Information
-
Site conducted
-
Job Number:
-
Address:
-
Installers Name
-
QA Completed By
-
Conducted on
-
THIS QA CHECKLIST IS TO BE COMPLETED IN CONJUNCTION WITH THE INSTALLAUS INSTALLATION GUIDELINES
Qa Rooms
-
Enter room name
- Kitchen
- Butlers
- Bathroom/Powder
- Ensuite
- Laundry
- Media units
- Desks and Study
- Wardrobes
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Is island square and in the correct position as per plans. Photos of tape
-
Is island fixed to floor with liquid nails or silicone
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are end panels set in 1mm from barback, and secured to barback below kicker height?
-
Are oven cleats and fillers set back correct amount and fillers secured correctly.
-
Are stickers marks and glue residue cleaned off all door and panels?
-
Does Island section have waterfall ends?
-
Are bar panels to plan and finishing flush with carcass ends
-
Does the Job have integrated DW and kicker
-
Has it been stored correctly, take photos
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Does job have 18mm substraights for 40mm stone?
-
Are 18mm MDF substraights set back 20-25mm from oven openings and island ends?
-
Are all benchtops no more gaped to walls?
-
Is job ready for stone install (stone measure between panels is correct?, Square at corners, Fillers correct sizes? Stone goes under window or butts up at correct height? All cabinets installed?)
-
Have you informed Mabut or scheduling to put stone on hold
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Appliance's
-
Is Range hood cabinet or void as per job specifications
-
Is Rangehood a slide out? if yes, is rail at back 300mm from front of rangehood doors? Add Photo
-
Oven space or void as per job specifications, with oven rails set correctly
-
Confirm you have checked the specifications of any special appliances
Hardware
-
Handles as per job specifications and guidelines?
-
Do pot draws have screws at front of draw runners to prevent dropping?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are oven cleats and fillers set back correct amount and fillers secured correctly.
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Does job have 18mm substraights for 40mm stone?
-
Are 18mm MDF substraights set back 20-25mm from oven openings and island ends?
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Appliance's
-
Is Range hood cabinet or void as per job specifications
-
Is Rangehood a slide out? if yes, is rail at back 300mm from front of rangehood doors? Add Photo
-
Confirm you have checked the specifications of any special appliances
Hardware
-
Handles as per job specifications and guidelines?
-
Do pot draws have screws at front of draw runners to prevent dropping?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are access cutouts needed and if so are they in correct positions? If yes, Add photo to show
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
-
Carcass'
-
Are All cabinets secured properly?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
Doors and Panels
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are access holes required? if so are they in correct positions? add photos
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
-
Is Washing machine space as per specs. Add Photos
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all panels level and plumb? Add Photos.
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Are hanging rails level and at correct heights
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
-
Enter room name
- Kitchen
- Butlers
- Bathroom/Powder
- Ensuite
- Laundry
- Media units
- Desks and Study
- Wardrobes
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Is island square and in the correct position as per plans. Photos of tape
-
Is island fixed to floor with liquid nails or silicone
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are end panels set in 1mm from barback, and secured to barback below kicker height?
-
Are oven cleats and fillers set back correct amount and fillers secured correctly.
-
Are stickers marks and glue residue cleaned off all door and panels?
-
Does Island section have waterfall ends?
-
Are bar panels to plan and finishing flush with carcass ends
-
Does the Job have integrated DW and kicker
-
Has it been stored correctly, take photos
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Does job have 18mm substraights for 40mm stone?
-
Are 18mm MDF substraights set back 20-25mm from oven openings and island ends?
-
Are all benchtops no more gaped to walls?
-
Is job ready for stone install (stone measure between panels is correct?, Square at corners, Fillers correct sizes? Stone goes under window or butts up at correct height? All cabinets installed?)
-
Have you informed Mabut or scheduling to put stone on hold
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Appliance's
-
Is Range hood cabinet or void as per job specifications
-
Is Rangehood a slide out? if yes, is rail at back 300mm from front of rangehood doors? Add Photo
-
Oven space or void as per job specifications, with oven rails set correctly
-
Confirm you have checked the specifications of any special appliances
Hardware
-
Handles as per job specifications and guidelines?
-
Do pot draws have screws at front of draw runners to prevent dropping?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are oven cleats and fillers set back correct amount and fillers secured correctly.
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Does job have 18mm substraights for 40mm stone?
-
Are 18mm MDF substraights set back 20-25mm from oven openings and island ends?
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Appliance's
-
Is Range hood cabinet or void as per job specifications
-
Is Rangehood a slide out? if yes, is rail at back 300mm from front of rangehood doors? Add Photo
-
Confirm you have checked the specifications of any special appliances
Hardware
-
Handles as per job specifications and guidelines?
-
Do pot draws have screws at front of draw runners to prevent dropping?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are access cutouts needed and if so are they in correct positions? If yes, Add photo to show
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
-
Carcass'
-
Are All cabinets secured properly?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
Doors and Panels
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are access holes required? if so are they in correct positions? add photos
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
-
Is Washing machine space as per specs. Add Photos
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all panels level and plumb? Add Photos.
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Are hanging rails level and at correct heights
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
-
Enter room name
- Kitchen
- Butlers
- Bathroom/Powder
- Ensuite
- Laundry
- Media units
- Desks and Study
- Wardrobes
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Is island square and in the correct position as per plans. Photos of tape
-
Is island fixed to floor with liquid nails or silicone
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are end panels set in 1mm from barback, and secured to barback below kicker height?
-
Are oven cleats and fillers set back correct amount and fillers secured correctly.
