Title Page
-
Location
-
Inspection Title
-
Conducted on
-
Prepared by
Section A: Key Cinema Data
-
A1: Location & description of cinema
-
A2: Postal Address
-
A3: General Manager
-
A4: Facilities Manager
-
A5: Date of Construction
-
A6: History (previous ownership/brands)
-
A7: Date/extent of last refit
-
A8: Retail offers (B&J, Costa, etc)
Current number of seats/screens
-
Screen number
-
Standard seats
-
Premier seats
-
Wheelchair spaces
-
Total number of seats to screen
-
Total number of current seats
-
Current attendance
Estimated target number of seats (recliners)/screen
-
40% of current
Screen Number
-
Recliner
-
Wheelchair spaces
-
PLF
-
Total target number to screen
-
Total number of estimated target seats
-
Projected attendance
Reports/Building Information
-
Asbestos report available?
-
Asbestos Report conclusions
-
Building Manual available?
-
Health & Safety File available?
-
Measured building plans, sections & elevations available
-
Known issues
-
eg Health and safety concerns; services issues; mass barrier ceilings tests; trip hazards; recent claims; etc
-
Other
-
Add media
SECTION B: Location & Arrival
-
B1: Ease of finding
-
B1: Ease of finding - comments/recommendations
-
B2: Car Parking - location & number
-
B3: Access by public transport
-
B3: Access by public transport - comments/recommendations
-
B4: Access by foot
-
B4: Access by foot - comments/recommendations
-
B5: Visibility of entrance from locality
-
B5: Visibility of entrance from locality - comments/recommendations
-
B6: Building signage
-
B6: Building signage - comments/recommendations
-
B7: Ease of access into building (level/ramps/steps)
-
B7: Ease of access into building - comments/recommendations
-
B8: Adequacy of doors
-
B8: Adequacy of doors - comments/recommendations
-
B9: Other
-
Add media
SECTION C: Foyer
-
C1: Appropriate size?
-
C1: Appropriate size - comments/recommendations
-
C2: Use of space
-
C2: Use of space - comments/recommendations
-
C3: Logical layout?
-
C3: Logical layout - comments/recommendations
-
C4: Ease of orientation
-
C4: Ease of orientation - comments/recommendations
-
C5: Ticketing (eg FTMs; box office)
-
C5: Ticketing - comments/recommendations
-
C6: Retail offer (counter arrangement; hot food; ice cream; pick n mix; etc)
-
C6: Retail offer - comments/recommendations
-
C7: Other offers (eg coffee; bars; etc)
-
C7: Other offers - comments/recommendations
-
C8: Quality of finishes
-
C8: Quality of finishes - comments/recommendations
-
C9: Internal signage (clarity & appeal)
-
C9: Internal signage - comments/recommendations
-
C10: Overall aesthetic appeal
-
C10: Overall aesthetic appeal - comments/recommendations
-
C11: Primesite or other 3rd party sales
-
C11: Primesite or other 3rd party sales - comments/recommendations
-
C12: Other
-
C12: Other - comments/recommendations
-
Add media
SECTION D: Concourse
-
D1: General Service Points
-
D1: General Service Points - comments/recommendations
-
D2: Posters & display (quads; digital)
-
D2: Posters & display - comments/recommendations
-
D3: Screen entrances (visibility, numbering)
-
D3: Screen entrances - comments/recommendations
-
D4: Internal signage (clarity & appeal)
-
D4: Internal signage - comments/recommendations
-
D5: Waste bins
-
D5: Waste bins - comments/recommendations
-
D6: Quality of finishes
-
D6: Quality of finishes - comments/recommendations
-
D7: Overall aesthetic appeal
-
D7: Overall aesthetic appeal - comments/recommendations
-
D8: Other
-
D8: Other - comments/recommendations
-
Add media
SECTION E: Auditoria
-
E1: Existing auditoria
-
E1: Existing auditoria - comments/recommendations
-
E2: Current seat types
-
E2: Current seat types - comments/recommendations
-
E3: Viewing angles & sightlines
-
E3: Viewing angles & sightlines - comments/recommendations
-
E4: Wheelchair spaces (number; locations & viewing angles)
-
E4: Wheelchair spaces - comments/recommendations
-
E5: Screen size
-
Is the screen al large as it could be; rearmost seats >26 degrees horizontal
-
E5: Screen size - comments/recommendations
-
E6: Acoustic reverberation control (target 0.3s)
-
E6: Acoustic reverberation control - comments/recommendations
-
E7: Sound systems
-
E7: Sound systems - comments/recommendations
-
E8: Projection systems
-
