Information
-
Date and time
-
Contractor name
-
Company name
-
Customer address
LIC DATA
-
LIC Present?
-
If YES LIC diameter
-
If YES LIC material
-
Reason for not using Telstra LIC
Civils sor
-
02-02-00-01NA: Supply and install underground pipe with an internal diameter of more than 25mm and equal to or less than 50mm by any means in OTR (other than rock)
-
Add media
-
02-02-00-02 Supply and install underground pipe with an internal diameter of greater than 50mm by any means using in OTR (other than rock)
-
Add media
-
02-02-00-03 Extra over for Supply and install 2 underground pipes in an existing trench with an internal diameter of greater than 25mm
-
Add media
-
02-02-00-04 extra over rate for the supply and install of pipe in rock by any means?
-
Add media
-
02-02-00-05 : Supply and install riser on pole or building.
-
Add media
-
02-03-00-01 Supply and Installation of medium (p4 and p5) pits at any locations in OTR (other than rock)
-
Add media
-
02-03-00-02 Supply and Installation of large pits (p6 and p8) at any locations in OTR (other than rock)
-
Add media
-
02-03-00-03 Supply and Installation of extra large (p9) pita at any location in OTR.
-
Add media
-
02-03-00-04 extra over rate for the Supply and Installation of pit in rock?
-
Add media
-
02-03-00-07 removal and disposal of medium (p4 and p5) ACM pit.
-
Add media
-
02-03-00-08 removal and disposal of large (p6or p8) ACM pit.
-
Add media
-
02-03-00-09 removal and disposal of extra large (p9) ACM pit.
-
Add media
-
02-04-00-03 core bore
Pipe proving blockages and hauling
-
03-01-00-01 pipe proving in existing duct.
-
Add media
-
03-01-00-02 pipe proving in existing riser on a pole or in existing riser on the external face of a building.
-
Add media
-
03-02-00-01 identify and repair a damaged and blocked duct in any surface.
-
Add media
-
03-02-00-02 clear pipe blockage using high pressure water.
-
Add media
-
03-03-00-06 installation of hardline in underground duct by any means.
-
Add media
-
03-03-00-07 installation of hardline in an existing riser on a pole or in an existing riser on the external face of a building.
-
Add media
-
03-03-00-08 removal of hardline in underground duct.
-
Add media
Sdu leadins
-
20-01-02-06 installation of tie cabling from PCD to wall plate.
-
Add media
-
51-01-00-04 installation of a coaxial drop cable on a single span
-
Add media
-
51-01-00-05 extra over rate for installation of a new coaxial drop cable in span
-
Add media
-
51-01-00-08 extra over for supply and installation of rooftop raiser on a building.
-
Add media
-
51-01-00-09 extra over rate for additional spans for aerial coaxial service drop.
-
Add media
-
51-02-00-01 single dwelling unit leadin connection survey.
-
Add media
-
51-02-00-04 extra over rate for the supply and install of new leadin pipe minimum charge 3 metres route length, by any means.
-
-
Add media
-
51-02-00-05 extra over rate to repair leadin conduit.
-
Add media
-
51-02-00-06 supply and install of y connectors.
-
Add media
-
51-02-00-09 installation of non aerial coaxial service drop.
-
Add media
-
20-01-02-08 extra over for installation of lockbox pcd
-
Add media
-
55-06-07-10 supply and install pit riser.
-
Add media
-
55-06-07-11 supply and install pit lids.
-
Photo 1
-