Foundation Checklist Pre-Pour
-
Form dimensions match plans
-
Penetrometer test completed. Attach scan of results to this form prior to submitting.
-
Plumbing verticals are in correct locations and fall within walls.
-
Main water sleeve in place, located within 2-3 feet of intended water shut off location
-
Plumbing located within footings are protected by sleeves
-
Plumbing verticals are decoupled from slab
-
Plumbing in footings has rebar saddle
-
Island conduit is in place, ends are capped. Conduit to be placed minimum 2-3” under vapor barrier and backfilled
-
Confirm if selections have any floor outlets @ 1st floor
-
Ufer Rod is in place and located within 2-3 feet of intended meter location
-
Verify top of slab for houses in flood zones. List measurements in notes section. Under construction Flood Cert scheduled
-
Benchmark Elevation
-
Slab height above BM
-
Benchmark Elevation
-
Slab height above BM
-
Foundation hold down locations spray painted on form boards
-
T-pole is in place and meter installed
-
Dumpsters in place
-
Lot signage in place including permit box
-
Port-a-let on site or maximum 3 lots away
Required Documents
-
Penetrometer test results
Signature
-
Superintendent Signature
-
Date completed