3.0 - Site and Facilities

  • 4.1 - Is the site clear of issues with the outside work? (grounding, cable trays, tower lighting, roof issues)

  • 4.2 - Is the site clear of all issues with the inside work (grounding, cable trays, Ty-wraps, Velcro)

  • 4.3 Does the site meet your expectations and is operating normally from what you can tell?

  • 4.4 - If this site is on Rapid Deploy, is the radio getting its power from DC? If not and it's on AC power please notify the implementation technician to rectify.

  • 4.5 - Have you been informed that the alarms crossed connected and reporting into the NOCC?<br>

Sign Off

  • Overall how satisfied are with the work completed at this location. If your score is 5 or below, please use the "relevant information" section below to provide us with what could have made a difference with your score.

  • Auditor's signature (site tech)

  • Please email the audit to the Implementation TL responsible for your area. Jesse.weller@bell.ca or Matt.viens@bell.ca

  • Please enter any relevant information here that the Implementation team should be aware of to be corrected improved upon.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.