Title Page
-
Facility/Line Segment
-
Conducted on
-
Prepared by
-
Location
-
Name of Operating Company (or owner)
-
Contacted by What Source
-
Name of Contractor
-
City/State/Zip
-
Section/Township/Range
-
County/State (if in Texas use block & survey)
Chaparral Energy Pipeline Data
-
Facility Name
-
Facility Code
-
Mile #
-
STK# or LAT/LONG
-
Depth of Pipe
Foreign Crossing Data
-
Type of Service
-
Type of Material
-
Outside Diameter
-
Wall Thickness
-
Type of Coating
-
Working Pressure
-
Depth Installed
-
Catholic Protection
-
Date Installed
-
Test Lead Location
-
Clearance Between Chaparral and Foreign Crossing (above or below)
-
Remarks
-
Is There a Maintenance/Atmospheric Corrosion Inspection
-
Employee Signature
-
Date
-
Supervisor Signature
-
Date