E8: Projection systems - comments/recommendations
-
E9: Environmental control
-
E9: Environmental comfort - comments/recommendations
-
E10: Quality of lighting
-
E10 - Quality of lighting - comments/recommendations
-
E11: Quality of finishes
-
E11: Quality of finishes - comments/recommendations
-
E12: Overall aesthetic appeal
-
E12: Overall aesthetic appeal - comments/recommendations
-
E13: Other
-
E13: Other - comments/recommendations
-
Add media
SECTION F: Toilets
-
F1: Location(s)
-
F1: Location(s) - comments/recommendations
-
F2: Compliance with BS (based on current seat numbers)
-
F2: Compliance with BS (current seat numbers) - comments/recommendations
-
F3: Compliance with BS (projected seat numbers)
-
F3: Compliance with BS (projected seat numbers) - comments/recommendations
-
F4: Accessible WCs (location & distance to seats)
-
Distance should be <40m from wheelchair locations
-
F4: Accessible WCs - comments/recommendations
-
F5: Baby change facilities
-
F5: Baby change facilities - comments/recommendations
-
F6: Quality of finishes (cleanability)
-
F6: Quality of finishes - comments/recommendations
-
F7: Adequacy of ventilation
-
F7: adequacy of ventilation
-
F7: Adequacy of ventilation - comments/recommendations
-
F8: Adequacy of lighting
-
F8: Adequacy of lighting
-
F8: Adequacy of lighting - comments/recommendations
-
F9: Overall aesthetic appeal
-
F9: Overall aesthetic appeal - comments/recommendations
-
F10 - Other
-
F10 - Other - comments/recommendations
-
Add media
SECTION G: Staff & Ops
-
G1: FILO door (location & adequacy)
-
G1: FILO door - comments/recommendations
-
G2: Office accommodation (location & adequacy)
-
G2: Office accommodation - comments/recommendations
-
G3: TAB (location & adequacy)
-
G3: TAB - comments/recommendations
-
G4: Staff rest room (location & adequacy)
-
G4: Staff rest room - comments/recommendations
-
G5: Service yard & deliveries
-
Ease of access to stores
-
G5: Service yard & deliveries - comments/recommendations
-
G6: Retail stores & prep area (location & adequacy)
-
G6: Retail stores & prep area - comments/recommendations
-
G7: Cleaners' store (location & adequacy)
-
G7: Cleaners' store - comments/recommendations
-
G8: Ushers' stores (location & adequacy)
-
G8: Ushers' stores - comments/recommendations
-
G9: Projection room
-
G9: Projection room - comments/recommendations
-
G10: Waste management & recycling
-
G10: Waste management & recycling - comments/recommendations
-
G11: Other
-
G11: Other - comments/recommendations
-
Add media
SECTION H: Services & Systems
-
See appropriate detailed reports by services consultants/contractors
-
H1: HVAC systems
-
H1: HVAC systems - comments/recommendations
-
H2: Water services (adequacy)
-
H2: Water services - comments/recommendations
-
H3: Gas services (adequacy)
-
H3: Gas services - comments/recommendations
-
H4: Electrical wiring
-
H4: Electrical wiring - comments/recommendations
-
H5: General lighting
-
Include extent of LED lighting
-
H5: General lighting - comments/recommendations
-
H6: Emergency lighting
-
H6: Emergency lighting - comments/recommendations
-
H7: Fire alarm
-
Open or closed protocol?
-
H7: Fire alarm - comments/recommendations
-
H8: Security system
-
H8: Security system - comments/recommendations
-
H9: IT/Comms
-
H9: IT/Comms - comments/recommendations
-
H10: Server
-
H10: Server - comments/recommendations
-
H11: Lifts & escalators
-
H11: Lifts & escalators - comments/recommendations
-
H12: Other
-
H12: Other - comments/recommendations
SECTION I: Refit Objectives/Proposals
-
I1: Brief description of main recommended refit objectives (eg recliner seating; complete refit)
-
I2: Number of existing screens
-
I3: Number of existing seats
-
I4: Number of proposed screens
-
I5: Number of proposed seats
-
Recliner seating
-
I7: Toilet refurb
-
I8: Foyer refurb
-
I9: New retail
-
I10: PLF
-
I11: Dining/Café/Bar
-
I12: Costa
-
I13: Externals & signage
-
I14: HVAC
SECTION J: Construction Constraints
-
J1: Construction access restrictions
-
J1: Construction access restrictions - comments/recommendations
-
J2: Site compound location
-
J2: Site compound location - comments/recommendations
-
J3: Closure requirements/recommendations
-
J4: anticipated construction period (based on initial proposals)
-
J5: Risks
-
J6: Other