-
Are stickers marks and glue residue cleaned off all door and panels?
-
Does Island section have waterfall ends?
-
Are bar panels to plan and finishing flush with carcass ends
-
Does the Job have integrated DW and kicker
-
Has it been stored correctly, take photos
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Does job have 18mm substraights for 40mm stone?
-
Are 18mm MDF substraights set back 20-25mm from oven openings and island ends?
-
Are all benchtops no more gaped to walls?
-
Is job ready for stone install (stone measure between panels is correct?, Square at corners, Fillers correct sizes? Stone goes under window or butts up at correct height? All cabinets installed?)
-
Have you informed Mabut or scheduling to put stone on hold
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Appliance's
-
Is Range hood cabinet or void as per job specifications
-
Is Rangehood a slide out? if yes, is rail at back 300mm from front of rangehood doors? Add Photo
-
Oven space or void as per job specifications, with oven rails set correctly
-
Confirm you have checked the specifications of any special appliances
Hardware
-
Handles as per job specifications and guidelines?
-
Do pot draws have screws at front of draw runners to prevent dropping?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are oven cleats and fillers set back correct amount and fillers secured correctly.
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Does job have 18mm substraights for 40mm stone?
-
Are 18mm MDF substraights set back 20-25mm from oven openings and island ends?
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Appliance's
-
Is Range hood cabinet or void as per job specifications
-
Is Rangehood a slide out? if yes, is rail at back 300mm from front of rangehood doors? Add Photo
-
Confirm you have checked the specifications of any special appliances
Hardware
-
Handles as per job specifications and guidelines?
-
Do pot draws have screws at front of draw runners to prevent dropping?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are access cutouts needed and if so are they in correct positions? If yes, Add photo to show
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
-
Carcass'
-
Are All cabinets secured properly?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
Doors and Panels
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are access holes required? if so are they in correct positions? add photos
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
-
Is Washing machine space as per specs. Add Photos
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all panels level and plumb? Add Photos.
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Are hanging rails level and at correct heights
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
-
Enter room name
- Kitchen
- Butlers
- Bathroom/Powder
- Ensuite
- Laundry
- Media units
- Desks and Study
- Wardrobes
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Is island square and in the correct position as per plans. Photos of tape
-
Is island fixed to floor with liquid nails or silicone
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are end panels set in 1mm from barback, and secured to barback below kicker height?
-
Are oven cleats and fillers set back correct amount and fillers secured correctly.
-
Are stickers marks and glue residue cleaned off all door and panels?
-
Does Island section have waterfall ends?
-
Are bar panels to plan and finishing flush with carcass ends
-
Does the Job have integrated DW and kicker
-
Has it been stored correctly, take photos
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Does job have 18mm substraights for 40mm stone?
-
Are 18mm MDF substraights set back 20-25mm from oven openings and island ends?
-
Are all benchtops no more gaped to walls?
-
Is job ready for stone install (stone measure between panels is correct?, Square at corners, Fillers correct sizes? Stone goes under window or butts up at correct height? All cabinets installed?)
-
Have you informed Mabut or scheduling to put stone on hold
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Appliance's
-
Is Range hood cabinet or void as per job specifications
-
Is Rangehood a slide out? if yes, is rail at back 300mm from front of rangehood doors? Add Photo
-
Oven space or void as per job specifications, with oven rails set correctly
-
Confirm you have checked the specifications of any special appliances
Hardware
-
Handles as per job specifications and guidelines?
-
Do pot draws have screws at front of draw runners to prevent dropping?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are oven cleats and fillers set back correct amount and fillers secured correctly.
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Does job have 18mm substraights for 40mm stone?
-
Are 18mm MDF substraights set back 20-25mm from oven openings and island ends?
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Appliance's
-
Is Range hood cabinet or void as per job specifications
-
Is Rangehood a slide out? if yes, is rail at back 300mm from front of rangehood doors? Add Photo
-
Confirm you have checked the specifications of any special appliances
Hardware
-
Handles as per job specifications and guidelines?
-
Do pot draws have screws at front of draw runners to prevent dropping?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are access cutouts needed and if so are they in correct positions? If yes, Add photo to show
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
-
Carcass'
-
Are All cabinets secured properly?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
Doors and Panels
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are access holes required? if so are they in correct positions? add photos
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
-
Is Washing machine space as per specs. Add Photos
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all panels level and plumb? Add Photos.
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Are hanging rails level and at correct heights
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
-
Enter room name
- Kitchen
- Butlers
- Bathroom/Powder
- Ensuite
- Laundry
- Media units
- Desks and Study
- Wardrobes
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Is island square and in the correct position as per plans. Photos of tape
-
Is island fixed to floor with liquid nails or silicone
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are end panels set in 1mm from barback, and secured to barback below kicker height?
-
Are oven cleats and fillers set back correct amount and fillers secured correctly.
-
Are stickers marks and glue residue cleaned off all door and panels?
-
Does Island section have waterfall ends?
-
Are bar panels to plan and finishing flush with carcass ends
-
Does the Job have integrated DW and kicker
-
Has it been stored correctly, take photos
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Does job have 18mm substraights for 40mm stone?
-
Are 18mm MDF substraights set back 20-25mm from oven openings and island ends?
-
Are all benchtops no more gaped to walls?
-
Is job ready for stone install (stone measure between panels is correct?, Square at corners, Fillers correct sizes? Stone goes under window or butts up at correct height? All cabinets installed?)
