Title Page
-
Building application no.
-
Property Address
-
Type of structure
-
Inspection Date
-
TAKE PHOTOS
-
Termite Protection - check for sticker in meter box/under sink
-
Check site drainage of land, directs water away from building foundations. Perimeter drainage in place.
-
Roofwater disposal to street, pits, yard bubblers @3m. Check gutters and downspipes for faulty joints.
-
Correct fixing of roof coverings by roof screws
-
Birdproof sealing of eaves soffits
-
Vermin sealing of all penetrations in walls and floors
-
Check protection of exposed timber members
-
Hot water overflow directed into overflow relief gully (ORG)
-
Compliance with Development Consent eg parking, landscape, signage, etc
-
Compliance with all conditions of approval
-
Doors and locks fitted correctly
-
Mouldings punched sanded and painted
-
Fittings completed correctly
-
Plaster work, comices tradesmanlike
-
Bricks laid level and plumb with perps and joints equal, dampcourse correct postion, weep holes below all floor levels and under windows, weep holes clean and uncovered, brick surfaces cleaned
-
Check weepholes that they are correctly spaced, positioned, clean and not covered
-
Check flashings
-
Check building is vermin and insect proof (eg sealed pipe penetrations under sinks and vanity basins, or cracks beside juncture of cupboards and walls etc)
-
Tiles graded and drained fall to floor wastes, laid level and plumb, even, cut edges sanded, grouting quality, abutting joints caulked. Finishes to wet areas.
-
Ensure building is built in accordance with approved plans
-
Check light and ventilation (mechanical ventilation) to all rooms
-
Kitchen/Bathroom/Bedroom joinery installed square, unmarked, sealed against walls, doors adjusted, visible screws in lin and evenly spaced, handles fitted correctly, clean
-
All trenches adequately backfilled to resist sinking
-
Clean windows, frames, tracks, cupboards, bathroom, laundry, kitchen, WC, walls, doors and sills, fixtures checked and stickers removed.
-
Clean site free of rubbish, bricks and disused materials
-
Check if there are any requisitions outstanding from previous inspections
-
All energy efficiency provisions complied with
-
Have you issued a site instructions
-
List any notes/ directions that have been given/noted
-
Don't forget photos
-
Sign please