Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

General Evaluation Items

  • Are all vehicles parked with consideration of first move forward policy?

  • Is the parking break set on all vehicles?

  • Are there any leaks from vehicles or equipment?

  • Is there a spill kit available?<br>

  • Are wheel chocks being used?

  • Where safety belts used?

  • Where any of the vehicles speeding?

  • Is plastic laid properly to collect all liquids?

  • Is pipe being cleaned in accordance with customer requirements?

  • Is pipe being inspected in accordance with customer requirements?

  • Are thread protectors being piled neatly in an area designated by the customer?

  • Is the drift snake being controlled in such a manner to reduce unnecessary movement?

  • Are pipe chalks being used appropriately to prevent pipe from rolling?

  • Is pipe being rolled controllably from the end?

  • Are any Noble Casing, Inc employees on the racks?

  • Is the 30' buffer zone around the loader being enforced?

JSA

  • Was a JSA safety meeting held prior to Rig Up?

  • Was a JSA safety meeting held prior to running?

  • Was a JSA safety meeting held prior to rigging down?

  • Are all signature sheets accounted for?

  • Are changes made and documented for job specific conditions?

  • Any adverse challenges (weather, mud, extreme temperature, etc.) identified and communicated in the JSA process?

PPE

  • Are minimum PPE (hard hat, safety glasses, steel toed boots and FRC's) being properly utilized?

  • Is all PPE in a serviceable condition?

Behavioral Based Safety

  • Are there any signs of the following: Rushing, Frustration, Fatigue, Complacency

  • Are there any signs of the following: Mind Not On Task, Eyes Not On Task, Balance/Traction/Grip Issues, Line Of Fire

  • What is the crews overall attitude?

Crew Pusher/Supervisor

  • Crew Pusher/Supervisor inspected the rig and 3rd party equipment for unsafe conditions?

  • Crew Pusher/Supervisor ensured that all equipment is rigged up correctly?

  • Crew Pusher/Supervisor ensured that all personnel are aware of all proper procedures and are utilizing them?

  • Crew Pusher/Supervisor ensured that all personnel worked safely?

Loader

  • Loader has been inspected and any defects were brought to the attention to the company man?

  • Loader was function tested prior to moving tubulars?

  • Is the loader operator wearing a seat belt while operating the loader?

  • Are all personnel aware of proper hand signals?

  • Has the loader operator participated in loader safety training?

Hot Work

  • Will hot work be performed? (Torch)

  • Was a hot work permit obtained from the customer representative?

  • Has a designated fire watch been assigned for both sides of the casing?

Noble Casing, Inc

  • Are there any SSE/SPE employees present? If 'yes' please place number in comments.

  • Are any Noble Casing, Inc employees smoking outside of the designated smoking area?

  • Are any Noble Casing, Inc employees operating 3rd party equipment? If 'yes' please identify in comments.

  • Are any Noble Casing, Inc employees utilizing a cell phone while working?

  • By signing this I hereby certify that I conducted this Casing Field Evaluation and that all information is true and correct

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.