Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Mechanical Contractor
-
Is unit installed per manufacturers instructions?
-
Are valves and gauges properly installed as required?
-
Is piping complete and tested?
-
Has piping been inspected by city/owner?
-
Are welds painted and marked?
-
Is piping insulated and labeled per spec?
-
Is the overall piping appearance acceptable?
-
Are frame bolts tightened per manufacturers spec's?
-
Are unions and flanges properly located for servicing?
-
Is PRV installed?
-
Has the cleaning and flushing plan been approved?
-
Add signature
-
Have seismic isolators been installed?
-
Have required drip legs and traps been installed?
-
Add signature
Control Contractor
-
Is access to control devices provided?
-
Has control contractor completed point to point checks?
-
Are control panel terminations complete and is panel clean?
-
Add signature
Electrical Contractor
-
Is power available to control panel?
-
Add signature
Insulation Contractor
-
Is insulation completed on piping as per spec?
-
Add signature
QMS
-
What is the submitted model number?
-
Has a systems check been performed?
-
Add signature
Commissioning Authority
-
Is system ready for start-up?
-
All must be signed off prior to start-up
-
Add signature
General Conditions, Photos, and Misc Notes
-
Add media