Information

  • Field Safety Officer - WHS Site Audit

  • Site Location

  • Conducted on

  • Inspection Completed by Rick Fox

Scope of Works

  • Team Leader

  • Team Members

  • Department

  • Planned Works This Shift

Risk Assessment Method Statements

  • Stores & Porters Creek Depot

  • Confined Spaces Entry to Porters Creek

  • Store Operations

  • Screening of Recycleable Construction Waste

  • Porters Creek Loader Operation

  • Forklift Operations in Depot

  • Civil Construction

  • Footpath, Construction, Repair and Maintenance

  • Landscape Construction

  • Landscape Construction in Bushland

  • Road, Drainage, Kerb & Paving

  • Roadworks Maintenance

  • Storm Water Pit Mantenance

  • Watercourse & Creekline Construction & Rehabilitation

  • Advanced Excavation Tree Planting

  • Public Domain

  • Street Sweeper

  • Asbestos Removal

  • Cleaning Amenities & Bus Shelters

  • Waste Collection with a Compactor

  • Dumped Rubbish Removal

  • Night Shift Cleaning, Dumped Rubbish

  • Street Furniture, Signage Installation or Repairs

  • Town Centres Waste Collection

  • Sports Grounds, Regional Parks & Gardens

  • Chemical Spraying (Tractor Boom)

  • Chemical Spraying (Hand Held)

  • Linemarking

  • Garden Maintenance

  • Broad Acre Mowing Tractor

  • Seasonal Sports Changeover

  • Wicket Preparation

  • Wading Pool / Water Feature Cleaning & Maintenance

  • Waste Collection (Sports Grounds)

  • Turf & Sportsground Maintenance with Small Plant

  • Passive Parks & Streetscapes

  • Broad Acre Mowing

  • Pruning Community Land

  • Chemical Spraying (Hand Held)

  • Chemical Spraying (Tractor Boom)

  • Garden Maintenance

  • Nature Strip Mowing

  • Pruning (Removal of Trees)

  • Tree Pruning Adjacent to Power Lines

  • Turf & Park Maintenance with Small Plant

  • Waste Collection

  • Working at Heights

  • Building Services

  • Carpentry Work

  • Electrical Works Inspection

  • Height Safety

  • Mechanical Equipment Services/Inspection

  • Painting

  • Plumbing & Hydraulic Unit Inspection

  • Toilet Cleaning

  • Stick Nailer

  • Wood Thicknesser

Field Safety Officer Site Audit

  • Do any of the following require corrective action?

  • Has the Pre-Start Meeting Sheet been completed? (For work teams of more than 2 workers)

  • Corrective Action Required

  • Has a pre-operational check of mobile plant and machinery been completed?

  • Corrective Action Required

  • Do all workers have the required PPE?<br>

  • Corrective Action Required

  • Are Mandatory / Danger / Advisory signs in place and clearly visible?<br>

  • Corrective Action Required

  • Is the site clean and tidy?

  • Corrective Action Required

  • Is site access and egress established and clear?

  • Corrective Action Required

  • Workers appropriately trained for task?

  • Corrective Action Required

  • Are all workers inducted on to the WMS?<br>

  • Corrective Action Required

  • Is Fall Prevention / Edge Protection in place?

  • Corrective Action Required

  • Are staff using correct manual handling techniques?

  • Corrective Action Required

  • Are Vehicular / Traffic controls are in place?

  • Corrective Action Required

  • Is mobile Plant in use (Excavator, Bobcat, Backhoe or Dingo)

  • Name of Operator

  • Do plant operators have a Licence, Ticket or Certificate of Competency?

  • Stop job Immediately and contact supervisor.

  • Is the work area barricaded / secured? (Trenches, Pits, ect)

  • Corrective Action Required

  • Are all required Safey Data Sheets available?

  • Corrective Action Required

  • When not in use, are tools stored correctly?

