Information

  • Job no

  • Address

  • Client

  • Conducted on

  • Inspected by

  • CSC to confirm if religious ceremony is required by client

Site identification

  • Will site require further information on orders for location of property. Eg, new estate, not in GPS etc

  • Is site located in a private estate that requires a security code for access

  • Are boundary identification pegs evident

  • Will site require identifiction survey prior site start

  • Do any retaining walls or boundary fences need to be removed prior or during construction

  • Will retaining walls be required prior earthworks or after earthworks and prior slab or both

  • Are any services, eg power, Telstra, sewer, stormwater be required to be installed prior retaining walls being constructed

  • If acreage job, is earthworks platform position clearly defined<br>

Site condition

  • Will site require slashing / mowing prior site start

  • Will trees require removal prior site start

  • Are any trees overhanging neighbouring properties

  • Is site clean of all debris

  • Is kerb damaged.

  • If footpath on property, is there any cracks / breakages

  • Is there a possibility of construction traffic damaging footpath

  • Are there stormwater kerb adapters in place

Location of electrical and communication services

  • Is underground power available

  • Is underground power pillar damaged

  • Is overhead power available

  • If acreage, approx what distance is it from road pole to within 6 mts of building platform.

  • If acreage, is client responsible to install power to within 6 mts of building platform

  • Will overhead powerlines be with 3mts moving plant

  • Will overhead powerlines be within 4 mts of scaffold

  • Is overhead mains power to go to builders overhead temporary pole.

  • Is a property pole required due to position of street overhead power poles

  • If answers above is yes. Is property pole position suitable as shown on site plan

  • Is overhead mains power to go to builders overhead temporary pole.

  • Will site require *Overhead Hi Visibility Flag Structure* to construction access gates.

  • Is Telstra pit visible

  • Is Telstra lid or pit damaged

  • Is there a separate communication pit. Eg, normally in gated estates.

  • Is communication pit or lid damaged

Location of water, stormwater and sewer services vacant lot

  • Is water meter installed

  • Is water meter box damaged

  • Are stormwater kerb adapters installed

  • Is kerb type barrier

  • Is kerb type rollover

  • Can stormwater achieve fall to street or council service connection point

  • Is council sewer manhole installed

  • Is council sewer manhole cover damaged

If acreage, supply of water, rainwater tank and treatment plant services

  • If acreage, is town water available

  • If above answer no. Is client responsible for temporary water for construction purposes

  • Is Clarendon to supply and install rainwater tank and treatment plant

  • Is Client to supply and install rainwater tank and treatment plant

Access and storage of material to site

  • Will traffic control be required due to being within 100 mts of the following<br><br>Traffic lights, school, hospital, bus stop, nursing home, blind corner, main rd

  • Is the property on a RTA road

  • Will deliveries stop or disrupt traffic

  • Will deliveries stop or disrupt pedestrians on footpath

  • Is adequate parking adequate for trades

  • Is there clearway lanes, no stopping lanes, no parking signage, no standing to construction access gates

  • Is additional protection of neighbouring properties from falling objects or mortar / render splashes be required, eg shade cloth, kickboards.

  • Is there enough room for storage of materials

  • Will any building materials have to be delivered prior slab pour

  • Will there be additional excess soil removal on this site from earthworks, drainage or slab preparation.

  • Will extra *all weather access material* be required, eg red soil, small allotment, steep access etc

Knockdown / rebuild jobs

  • Has original home been demolished

  • If yes, is there any debris remaining on site

  • Will additional import fill be required

  • Is the sewer connection capped off above ground level

  • Is the water meter still in place

  • Is the stormwater connections capped off above ground level

  • Is there underground gas line, if yes, is it terminated and what side of street is main on

  • Is there overhead power, if so, what side of the road is the mains line

  • Has a identification survey been completed

  • Is crossover existing, if yes, is it damaged

  • Is footpath existing, if yes, is it damaged

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.