-
Have you informed Mabut or scheduling to put stone on hold
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Appliance's
-
Is Range hood cabinet or void as per job specifications
-
Is Rangehood a slide out? if yes, is rail at back 300mm from front of rangehood doors? Add Photo
-
Oven space or void as per job specifications, with oven rails set correctly
-
Confirm you have checked the specifications of any special appliances
Hardware
-
Handles as per job specifications and guidelines?
-
Do pot draws have screws at front of draw runners to prevent dropping?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are oven cleats and fillers set back correct amount and fillers secured correctly.
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Does job have 18mm substraights for 40mm stone?
-
Are 18mm MDF substraights set back 20-25mm from oven openings and island ends?
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Appliance's
-
Is Range hood cabinet or void as per job specifications
-
Is Rangehood a slide out? if yes, is rail at back 300mm from front of rangehood doors? Add Photo
-
Confirm you have checked the specifications of any special appliances
Hardware
-
Handles as per job specifications and guidelines?
-
Do pot draws have screws at front of draw runners to prevent dropping?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are access cutouts needed and if so are they in correct positions? If yes, Add photo to show
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
-
Carcass'
-
Are All cabinets secured properly?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
Doors and Panels
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are access holes required? if so are they in correct positions? add photos
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
-
Is Washing machine space as per specs. Add Photos
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all panels level and plumb? Add Photos.
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Are hanging rails level and at correct heights
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
-
Enter room name
- Kitchen
- Butlers
- Bathroom/Powder
- Ensuite
- Laundry
- Media units
- Desks and Study
- Wardrobes
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Is island square and in the correct position as per plans. Photos of tape
-
Is island fixed to floor with liquid nails or silicone
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are end panels set in 1mm from barback, and secured to barback below kicker height?
-
Are oven cleats and fillers set back correct amount and fillers secured correctly.
-
Are stickers marks and glue residue cleaned off all door and panels?
-
Does Island section have waterfall ends?
-
Are bar panels to plan and finishing flush with carcass ends
-
Does the Job have integrated DW and kicker
-
Has it been stored correctly, take photos
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Does job have 18mm substraights for 40mm stone?
-
Are 18mm MDF substraights set back 20-25mm from oven openings and island ends?
-
Are all benchtops no more gaped to walls?
-
Is job ready for stone install (stone measure between panels is correct?, Square at corners, Fillers correct sizes? Stone goes under window or butts up at correct height? All cabinets installed?)
-
Have you informed Mabut or scheduling to put stone on hold
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Appliance's
-
Is Range hood cabinet or void as per job specifications
-
Is Rangehood a slide out? if yes, is rail at back 300mm from front of rangehood doors? Add Photo
-
Oven space or void as per job specifications, with oven rails set correctly
-
Confirm you have checked the specifications of any special appliances
Hardware
-
Handles as per job specifications and guidelines?
-
Do pot draws have screws at front of draw runners to prevent dropping?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are oven cleats and fillers set back correct amount and fillers secured correctly.
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Does job have 18mm substraights for 40mm stone?
-
Are 18mm MDF substraights set back 20-25mm from oven openings and island ends?
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Appliance's
-
Is Range hood cabinet or void as per job specifications
-
Is Rangehood a slide out? if yes, is rail at back 300mm from front of rangehood doors? Add Photo
-
Confirm you have checked the specifications of any special appliances
Hardware
-
Handles as per job specifications and guidelines?
-
Do pot draws have screws at front of draw runners to prevent dropping?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are access cutouts needed and if so are they in correct positions? If yes, Add photo to show
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
-
Carcass'
-
Are All cabinets secured properly?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
Doors and Panels
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are access holes required? if so are they in correct positions? add photos
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
-
Is Washing machine space as per specs. Add Photos
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all panels level and plumb? Add Photos.
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Are hanging rails level and at correct heights
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
-
Enter room name
- Kitchen
- Butlers
- Bathroom/Powder
- Ensuite
- Laundry
- Media units
- Desks and Study
- Wardrobes
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Is island square and in the correct position as per plans. Photos of tape
-
Is island fixed to floor with liquid nails or silicone
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are end panels set in 1mm from barback, and secured to barback below kicker height?
-
Are oven cleats and fillers set back correct amount and fillers secured correctly.
-
Are stickers marks and glue residue cleaned off all door and panels?
-
Does Island section have waterfall ends?
-
Are bar panels to plan and finishing flush with carcass ends
-
Does the Job have integrated DW and kicker
-
Has it been stored correctly, take photos
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Does job have 18mm substraights for 40mm stone?
-
Are 18mm MDF substraights set back 20-25mm from oven openings and island ends?
-
Are all benchtops no more gaped to walls?
-
Is job ready for stone install (stone measure between panels is correct?, Square at corners, Fillers correct sizes? Stone goes under window or butts up at correct height? All cabinets installed?)
-
Have you informed Mabut or scheduling to put stone on hold
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Appliance's
-
Is Range hood cabinet or void as per job specifications
-
Is Rangehood a slide out? if yes, is rail at back 300mm from front of rangehood doors? Add Photo
-
Oven space or void as per job specifications, with oven rails set correctly
-
Confirm you have checked the specifications of any special appliances
Hardware
-
Handles as per job specifications and guidelines?
-
Do pot draws have screws at front of draw runners to prevent dropping?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are oven cleats and fillers set back correct amount and fillers secured correctly.
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Does job have 18mm substraights for 40mm stone?
-
Are 18mm MDF substraights set back 20-25mm from oven openings and island ends?
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Appliance's
-
Is Range hood cabinet or void as per job specifications
-
Is Rangehood a slide out? if yes, is rail at back 300mm from front of rangehood doors? Add Photo
-
Confirm you have checked the specifications of any special appliances
Hardware
-
Handles as per job specifications and guidelines?
