Title Page
-
Site
-
Project Number
-
Date of Inspection
-
Crane Type
-
Fleet Number
-
Serial Number
-
Crane Manual Rigging Drawing Reference
-
Sarens Lifting Drawing Reference
-
Configuration
-
Main Boom (m)
-
Jib (m)
-
Derrick (m)
-
Runner
-
Ballast (t)
-
Central (t)
-
SL-Ballast (t)
-
SL-Ballast @ (m)
HOOK
-
WLL (t)
-
# Reevings
-
Capacity (t)
-
Total weight (t)
-
WLL (t)
-
# Reevings
-
Capacity (t)
-
Total weight (t)
CHECK BEFORE BOOM ERECTION
CRAWLERS / OUTRIGGERS
-
Crane is leveled within +/- 0,3° (0,5%)
-
Crawlers/Outriggers are centered on load spreading mats
-
Crawlers/Outriggers are assembled correctly & crawlers are tensioned correctly
-
REMARKS
COUNTERWEIGHT
-
Carbody and Superstructure Counterweights are mounted according to lifting drawing
-
All counterweights are secured correctly
-
REMARKS
DERRICK
-
Length of the derrick mast is correct
-
All derrick mast pins are in place, including safety clips
-
Reeving of the derrick bridle has been checked. Rope retainers are in place
-
Derricking rope is spooled correctly on the drum & is greased properly
-
Number/length/position of the pendants are correct
-
All pendant pins are in place, including safety clips
-
REMARKS
MAIN BOOM
-
Length of the main boom is correct
-
Position and type of boom inserts are correct
-
All main boom pins are in place, including safety clips
-
Number/length/position of the pendants are correct
-
All pendant pins are in place, including safety clips
-
Intermediate suspension has correct length & position
-
REMARKS
JIB
-
Length of the jib is correct
-
Position and type of jib inserts are correct
-
All jib boom pins are in place, including safety clips
-
Number/length/position of the pendants are correct
-
All pendant pins are in place, including safety clips
-
Intermediate suspension has correct length & position
-
REMARKS
RUNNER
-
Position and type of runner is correct.
-
All pins are in place, including safety clips
-
REMARKS
LUFFING JIB BACKSTAYS & PENDANTS
-
All backstay pins are in place, including safety clips
-
Reeving of the luffing rope has been checked. Rope retainers are in place
-
Luffing rope is spooled correctly on the drum & is greased properly
-
Number/length/position of the backstay pendants are correct
-
All pendant pins are in place, including safety clips
-
REMARKS
REEVING OF HOIST ROPES (Main & auxiliary hoist)
-
The hook block is assembled correctly
-
Number of falls matches the load to be lifted
-
The reeving is in accordance to the crane manual. Rope retainers are in place
-
Sufficient length of hoist rope on the drum(s)
-
Hook block capacity matches the load to be lifted
-
Required minimum weight of the hook block is checked
-
Safety latches of the hook are in good order
-
Rope socket(s) are connected properly with the hoist ropes & are secured
-
Check the proper positioning & functioning of the hoist end limit switches
-
REMARKS
BEFORE RAISING BOOM
-
All tools are removed and all transport pins are secured in the storage brackets
-
All unused pendants are secured in transport position
-
Pendants are hanging completely free
-
Correct amount of SL-Ballast is installed & the SL-Radius is correct
-
Check correct functioning of Anemometer
-
Check correct functioning of Aircraft Warning Lights
-
Set SLI in erection mode & check for electrical connection failures
-
REMARKS
CHECKED AND APPROVED BY CRANE OPERATOR
-
Name
-
Date & Time
-
Signature
CHECK BEFORE LIFTING OPERATIONS
OPERATIONAL CHECKS
-
Check correct functioning of SLI
-
Check correct functioning of double hook block synchronization
-
Check SLI settings match installed configuration
-
Check correct functioning of limit switches
-
Check fuel, oil, and coolant level
-
REMARKS
CHECKED AND APPROVED BY CRANE OPERATOR
-
Name
-
Date & Time
-
Signature