Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Select date
-
Add location
-
Initial Inspection
-
Follow-Up Inspection
Description of Location
A. Safety/Housekeeping
-
Scrap material picked up
-
Proper PPE being worn
-
Leading edge safety measures in place
B. Products
-
Mechanical Couplings-Anvil
-
Wet piping-2" and under-Black schedule 40
-
Wet piping-2.5" and larger-black schedule 10 pipe
-
"Sammy" Drive in Anchors
-
Verify sprinkler heads in ceilings are concealed pendents
-
Verify sprinkler heads in exposed areas shall be upright type, standard brass
-
Verify sprinklers in walls, ceilings, and soffits have escutcheon plates
C. Installation
-
Confirm all unused hangers have been removed
-
Verify piping runs parallel and perpendicular to building lines
-
Verify no piping travels above any electrical equipment
-
Verify there is a minimum of 1" of clearance above all upright sprinkler heads
-
Sprinkler heads below 8' in exposed areas to be provided with cages
-
Confirm all penetrations through sound and fire rated walls are caulked and fire-safed accordingly
-
Verify sprinkler heads are centered in ceiling tiles
-
Verify unions are installed adjacent to each valve
-
Verify drain valves are installed @ low points and labeled
-
Verify that hanger spacing on piping 2" and smaller does not exceed 12'
-
Verify that hanger spacing on piping 2" and larger does not exceed 15'
-
Verify that unsupported arm-over lengths to pendant heads does not exceed 12"
-
Verify that there is a hanger within 12" of the last takeoff on a pipe run to a pendant sprinkler head
-
Verify that there is a hanger within 4' of the last take off on a run to an upright head
-
Verify that all piping is supported from structure (not ductwork, raceways, etc.)
-
Verify ID signs are provided adjacent to all control valves, drains, and test connections
-
Verify each standpipe is labeled
-
Verify no pipe welding is occuring
-
Verify that all pipe ends are capped or sealed until final connection
-
Verify unused hangers are removed
-
Verify that all valves are installed with stems upright and horizontal
-
Verify that all valves/fittings have required access, clearance, and operation
-
Verify that chain wheel operators or ladders are provided for all valves not accessible from the floor
D. Storage and Protection
-
Materials are stored on dunnage and protected/covered
E. Required Testing (check one if applicable)
-
Rough-In Visual Inspection
-
Hydrostatic Pressure Test
-
Backflow Forward Flow Test
-
Test Alarm Devices
-
Main Drain Flow Test
F. Misc.
-
Contractor drawings are current set with applicable changes posted
-
Photos attached
-
BIM drawings attached
-
Details attached
-
Incomplete items moved to QUIT log?
-
Add media
-
Add media
Mortenson Signature
-
Add signature
WSFP/Martinez Signature
-
Add signature
Other Witnesses
-
Add signature
-
Add signature