Title Page
-
Who does this Accreditation cover
-
Accreditation Date
-
Site Conducted
-
Prepared By
Questions
PPE and Site Safety
-
Correct PPE being worn for the task?
-
Risk assessment completed and highlighted risks to the task to be completed?
-
Working area made safe including tool items? (Guarding)
-
Correct equipment available and defect free?
Aerial Installation
-
Pole pre climb checks completed to the required Safety standard (Including pre climb label)
-
Demonstrates correct use of rods telescopic. Confirms all wires crossing carriageway above 5.2m
-
Equipment Check: Ladder, body harness (Including fall arrest lanyard and working belt) available and defect free
-
Ladder set-up and secured to pole - Tetra
-
Correct Climbing technique demonstrated (Safe, 3 points of contact
-
Aerial cable attached and formed correctly at ASN (Including power level check, One Click' fibre cleaning used)
-
Knowledge check: Correct fixing selected for property type
-
Aerial cable attached and formed correctly at House end
-
One Click' fibre cleaner used on both fibre port and connector before connecting together at both ends
-
Fibre tested to the required standard and with-in acceptable limits? (-15DB to -25DB)
-
Behaviour - Task completed in a safe and quality manner?
Summary
-
Additional Comments
-
Accreditation results