CSC to confirm if religious ceremony is required by client
Site identification
-
Will site require further information on orders for location of property. Eg, new estate, not in GPS etc
-
Is site located in a private estate that requires a security code for access
-
Are boundary identification pegs evident
-
Will site require identifiction survey prior site start
-
Do any retaining walls or boundary fences need to be removed prior or during construction
-
Will retaining walls be required prior earthworks or after earthworks and prior slab or both
-
Are any services, eg power, Telstra, sewer, stormwater be required to be installed prior retaining walls being constructed
-
If acreage job, is earthworks platform position clearly defined<br>
Site condition
-
Will site require slashing / mowing prior site start
-
Will trees require removal prior site start
-
Are any trees overhanging neighbouring properties
-
Is site clean of all debris
-
Is kerb damaged.
-
If footpath on property, is there any cracks / breakages
-
Is there a possibility of construction traffic damaging footpath
-
Are there stormwater kerb adapters in place
Location of electrical and communication services
-
Is underground power available
-
Is underground power pillar damaged
-
Is overhead power available
-
If acreage, approx what distance is it from road pole to within 6 mts of building platform.
-
If acreage, is client responsible to install power to within 6 mts of building platform
-
Will overhead powerlines be with 3mts moving plant
-
Will overhead powerlines be within 4 mts of scaffold
-
Is overhead mains power to go to builders overhead temporary pole.
-
Is a property pole required due to position of street overhead power poles
-
If answers above is yes. Is property pole position suitable as shown on site plan
-
Is overhead mains power to go to builders overhead temporary pole.
-
Will site require *Overhead Hi Visibility Flag Structure* to construction access gates.
-
Is Telstra pit visible
-
Is Telstra lid or pit damaged
-
Is there a separate communication pit. Eg, normally in gated estates.
-
Is communication pit or lid damaged
Location of water, stormwater and sewer services vacant lot
-
Is water meter installed
-
Is water meter box damaged
-
Are stormwater kerb adapters installed
-
Is kerb type barrier
-
Is kerb type rollover
-
Can stormwater achieve fall to street or council service connection point
-
Is council sewer manhole installed
-
Is council sewer manhole cover damaged
If acreage, supply of water, rainwater tank and treatment plant services
-
If acreage, is town water available
-
If above answer no. Is client responsible for temporary water for construction purposes
-
Is Clarendon to supply and install rainwater tank and treatment plant
-
Is Client to supply and install rainwater tank and treatment plant
Access and storage of material to site
-
Will traffic control be required due to being within 100 mts of the following<br><br>Traffic lights, school, hospital, bus stop, nursing home, blind corner, main rd
-
Is the property on a RTA road
-
Will deliveries stop or disrupt traffic
-
Will deliveries stop or disrupt pedestrians on footpath
-
Is adequate parking adequate for trades
-
Is there clearway lanes, no stopping lanes, no parking signage, no standing to construction access gates
-
Is additional protection of neighbouring properties from falling objects or mortar / render splashes be required, eg shade cloth, kickboards.
-
Is there enough room for storage of materials
-
Will any building materials have to be delivered prior slab pour
-
Will there be additional excess soil removal on this site from earthworks, drainage or slab preparation.
-
Will extra *all weather access material* be required, eg red soil, small allotment, steep access etc
Knockdown / rebuild jobs
-
Has original home been demolished
-
If yes, is there any debris remaining on site
-
Will additional import fill be required
-
Is the sewer connection capped off above ground level
-
Is the water meter still in place
-
Is the stormwater connections capped off above ground level
-
Is there underground gas line, if yes, is it terminated and what side of street is main on
-
Is there overhead power, if so, what side of the road is the mains line
-
Has a identification survey been completed
-
Is crossover existing, if yes, is it damaged
-
Is footpath existing, if yes, is it damaged
-