-
Do pot draws have screws at front of draw runners to prevent dropping?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are access cutouts needed and if so are they in correct positions? If yes, Add photo to show
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
-
Carcass'
-
Are All cabinets secured properly?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
Doors and Panels
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are access holes required? if so are they in correct positions? add photos
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
-
Is Washing machine space as per specs. Add Photos
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all panels level and plumb? Add Photos.
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Are hanging rails level and at correct heights
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
-
Enter room name
- Kitchen
- Butlers
- Bathroom/Powder
- Ensuite
- Laundry
- Media units
- Desks and Study
- Wardrobes
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Is island square and in the correct position as per plans. Photos of tape
-
Is island fixed to floor with liquid nails or silicone
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are end panels set in 1mm from barback, and secured to barback below kicker height?
-
Are oven cleats and fillers set back correct amount and fillers secured correctly.
-
Are stickers marks and glue residue cleaned off all door and panels?
-
Does Island section have waterfall ends?
-
Are bar panels to plan and finishing flush with carcass ends
-
Does the Job have integrated DW and kicker
-
Has it been stored correctly, take photos
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Does job have 18mm substraights for 40mm stone?
-
Are 18mm MDF substraights set back 20-25mm from oven openings and island ends?
-
Are all benchtops no more gaped to walls?
-
Is job ready for stone install (stone measure between panels is correct?, Square at corners, Fillers correct sizes? Stone goes under window or butts up at correct height? All cabinets installed?)
-
Have you informed Mabut or scheduling to put stone on hold
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Appliance's
-
Is Range hood cabinet or void as per job specifications
-
Is Rangehood a slide out? if yes, is rail at back 300mm from front of rangehood doors? Add Photo
-
Oven space or void as per job specifications, with oven rails set correctly
-
Confirm you have checked the specifications of any special appliances
Hardware
-
Handles as per job specifications and guidelines?
-
Do pot draws have screws at front of draw runners to prevent dropping?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are oven cleats and fillers set back correct amount and fillers secured correctly.
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Does job have 18mm substraights for 40mm stone?
-
Are 18mm MDF substraights set back 20-25mm from oven openings and island ends?
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Appliance's
-
Is Range hood cabinet or void as per job specifications
-
Is Rangehood a slide out? if yes, is rail at back 300mm from front of rangehood doors? Add Photo
-
Confirm you have checked the specifications of any special appliances
Hardware
-
Handles as per job specifications and guidelines?
-
Do pot draws have screws at front of draw runners to prevent dropping?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are access cutouts needed and if so are they in correct positions? If yes, Add photo to show
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
-
Carcass'
-
Are All cabinets secured properly?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
Doors and Panels
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are access holes required? if so are they in correct positions? add photos
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
-
Is Washing machine space as per specs. Add Photos
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all panels level and plumb? Add Photos.
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Are hanging rails level and at correct heights
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
-
Enter room name
- Kitchen
- Butlers
- Bathroom/Powder
- Ensuite
- Laundry
- Media units
- Desks and Study
- Wardrobes
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Is island square and in the correct position as per plans. Photos of tape
-
Is island fixed to floor with liquid nails or silicone
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are end panels set in 1mm from barback, and secured to barback below kicker height?
-
Are oven cleats and fillers set back correct amount and fillers secured correctly.
-
Are stickers marks and glue residue cleaned off all door and panels?
-
Does Island section have waterfall ends?
-
Are bar panels to plan and finishing flush with carcass ends
-
Does the Job have integrated DW and kicker
-
Has it been stored correctly, take photos
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Does job have 18mm substraights for 40mm stone?
-
Are 18mm MDF substraights set back 20-25mm from oven openings and island ends?
-
Are all benchtops no more gaped to walls?
-
Is job ready for stone install (stone measure between panels is correct?, Square at corners, Fillers correct sizes? Stone goes under window or butts up at correct height? All cabinets installed?)
-
Have you informed Mabut or scheduling to put stone on hold
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Appliance's
-
Is Range hood cabinet or void as per job specifications
-
Is Rangehood a slide out? if yes, is rail at back 300mm from front of rangehood doors? Add Photo
-
Oven space or void as per job specifications, with oven rails set correctly
-
Confirm you have checked the specifications of any special appliances
Hardware
-
Handles as per job specifications and guidelines?
-
Do pot draws have screws at front of draw runners to prevent dropping?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are oven cleats and fillers set back correct amount and fillers secured correctly.
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Does job have 18mm substraights for 40mm stone?
-
Are 18mm MDF substraights set back 20-25mm from oven openings and island ends?
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Appliance's
-
Is Range hood cabinet or void as per job specifications
-
Is Rangehood a slide out? if yes, is rail at back 300mm from front of rangehood doors? Add Photo
-
Confirm you have checked the specifications of any special appliances
Hardware
-
Handles as per job specifications and guidelines?
-
Do pot draws have screws at front of draw runners to prevent dropping?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are access cutouts needed and if so are they in correct positions? If yes, Add photo to show
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
-
Carcass'
-
Are All cabinets secured properly?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
Doors and Panels
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are access holes required? if so are they in correct positions? add photos
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
-
Is Washing machine space as per specs. Add Photos
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all panels level and plumb? Add Photos.
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Are hanging rails level and at correct heights
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
-
Enter room name
- Kitchen
- Butlers
- Bathroom/Powder
- Ensuite
- Laundry
- Media units
- Desks and Study
- Wardrobes
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Is island square and in the correct position as per plans. Photos of tape
-
Is island fixed to floor with liquid nails or silicone
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are end panels set in 1mm from barback, and secured to barback below kicker height?
