Title Page
-
Audit Title
-
Rest:
-
Conducted on
-
Prepared by
-
Location
CHORIZO THAWING
-
Frozen bag(s) are placed onto a clean sanitized tray, no more than 2 bags per tray to allow for proper air circulation. Bags are labeled with 5-day discard date
-
Trays are placed in the walk-in refrigerator above raw products and thawed for 24-hours
CHORIZO PREPARATION
-
Bags of fully thawed Chorizo Crumbles are removed from the walk-in and emptied into a clean, sanitized, 1/3 size 6” deep pan
-
Using clean sanitized gloved hands, Chorizo is broken up into pieces
-
Pan is covered with a lid. Original 5- day discard date is transferred from bag onto pan
CHORIZO PORTIONING
-
Biscuits - Micro-tray boats are placed onto scale. Using clean sanitized gloved hands, 1 oz. of Chorizo Crumbles are portioned into a micro-tray boat. Trays of 1 oz. Chorizo portions are labeled with a “PROMO” label
-
Burritos - Micro-tray boats are placed onto scale. Using clean sanitized gloved hands, 2 oz. of Chorizo Crumbles are portioned into a micro-tray boat
-
Micro-tray boats of Chorizo Crumbles are placed onto clean sanitized trays and covered with plastic wrap. No more than 12 micro-tray boats per tray
-
Tray is labeled with 48-hour discard time, not to exceed original 5-day thawed discard date
-
Chorizo can be held in the pan with a lid under refrigeration (above raw products) for 5-days. Once the Chorizo is pre-portioned into the micro-tray boats, it must be used within the 48-hour discard time, not to exceed original 5-day discard time
ASSEMBLY & PACKAGING
-
Job Aid
-
Packing Instructions
-
The new products preparation and packaging is demonstrated to standard
GUEST SERVICE & EXECUTION
-
Cashiers are scripting the Chorizo Breakfast Burrito during breakfast daypart
-
Cashiers are properly trained and have tasted the new products so they can describe it to Guests
TRAINING MATERIAL
-
Job-aids are posted on the cook’s line
-
Nutritional information has been placed near the frontline area for employee reference
PERSON IN CHARGE (General Manager, Shift Leaders, Station Leaders)
-
ADQs
-
Person in Charge knows the sales projections (ADQs) for the new product
-
Person in Charge is demonstrating MODEL-COACH-REQUIRE as needed to enforce proper standards and procedures to deliver a HOT, HIGH QUALITY product to Every Guest, Every Time!
POP POSTING
-
The POP is posted correctly, in a timely manner and with correct pricing
-
Mgt. Signature