Information

  • Job Number:

  • Address:

  • Installers Name

  • QA Completed By

  • Conducted on

  • THIS QA CHECKLIST IS TO BE COMPLETED IN CONJUNCTION WITH THE INSTALLAUS INSTALLATION GUIDELINES

Qa Rooms

  • Enter Room

ADS Maintenance

  • Has this house been handed over?

  • Client Address
  • Client Name

  • Client Number

  • What type of Maintenance

  • Add PO#

  • Enter the part/s required along with size/s

  • Department at Fault

  • Please select BNC code from attached table

  • Why allocated to that department (in short)

  • Attention Installation Scheduler

  • Install time required (excluding travel)

  • Is installer required to complete any notes?

  • Notes for installer to complete

  • Take photo of elevation or new part required

  • Enter Room

ADS Maintenance

  • What type of Maintenance

  • Add PO#

  • Enter the part/s required along with size/s

  • Department at Fault

  • Why allocated to that department (in short)

  • Attention Installation Scheduler

  • Install time required (excluding travel)

  • Is installer required to complete any notes?

  • Notes for installer to complete

  • Take photo of elevation or new part required

  • Enter Room

ADS Maintenance

  • What type of Maintenance

  • Add PO#

  • Enter the part/s required along with size/s

  • Department at Fault

  • Why allocated to that department (in short)

  • Attention Installation Scheduler

  • Install time required (excluding travel)

  • Is installer required to complete any notes?

  • Notes for installer to complete

  • Take photo of elevation or new part required

  • Enter Room

ADS Maintenance

  • What type of Maintenance

  • Add PO#

  • Enter the part/s required along with size/s

  • Department at Fault

  • Why allocated to that department (in short)

  • Attention Installation Scheduler

  • Install time required (excluding travel)

  • Is installer required to complete any notes?

  • Notes for installer to complete

  • Take photo of elevation or new part required

  • Enter Room

ADS Maintenance

  • What type of Maintenance

  • Add PO#

  • Enter the part/s required along with size/s

  • Department at Fault

  • Why allocated to that department (in short)

  • Attention Installation Scheduler

  • Install time required (excluding travel)

  • Is installer required to complete any notes?

  • Notes for installer to complete

  • Take photo of elevation or new part required

Completed

  • Total travel time for any maintenance's if applicable

  • Please provide any other information that would be useful.

  • Please sign before submitting this form

  • Thankyou

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.