Information
-
Centerre Construction, Inc.
4100 E. Mississippi Ave Suite 1225
Denver, Colorado 80246 -
Report # and Date:
-
Report Prepared by:
-
Name:
-
Conducted on
Weather
Weather
-
Temperature:
-
Precipitation:
-
Wind:
-
Weather Delays?
-
Describe delay:
General Info
CONTRACTORS ON SITE AND WORK PERFORMED:
-
Contractors On Site
Contractor
-
Company
-
Company Name:
Personnel On Site
Work Performed:
-
Description of Work Performed and Location:
-
Work Photos
MATERIALS/DELIVERIES
-
Materials to report?
-
Material
Materials
-
Material Name:
-
Remarks:
-
Material Photos
SCHEDULE ITEMS/ISSUES:
-
Schedule items/issues to report?
-
Schedule Item/Issue
Item/Issue
-
Describe Schedule Issues/Item:
-
Is item a delay?
-
Reason for delay, activities impacted:
DESIGN ISSUES
-
Design issues to report?
-
Description
Design Issues
-
Item:
-
Source/Contractor
- Centerre
- Piper
- Other
-
Notes:
EQUIPMENT ON SITE:
-
Equipment on site?
-
Equipment On Job Site
Equipment
-
Select Equipment
-
Equipment Make/Model:
-
Company
-
Company:
-
Was Equipment Active?
-
Work Area:
QUALITY CONTROL
-
QC Items to report?
-
QC Item:
QC ITEM
-
Testing:
-
Inspections:
-
General Deficiencies Noted:
-
General Site Observations:
-
Notes:
-
Add media
MEETINGS
-
Meetings Held?
Meeting
-
Select date
-
Meeting Name/Description:
-
Meeting Minutes:
GENERAL NOTES:
-
Notes/Comments/Issues:
-
General Photos
Report Approval
APPROVAL
-
ON BEHALF OF THE CONTRACTOR, I (WE) CERTIFY THAT THIS REPORT IS COMPLETE AND CORRECT AND EQUIPMENT AND MATERIAL USED AND WORK PERFORMED DURING THIS REPORTING PERIOD IS IN COMPLIANCE WITH THE CONTRACT DRAWINGS AND SPECIFICATIONS TO THE BEST OF MY KNOWLEDGE, EXCEPT AS NOTED IN THIS REPORT.
-
Field Report Prepared By: