Title Page
-
Site conducted
-
Completion Date
-
Task Complete / Aborted
-
Prepared by
-
Location
-
S Reference
-
Permit Number
-
Excavation Size (Example: 450mm X 500mm)
-
Is this task complete or aborted?
-
Surface Type
-
Excavation
-
Excavation - Network / Damage
-
Excavation - Network / Repair
-
Excavation - Back fill
-
Excavation - Re-instatement
-
Waste Transfer Note Complete
-
Waste Removed (Photo of Area)
-
Site Closed Down (Full area aspect Photo - all equipment / waste removed)
-
Any near miss Incidents reported
-
Why was the task aborted
- Gas Detected (GDU Alarm)
- Weather Conditions
- Asbestos Duct (OR)
- Hazardous Waste
- High Risk Area (Personal Safety)
- Excavation Below 1 metre
- Other (Detail in 'Other' notes section)
-
Have you informed your Team Leader
-
Team Leader Informed
-
Photo Evidence for (Asbestos Duct (OR), Hazardous Waste, Excavation Below 1 metre)
-
Additional Supporting Photo Evidence (If Required)
-
Supporting Notes
-
Is the site closed down?
- Excavation Open (Siteset up left in place)
- Excavation Closed (Reinstatement Complete)
-
Site made safe and secure for the public?
-
Site Photo
-
Surface Type
-
Excavation
-
Excavation - Network / Damage
-
Excavation - Network / Repair
-
Excavation - Back fill
-
Excavation - Re-instatement
-
Waste Transfer Note Complete
-
Waste Removed (Photo of Area)
-
Site Closed Down (Full area aspect Photo - all equipment / waste removed)
-
Any near miss Incidents reported
Sign Off
-
Signature