Lockout /Tagout Procedures
-
Is LOTO required?
-
Has LOTO procedures been reviewed with the contractor?
-
Are all LOTO isolation points identified?
-
Have the energy dissipation been verified?
-
Have LOTO measures been implemented effectively?
Work Order Information
-
Did the contractor show up when expected or call 24 hrs in advance to reschedule?
-
Did the contractor check in and out with the site personnel?
-
Did the contractor have an approved defined scope of work or task list with them that they are working off of?
-
Did the contractor wear the appropriate PPE while performing the work?
-
Did the contractor complete the work per the approved design / scope of work / PM?
-
If a piece of equipment was a part of the work, is the unit free of leaks (oil, water, gas), in operating condition and clean?
-
Are comments clearly written including additional deficiencies and follow up work order numbers?
-
Was appropriate time charged to the work order?
-
Did the contractor properly fill out and leave an adequate service report?