-
Are oven cleats and fillers set back correct amount and fillers secured correctly.
-
Are stickers marks and glue residue cleaned off all door and panels?
-
Does Island section have waterfall ends?
-
Are bar panels to plan and finishing flush with carcass ends
-
Does the Job have integrated DW and kicker
-
Has it been stored correctly, take photos
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Does job have 18mm substraights for 40mm stone?
-
Are 18mm MDF substraights set back 20-25mm from oven openings and island ends?
-
Are all benchtops no more gaped to walls?
-
Is job ready for stone install (stone measure between panels is correct?, Square at corners, Fillers correct sizes? Stone goes under window or butts up at correct height? All cabinets installed?)
-
Have you informed Mabut or scheduling to put stone on hold
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Appliance's
-
Is Range hood cabinet or void as per job specifications
-
Is Rangehood a slide out? if yes, is rail at back 300mm from front of rangehood doors? Add Photo
-
Oven space or void as per job specifications, with oven rails set correctly
-
Confirm you have checked the specifications of any special appliances
Hardware
-
Handles as per job specifications and guidelines?
-
Do pot draws have screws at front of draw runners to prevent dropping?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are oven cleats and fillers set back correct amount and fillers secured correctly.
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Does job have 18mm substraights for 40mm stone?
-
Are 18mm MDF substraights set back 20-25mm from oven openings and island ends?
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Appliance's
-
Is Range hood cabinet or void as per job specifications
-
Is Rangehood a slide out? if yes, is rail at back 300mm from front of rangehood doors? Add Photo
-
Confirm you have checked the specifications of any special appliances
Hardware
-
Handles as per job specifications and guidelines?
-
Do pot draws have screws at front of draw runners to prevent dropping?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are access cutouts needed and if so are they in correct positions? If yes, Add photo to show
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
-
Carcass'
-
Are All cabinets secured properly?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
Doors and Panels
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are access holes required? if so are they in correct positions? add photos
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
-
Is Washing machine space as per specs. Add Photos
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all panels level and plumb? Add Photos.
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Are hanging rails level and at correct heights
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
-
Enter room name
- Kitchen
- Butlers
- Bathroom/Powder
- Ensuite
- Laundry
- Media units
- Desks and Study
- Wardrobes
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Is island square and in the correct position as per plans. Photos of tape
-
Is island fixed to floor with liquid nails or silicone
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are end panels set in 1mm from barback, and secured to barback below kicker height?
-
Are oven cleats and fillers set back correct amount and fillers secured correctly.
-
Are stickers marks and glue residue cleaned off all door and panels?
-
Does Island section have waterfall ends?
-
Are bar panels to plan and finishing flush with carcass ends
-
Does the Job have integrated DW and kicker
-
Has it been stored correctly, take photos
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Does job have 18mm substraights for 40mm stone?
-
Are 18mm MDF substraights set back 20-25mm from oven openings and island ends?
-
Are all benchtops no more gaped to walls?
-
Is job ready for stone install (stone measure between panels is correct?, Square at corners, Fillers correct sizes? Stone goes under window or butts up at correct height? All cabinets installed?)
-
Have you informed Mabut or scheduling to put stone on hold
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Appliance's
-
Is Range hood cabinet or void as per job specifications
-
Is Rangehood a slide out? if yes, is rail at back 300mm from front of rangehood doors? Add Photo
-
Oven space or void as per job specifications, with oven rails set correctly
-
Confirm you have checked the specifications of any special appliances
Hardware
-
Handles as per job specifications and guidelines?
-
Do pot draws have screws at front of draw runners to prevent dropping?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are oven cleats and fillers set back correct amount and fillers secured correctly.
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Does job have 18mm substraights for 40mm stone?
-
Are 18mm MDF substraights set back 20-25mm from oven openings and island ends?
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Appliance's
-
Is Range hood cabinet or void as per job specifications
-
Is Rangehood a slide out? if yes, is rail at back 300mm from front of rangehood doors? Add Photo
-
Confirm you have checked the specifications of any special appliances
Hardware
-
Handles as per job specifications and guidelines?
-
Do pot draws have screws at front of draw runners to prevent dropping?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are access cutouts needed and if so are they in correct positions? If yes, Add photo to show
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
-
Carcass'
-
Are All cabinets secured properly?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
Doors and Panels
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are access holes required? if so are they in correct positions? add photos
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
-
Is Washing machine space as per specs. Add Photos
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all panels level and plumb? Add Photos.
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Are hanging rails level and at correct heights
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
-
Enter room name
- Kitchen
- Butlers
- Bathroom/Powder
- Ensuite
- Laundry
- Media units
- Desks and Study
- Wardrobes
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Is island square and in the correct position as per plans. Photos of tape
-
Is island fixed to floor with liquid nails or silicone
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are end panels set in 1mm from barback, and secured to barback below kicker height?
-
Are oven cleats and fillers set back correct amount and fillers secured correctly.
-
Are stickers marks and glue residue cleaned off all door and panels?
-
Does Island section have waterfall ends?
-
Are bar panels to plan and finishing flush with carcass ends
-
Does the Job have integrated DW and kicker
-
Has it been stored correctly, take photos
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Does job have 18mm substraights for 40mm stone?
-
Are 18mm MDF substraights set back 20-25mm from oven openings and island ends?
-
Are all benchtops no more gaped to walls?
-
Is job ready for stone install (stone measure between panels is correct?, Square at corners, Fillers correct sizes? Stone goes under window or butts up at correct height? All cabinets installed?)
