Title Page
1. GENERAL INFO
-
Site
-
Project Number
-
Crane Type
-
Fleet Number
-
Configuration
-
Main Boom (m)
-
Jib (m)
-
Derrick (m)
-
Runner
Hook
-
WLL (t)
-
# Reevings
-
Capacity (t)
-
Total Weight (t)
-
WLL (t)
-
# Reevings
-
Capacity (t)
-
Total Weight (t)
-
Ballast (t)
-
Central (t)
-
SL-Ballast (t)
-
SL-Ballast @ (m)
-
Crane Manual Rigging Drawing Reference
-
Sarens Lifting Drawing Reference
2. CHECK BEFORE LEAVING SITE
CRAWLER / OUTRIGGER
-
Crane is leveled within +/- 0,3° (0,5%)
-
Remarks
-
Crawlers / Outriggers are centered on load spreading mats
-
Remarks
COUNTER WEIGHT
-
Carbody and Superstructure counterweights are mounted according to above info
-
Remarks
-
All counterweights are secured correctly
-
Remarks
BOOM UP
-
Angle of main boom
-
Degrees
-
Degrees (°)
-
Angle of main boom
-
Remarks
-
Remarks
BOOM UP
-
Angle of jib (luffer)
-
Degrees
-
Degrees (°)
-
Angle of jib (luffer)
-
Remarks
-
Remarks