Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Mechanical Contractor
-
Is duct work installed?
-
Is fan mounted to curb and is roof flashing completed?
-
Are flex connectors installed on duct connections?
-
Is unit clean?
-
Have shipping bolts been removed?
-
Have motor/belts been checked for tension and alignment?
-
Is access for service provided?
-
Add signature
Electrical Contractor
-
Is power verified to disconnect?
-
Is access to electrical clear and per NEC?
-
Add signature
Control Contractor
-
Has control contractor completed point to point check?
-
Is access for service provided?
-
Is isolation damper wired/is interlock to louver damper completed?
-
Add signature
General Contractor
-
Is area clean and ready for exhaust?
-
Add signature
QMS
-
What is the submitted make/model?
-
What is the submitted voltage?
-
Has system been checked for readiness?
-
Add signature
Pre-Commissioning/Start-up Authority
-
Is system ready for start up?
-
Is system ready to enable auto sequencing?
-
Add signature
General Conditions, Photos, and Misc Notes
-
Add media