-
Have you informed Mabut or scheduling to put stone on hold
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Appliance's
-
Is Range hood cabinet or void as per job specifications
-
Is Rangehood a slide out? if yes, is rail at back 300mm from front of rangehood doors? Add Photo
-
Oven space or void as per job specifications, with oven rails set correctly
-
Confirm you have checked the specifications of any special appliances
Hardware
-
Handles as per job specifications and guidelines?
-
Do pot draws have screws at front of draw runners to prevent dropping?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are oven cleats and fillers set back correct amount and fillers secured correctly.
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Does job have 18mm substraights for 40mm stone?
-
Are 18mm MDF substraights set back 20-25mm from oven openings and island ends?
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Appliance's
-
Is Range hood cabinet or void as per job specifications
-
Is Rangehood a slide out? if yes, is rail at back 300mm from front of rangehood doors? Add Photo
-
Confirm you have checked the specifications of any special appliances
Hardware
-
Handles as per job specifications and guidelines?
-
Do pot draws have screws at front of draw runners to prevent dropping?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are access cutouts needed and if so are they in correct positions? If yes, Add photo to show
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
-
Carcass'
-
Are All cabinets secured properly?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
Doors and Panels
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are access holes required? if so are they in correct positions? add photos
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
-
Is Washing machine space as per specs. Add Photos
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all panels level and plumb? Add Photos.
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Are hanging rails level and at correct heights
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
-
Enter room name
- Kitchen
- Butlers
- Bathroom/Powder
- Ensuite
- Laundry
- Media units
- Desks and Study
- Wardrobes
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Is island square and in the correct position as per plans. Photos of tape
-
Is island fixed to floor with liquid nails or silicone
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are end panels set in 1mm from barback, and secured to barback below kicker height?
-
Are oven cleats and fillers set back correct amount and fillers secured correctly.
-
Are stickers marks and glue residue cleaned off all door and panels?
-
Does Island section have waterfall ends?
-
Are bar panels to plan and finishing flush with carcass ends
-
Does the Job have integrated DW and kicker
-
Has it been stored correctly, take photos
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Does job have 18mm substraights for 40mm stone?
-
Are 18mm MDF substraights set back 20-25mm from oven openings and island ends?
-
Are all benchtops no more gaped to walls?
-
Is job ready for stone install (stone measure between panels is correct?, Square at corners, Fillers correct sizes? Stone goes under window or butts up at correct height? All cabinets installed?)
-
Have you informed Mabut or scheduling to put stone on hold
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Appliance's
-
Is Range hood cabinet or void as per job specifications
-
Is Rangehood a slide out? if yes, is rail at back 300mm from front of rangehood doors? Add Photo
-
Oven space or void as per job specifications, with oven rails set correctly
-
Confirm you have checked the specifications of any special appliances
Hardware
-
Handles as per job specifications and guidelines?
-
Do pot draws have screws at front of draw runners to prevent dropping?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are oven cleats and fillers set back correct amount and fillers secured correctly.
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Does job have 18mm substraights for 40mm stone?
-
Are 18mm MDF substraights set back 20-25mm from oven openings and island ends?
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Appliance's
-
Is Range hood cabinet or void as per job specifications
-
Is Rangehood a slide out? if yes, is rail at back 300mm from front of rangehood doors? Add Photo
-
Confirm you have checked the specifications of any special appliances
Hardware
-
Handles as per job specifications and guidelines?
-
Do pot draws have screws at front of draw runners to prevent dropping?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are access cutouts needed and if so are they in correct positions? If yes, Add photo to show
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
-
Carcass'
-
Are All cabinets secured properly?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
Doors and Panels
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are access holes required? if so are they in correct positions? add photos
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
-
Is Washing machine space as per specs. Add Photos
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all panels level and plumb? Add Photos.
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Are hanging rails level and at correct heights
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
-
Enter room name
- Kitchen
- Butlers
- Bathroom/Powder
- Ensuite
- Laundry
- Media units
- Desks and Study
- Wardrobes
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Is island square and in the correct position as per plans. Photos of tape
-
Is island fixed to floor with liquid nails or silicone
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are end panels set in 1mm from barback, and secured to barback below kicker height?
-
Are oven cleats and fillers set back correct amount and fillers secured correctly.
-
Are stickers marks and glue residue cleaned off all door and panels?
-
Does Island section have waterfall ends?
-
Are bar panels to plan and finishing flush with carcass ends
-
Does the Job have integrated DW and kicker
-
Has it been stored correctly, take photos
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Does job have 18mm substraights for 40mm stone?
-
Are 18mm MDF substraights set back 20-25mm from oven openings and island ends?
-
Are all benchtops no more gaped to walls?
-
Is job ready for stone install (stone measure between panels is correct?, Square at corners, Fillers correct sizes? Stone goes under window or butts up at correct height? All cabinets installed?)
-
Have you informed Mabut or scheduling to put stone on hold
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Appliance's
-
Is Range hood cabinet or void as per job specifications
-
Is Rangehood a slide out? if yes, is rail at back 300mm from front of rangehood doors? Add Photo
-
Oven space or void as per job specifications, with oven rails set correctly
-
Confirm you have checked the specifications of any special appliances
Hardware
-
Handles as per job specifications and guidelines?
-
Do pot draws have screws at front of draw runners to prevent dropping?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are oven cleats and fillers set back correct amount and fillers secured correctly.
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Does job have 18mm substraights for 40mm stone?
-
Are 18mm MDF substraights set back 20-25mm from oven openings and island ends?