  • Corrective Action Required

  • Have Hazardous Utilities been identified? (Water, Power and Gas)

  • Corrective Action Required

  • Are electrical tools tagged and in test date?

  • Corrective Action Required

  • If electrical leads are in use, are they suspended off the ground / not impeding pedestrians or motorists?

  • Corrective Action Required

  • Are RCD Boxes / Circuit breakers being used?

  • Corrective Action Required

  • Is the correct "Working at Heights" method being used?

  • Corrective Action Required

  • Are Amenities available and are they clean?

  • Corrective Action Required

  • Are Sub-Contractors working on the same site?

  • Have Safe Work Method Statements been supplied?

  • Corrective Action Required

  • Do plant operators have a Licence, Ticket or Certificate of Competency?

  • Corrective Action Required

  • Are Sub-Contractors complying with City of Ryde requirements?

  • Corrective Action Required

  • Environmental Controls

  • Is sediment control in place?

  • Corrective Action Required

  • Is a spill kit available?

  • Corrective Action Required

  • Has dust been minimised / controlled

  • Corrective Action Required

  • Has Noise been minimised / controlled?

  • Corrective Action Required

  • If Environmental Controls have been implimented, list them here in bullet point.

  • Site Photos

First Aid

  • Is First Aid Placarding on the Vehicle to show the location of the First Aid Kit? (White Cross on Green Background)

  • Fleet Number

  • Is there a nominated First Aider on site?

  • Name of First Aider/s

  • Is an audit of the First Aid kit being conducted?

  • First Aid Kit Contents List

  • Instructions for providing first aid, Including CPR (1)

  • Quantity Required

  • Notebook and Pen (1)

  • Quantity Required

  • Resuscitation face mask or shield (1)

  • Quantity Required

  • Disposable Nitrile Gloves (5 Pairs)

  • Quantity Required

  • Gauze pieces sterile 7.5cm x 7.5cm 3 per pack (5 packs)

  • Quantity Required

  • Saline 15mL (8)

  • Quantity Required

  • Wound Cleaning wipe single 1% Cetrimide BP (10)

  • Quantity Required

  • Adhesive Dressing Strips Packet of 50 (Band Aids) (1)

  • Quantity Required

  • Splinter Probes Single Use (10)

  • Quantity Required

  • Tweezers/Forceps

  • Quantity Required

  • Antiseptic Liquid/Spray 50mL (1)

  • Quantity Required

  • Non-adherent wound dressing/pad 5cm x 5cm small (6)

  • Quantity Required

  • Non-adherent wound dressing/pad 7.5cm x 10cm medium (3)

  • Quantity Required

  • Non-adherent wound dressing/pad 10cm x 10cm large (1)

  • Quantity Required

  • Conforming Cotton Bandage 5cm wide (3)

  • Quantity Required

  • Conforming Cotton Bandage 7.5cm wide (3)

  • Quantity Required

  • Crepe bandage 10cm (1) FOR SERIOUS BLEEDING AND PRESSURE APPLICATION)

  • Quantity Required

  • Scissors

  • Quantity Required

  • Non stretch hypo-allergenic adhesive tape - 2.5cm roll (1)

  • Quantity Required

  • Safety pins pack of 6 (1)

  • Quantity Required

  • BPC wound dressings No.14, medium (1)

  • Quantity Required

  • BPC wound dressings No. 15, large (1)

  • Quantity Required

  • Dressing - Combine Pad 9cm x 20cm (1)

  • Quantity Required

  • Plastic Bag - Sealable (1)

  • Quantity Required

  • Triangular Bandage (2)

  • Quantity Required

  • Emergency Rescue Blanket (1)

  • Quantity Required

  • Eye Pad - Single Use (4)

  • Quantity Required

  • Hydro Gel 3.g sachets (5) or Access to 20mins of clean running water

  • Quantity Required

  • Instant Ice Pack (1)

  • Quantity Required

Review

  • Does the current Work Method Statement reflect the work being carried out?

  • Provide information regarding out of date WMS

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.