Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Select date
-
Add location
-
Initial Inspection
-
Follow-Up Inspection
Description of Location
Safety/Housekeeping
-
Scrap material picked up
-
Proper PPE being worn-Face shields required if shooting into concrete or cutting
Materials
-
Raupex 3/4" cross linked polyethylene
-
PVC Bend Guides at 90 degree bends
-
Nylon Zip Ties
-
Low-e slab shield for slab on grade applications
Installation
-
Minimum bend radius for cold bending shall not be less than FIVE times the outside diameter=4.375"<br>
-
Secure tubing to wire mesh every 2-3' along straight runs and on 180 degree turns at the top of the arc and at each side, 12" from the top of the arc
-
No tubing splices installed
-
Pressurize to 60 psig 24 hours prior to incasement
-
Do not extend pipe through expansion, construction, or working joints
-
Do not tighten manifold fittings more than 1/2 turn after hand tight
-
9" spacing between tubing per design basis<br>
-
Slab sensor located per Landscape drawings
-
Keep pipe 6" from edge of slab
-
No overlapped pipe
-
Minimum 2" concrete on top of tubing
Misc.
-
Contractor drawings are current set with applicable changes posted
-
Photos attached
-
BIM drawings attached
-
Details attached
-
Incomplete items moved to QUIT log?
-
Add media
-
Add media
Mortenson Signature
-
Add signature
RK Signature
-
Add signature
Additional Signatures
-
Add signature
-
Add signature