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Appliance's
-
Is Range hood cabinet or void as per job specifications
-
Is Rangehood a slide out? if yes, is rail at back 300mm from front of rangehood doors? Add Photo
-
Confirm you have checked the specifications of any special appliances
Hardware
-
Handles as per job specifications and guidelines?
-
Do pot draws have screws at front of draw runners to prevent dropping?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are access cutouts needed and if so are they in correct positions? If yes, Add photo to show
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
-
Carcass'
-
Are All cabinets secured properly?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
Doors and Panels
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are access holes required? if so are they in correct positions? add photos
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Hardware
-
Handles as per job specifications and guidelines?
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
-
Is Washing machine space as per specs. Add Photos
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed?
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all panels level and plumb? Add Photos.
-
Are all infills and panels no more gaped to walls?
-
Are stickers marks and glue residue cleaned off all door and panels?
Hardware
-
Handles as per job specifications and guidelines?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Are hanging rails level and at correct heights
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
-
Enter room name
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Is island square and in the correct position as per plans. Photos of tape
-
Is island fixed to floor with liquid nails or silicone
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are end panels set in 1mm from barback, and secured to barback below kicker height?
-
Are oven cleats and fillers set back correct amount and fillers secured correctly.
-
Are stickers marks and glue residue cleaned off all door and panels?
-
Does Island section have waterfall ends?
-
Are bar panels to plan and finishing flush with carcass ends
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Does job have 18mm substraights for 40mm stone?
-
Are 18mm MDF substraights set back 20-25mm from oven openings and island ends?
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Appliance's
-
Is Range hood cabinet or void as per job specifications
-
Is Rangehood a slide out? if yes, is rail at back 300mm from front of rangehood doors? Add Photo
-
Oven space or void as per job specifications, with oven rails set correctly
-
Confirm you have checked the specifications of any special appliances
Hardware
-
Handles as per job specifications and guidelines?
-
Do pot draws have screws at front of draw runners to prevent dropping?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
-
Enter room name
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Is island square and in the correct position as per plans. Photos of tape
-
Is island fixed to floor with liquid nails or silicone
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are end panels set in 1mm from barback, and secured to barback below kicker height?
-
Are oven cleats and fillers set back correct amount and fillers secured correctly.
-
Are stickers marks and glue residue cleaned off all door and panels?
-
Does Island section have waterfall ends?
-
Are bar panels to plan and finishing flush with carcass ends
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Does job have 18mm substraights for 40mm stone?
-
Are 18mm MDF substraights set back 20-25mm from oven openings and island ends?
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Appliance's
-
Is Range hood cabinet or void as per job specifications
-
Is Rangehood a slide out? if yes, is rail at back 300mm from front of rangehood doors? Add Photo
-
Oven space or void as per job specifications, with oven rails set correctly
-
Confirm you have checked the specifications of any special appliances
Hardware
-
Handles as per job specifications and guidelines?
-
Do pot draws have screws at front of draw runners to prevent dropping?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
-
Enter room name
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Is island square and in the correct position as per plans. Photos of tape
-
Is island fixed to floor with liquid nails or silicone
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are end panels set in 1mm from barback, and secured to barback below kicker height?
-
Are oven cleats and fillers set back correct amount and fillers secured correctly.
-
Are stickers marks and glue residue cleaned off all door and panels?
-
Does Island section have waterfall ends?
-
Are bar panels to plan and finishing flush with carcass ends
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Does job have 18mm substraights for 40mm stone?
-
Are 18mm MDF substraights set back 20-25mm from oven openings and island ends?
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Appliance's
-
Is Range hood cabinet or void as per job specifications
-
Is Rangehood a slide out? if yes, is rail at back 300mm from front of rangehood doors? Add Photo
-
Oven space or void as per job specifications, with oven rails set correctly
-
Confirm you have checked the specifications of any special appliances
Hardware
-
Handles as per job specifications and guidelines?
-
Do pot draws have screws at front of draw runners to prevent dropping?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
-
Enter room name
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Is island square and in the correct position as per plans. Photos of tape
-
Is island fixed to floor with liquid nails or silicone
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are end panels set in 1mm from barback, and secured to barback below kicker height?
-
Are oven cleats and fillers set back correct amount and fillers secured correctly.
-
Are stickers marks and glue residue cleaned off all door and panels?
-
Does Island section have waterfall ends?
-
Are bar panels to plan and finishing flush with carcass ends
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Does job have 18mm substraights for 40mm stone?
-
Are 18mm MDF substraights set back 20-25mm from oven openings and island ends?
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Appliance's
-
Is Range hood cabinet or void as per job specifications
-
Is Rangehood a slide out? if yes, is rail at back 300mm from front of rangehood doors? Add Photo
-
Oven space or void as per job specifications, with oven rails set correctly
-
Confirm you have checked the specifications of any special appliances
Hardware
-
Handles as per job specifications and guidelines?
-
Do pot draws have screws at front of draw runners to prevent dropping?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
-
Enter room name
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Is island square and in the correct position as per plans. Photos of tape
-
Is island fixed to floor with liquid nails or silicone
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are end panels set in 1mm from barback, and secured to barback below kicker height?
-
Are oven cleats and fillers set back correct amount and fillers secured correctly.
-
Are stickers marks and glue residue cleaned off all door and panels?
-
Does Island section have waterfall ends?
-
Are bar panels to plan and finishing flush with carcass ends
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Does job have 18mm substraights for 40mm stone?
-
Are 18mm MDF substraights set back 20-25mm from oven openings and island ends?
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Appliance's
-
Is Range hood cabinet or void as per job specifications
-
Is Rangehood a slide out? if yes, is rail at back 300mm from front of rangehood doors? Add Photo
-
Oven space or void as per job specifications, with oven rails set correctly
-
Confirm you have checked the specifications of any special appliances
Hardware
-
Handles as per job specifications and guidelines?
