Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Select date
-
Add location
-
Initial Inspection
-
Follow-Up Inspection
Description of Location
Safety/Housekeeping
-
Scrap material picked up
-
Proper PPE being worn
Installation
-
All unused duct hangers are removed
-
Ductwork wrapped when in storage or until final connection is made
-
Transfer duct in place at full height walls for return air using fiberglass duct board
-
Verify all balancing/volume dampers are installed in the open position
-
Verify volume dampers are installed on all exhaust duct taps to an exhaust grille
-
All volume dampers are installed on taps downstream of VAVs and FPBs
-
No damaged or dented ductwork
-
No ductwork installed over electrical panels or equipment
-
Sounds and fire caulking in place (Hilti CP 680)
-
Verify all duct joints and holes in the duct are sealed
-
36" wide duct and greater- pitch insulation to prevent water ponding
-
Hangers and supports installed outside insulation. Where gripple is used, ensure that the break in insulation is neatly taped over to hide the gripple
-
Outdoor ductwork- extend to inside face of outside wall and finish w/ (2) coats of Armaflex
-
Access doors open against system air pressure
-
Sheet metal flanges used where duct passes through interior partitions below ceilings and at exterior walls
-
All horizontal duct Leaving grease exhaust shall be pitched a 1/4"/ foot
-
Flexible ductwork shall not be less than 4' or more than 12'
-
Exposed mounting screws shall be pointed to match frame orientation
-
Duct supports hung straight and free of kinks or bends
-
Ducts held close to wall, overhead construction and other permanent enclosure elements
-
Conical or tapered taps with balancing dampers on all round ductwork take offs (except upstream of VAVS)
Insulation
-
Ductwork insulation per table
-
Insulation installed with smooth and even surfaces
-
Neatly beveled edge at interruption of insulation
-
All duct components (fire dampers, silencers, valves, etc.) are insulated
-
Ductwork insulation extended through all penetrations(walls, floors, ceilings, etc.)
-
All duct liner is not ripped and dry
-
Provide 1" clearance outside of insulation
-
Verify insulation on rectangular duct over 24" has pins in the bottom of insulation to prevent sagging. Pins should be taped over following installation
-
Verify insulation is not over compressed (I.e. 1.5" compressed below 1")
-
Install grease duct so a min. Of 6" and a max of 12" is maintained between duct and enclosure
Flexible Connections
-
Flexible duct connections installed at fan unit intake and discharge
-
Clear length equal between duct and fan around perimeter of opening
-
Fabric stretched taut
-
No metal-to-metal contact
Identification
-
Ductwork identified at 50' spacing, where exposed, where concealed by removable ceiling, and where it originate or continues into concealed enclosures
-
Ductwork identified with service and direction of flow in black or white stencil
-
All access doors identified with purpose and other instructions
-
Verify air flow is correctly indicated and clearly marked on all air terminal units
Misc.
-
Contractor drawings are current set with applicable changes posted
-
Photos attached
-
BIM drawings attached
-
Details attached
-
Incomplete items moved to QUIT log?
-
Add media
-
Add media
Additional Comments
Mortenson Signature
-
Add signature
RK Signature
-
Add signature
Additional Witnesses
-
Add signature
-
Add signature