Title Page

  • Name

  • Site & Project Number

  • Date

  • Fleet No

  • Manufacturer

  • Model

Equipment Experience

  • Date

  • Fleet No

  • Description

  • Manufacturer / Model

  • Years Experience

  • Date

  • Fleet No

  • Description

  • Manufacturer / Model

  • Years Experience

Take over checklist

  • All boxes should be checked by both parties (operators). Those not applicable should be endorsed NA

Equipment Specifics

  • Operation manual read and understood

  • Fluid level check/ refill points

  • Crane levelling

  • Statutory inspection/ Certification

  • Gear Box

  • Suspension system / Axle / Diff Locks

  • Steering system

  • Braking system

  • PTO system

  • Hoist system

  • Derricking system

  • Slewing system

  • Fly jib fitted and operated *

  • Ballast configuration

  • Location isolation switch

  • Complete Computer Management System

  • Superlift / Spanlift fitted and operated *

  • * If not fitted, it’s strictly prohibited for the Take Over Operator to use the fly jib!!
    ** Handing Over Operator certification may be through Grandfather-rights

Operation Specifics

  • Operators handbook

  • Crane handbook + Spec. Sheets

  • Crane instruction handbook

  • Lights and wipers

  • Operating temperatures

  • LMI / RCL

  • LMI / RCL mode numbers

  • Tele Sequences

  • High/ low speed operation

  • Override system

  • Line pull

  • Immobilizer system

  • Hand brakes/ lock pin

  • Drive operation

  • Electrical transfer plugs

  • Tackle as per register

  • Luffing jib fitted and operated*

  • Remark / Outstanding defects

  • * If not fitted, it’s strictly prohibited for the Take Over Operator to use the fly jib!!
    ** Handing Over Operator certification may be through Grandfather-rights

TAKE OVER

Take Over Operator

  • The Take Over Operator states that the operation of the above machine is fully understood

  • Name

  • Signature

Handing Over Operator

  • The Handing Over Operator**, in possession of a Certificate of Competence for the above machine, is confident that the Take Over Operator fully understands the operation of this machine.

  • Name

  • Signature

Manager

  • The Manager is satisfied that a sufficient and suitable handover has been completed and that the Take Over Operator has the experience and competence to operate the above machine.

  • Name

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.