-
Do pot draws have screws at front of draw runners to prevent dropping?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
-
Enter room name
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Is island square and in the correct position as per plans. Photos of tape
-
Is island fixed to floor with liquid nails or silicone
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are end panels set in 1mm from barback, and secured to barback below kicker height?
-
Are oven cleats and fillers set back correct amount and fillers secured correctly.
-
Are stickers marks and glue residue cleaned off all door and panels?
-
Does Island section have waterfall ends?
-
Are bar panels to plan and finishing flush with carcass ends
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Does job have 18mm substraights for 40mm stone?
-
Are 18mm MDF substraights set back 20-25mm from oven openings and island ends?
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Appliance's
-
Is Range hood cabinet or void as per job specifications
-
Is Rangehood a slide out? if yes, is rail at back 300mm from front of rangehood doors? Add Photo
-
Oven space or void as per job specifications, with oven rails set correctly
-
Confirm you have checked the specifications of any special appliances
Hardware
-
Handles as per job specifications and guidelines?
-
Do pot draws have screws at front of draw runners to prevent dropping?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
-
Enter room name
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Is island square and in the correct position as per plans. Photos of tape
-
Is island fixed to floor with liquid nails or silicone
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are end panels set in 1mm from barback, and secured to barback below kicker height?
-
Are oven cleats and fillers set back correct amount and fillers secured correctly.
-
Are stickers marks and glue residue cleaned off all door and panels?
-
Does Island section have waterfall ends?
-
Are bar panels to plan and finishing flush with carcass ends
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Does job have 18mm substraights for 40mm stone?
-
Are 18mm MDF substraights set back 20-25mm from oven openings and island ends?
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Appliance's
-
Is Range hood cabinet or void as per job specifications
-
Is Rangehood a slide out? if yes, is rail at back 300mm from front of rangehood doors? Add Photo
-
Oven space or void as per job specifications, with oven rails set correctly
-
Confirm you have checked the specifications of any special appliances
Hardware
-
Handles as per job specifications and guidelines?
-
Do pot draws have screws at front of draw runners to prevent dropping?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
-
Enter room name
Carcass'
-
Are All cabinets secured properly? Base cabinets fixed, overheads secured with glue behind where required, island firmly stuck?
-
Is island square and in the correct position as per plans. Photos of tape
-
Is island fixed to floor with liquid nails or silicone
-
Are the Carcass' free of damage?
-
Are all Carcass' installed in correct locations and LEVEL? Add Photos
-
Is there a void on island, or are carcasses packed off of walls?
-
Are voids, or packing of carcasses done to specification? Add photos of tape measuring void
Doors and Panels
-
Are all kickers and bulkheads square/parallel
-
Are all doors and panels aligned as per guidelines? Add photos of All door margins and draw margins
-
Are doors and panels free of damage?
-
Are all infills and panels no more gaped to walls?
-
Are end panels set in 1mm from barback, and secured to barback below kicker height?
-
Are oven cleats and fillers set back correct amount and fillers secured correctly.
-
Are stickers marks and glue residue cleaned off all door and panels?
-
Does Island section have waterfall ends?
-
Are bar panels to plan and finishing flush with carcass ends
Benchtops
-
Are all bench tops free of damage
-
Add photos of all edges of benchtops
-
Does job have 18mm substraights for 40mm stone?
-
Are 18mm MDF substraights set back 20-25mm from oven openings and island ends?
-
Are all benchtops no more gaped to walls?
-
Are cutouts as per specs for HP, Sinks, Basins or troughs.
-
Are cutouts square and free of chips?
-
Are cutouts in correct positions? If yes, Add photo to show
-
Undermount cutout rebated + Tap hole drilled?
Appliance's
-
Is Range hood cabinet or void as per job specifications
-
Is Rangehood a slide out? if yes, is rail at back 300mm from front of rangehood doors? Add Photo
-
Oven space or void as per job specifications, with oven rails set correctly
-
Confirm you have checked the specifications of any special appliances
Hardware
-
Handles as per job specifications and guidelines?
-
Do pot draws have screws at front of draw runners to prevent dropping?
-
Is additional hardware installed (Bins, Pullout Pantrys, Slide out spice cabinets etc)
-
Is all installed as per spec, and functioning correctly? Add photos
-
Is all hardware in good working order? (draws running freely, soft close closing completley, hinges correct)
-
Does job have soft close hinges?
-
Are all doors soft closing as per spec?
-
Does the room have soft close draws?
-
Are draw side clips attached to all draws? Take photos
-
Add photos of all elevations
ADS Maintenance / Installer Notes / Builders Feedback
-
Is a maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is another maintenance required in this room?
-
Enter the part/s required along with size/s
-
Department at Fault
- Sales
- Design
- Purchasing
- Manufacturing
- Scheduling
- Logistics
- Site
- IT
- Builder
- ADS
-
Why allocated to that department (in short)
-
Install time required (excluding travel)
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Is there any issues for the builder to be aware of?
-
All notes entered here will appear on the builders report
Completed
-
It is important that the information you have provided is complete and correct. Please confirm that all information required has been entered.
-
Is the job Pass or Fail
-
Total travel time for any maintenance's if applicable
- .25
- .5
- .75
- 1hr
- 1.5
- 2hr
- 3hr
- 4hr
- 5hr
- 6hr
- 7hr
- 8hr
-
Please provide any other information that would be useful.
-
Please sign before submitting this form
-
Thankyou