Cleaning Audit
Are all refuse bins being emptied and cleaned?
Flooring - is flooring being cleaned in-line with 2291 I.e (3 days a week perform a 1 stage detergent cleans and 2 days a week perform a 1 stage Biocide clean)?
Surfaces & Doors - are these being cleaned in-line with 2291 I.e (3 days a week perform a 1 stage Biocide clean)
Campaign Clean - 1 day per month perform a VLFC Strip Clean
Are all refuse bins being emptied and cleaned?
Flooring - is flooring being cleaned in-line with 2291 I.e (3 days a week perform a 1 stage detergent cleans and 2 days a week perform a 1 stage Biocide clean)?
Surfaces & Doors - are these being cleaned in-line with 2291 I.e (3 days a week perform a 1 stage Biocide clean)
Campaign Clean - 1 day per month perform a VLFC Strip Clean
Are all refuse bins being emptied and cleaned?
Flooring - is flooring being cleaned in-line with 2291 I.e (3 days a week perform a 1 stage detergent cleans and 2 days a week perform a 1 stage Biocide clean)?
Surfaces & Doors - are these being cleaned in-line with 2291 I.e (3 days a week perform a 1 stage Biocide clean)
Campaign Clean - 1 day per month perform a VLFC Strip Clean
Room Number:
Are all refuse bins being emptied and cleaned?
Flooring - is flooring being cleaned in-line with 2291 I.e (3 days a week perform a 1 stage detergent cleans and 2 days a week perform a 1 stage Biocide clean)?
Surfaces & Doors - are these being cleaned in-line with 2291 I.e (3 days a week perform a 1 stage Biocide clean)
Campaign Clean - 1 day per month perform a VLFC Strip Clean
Room Numbers:
Are all refuse bins being emptied and cleaned?
Flooring - is flooring being cleaned in-line with 2291 I.e (3 days a week perform a 1 stage detergent cleans and 2 days a week perform a 1 stage Biocide clean)?
Surfaces & Doors - are these being cleaned in-line with 2291 I.e (3 days a week perform a 1 stage Biocide clean)
Campaign Clean - 1 day per month perform a VLFC Strip Clean
Room Number:
Are all refuse bins being emptied and cleaned?
Flooring - is flooring being cleaned in-line with 2291 I.e (3 days a week perform a 1 stage detergent cleans and 2 days a week perform a 1 stage Biocide clean)?
Surfaces & Doors - are these being cleaned in-line with 2291 I.e (3 days a week perform a 1 stage Biocide clean)
Campaign Clean - 1 day per month perform a VLFC Strip Clean
Room Numbers:
Are all refuse bins being emptied and cleaned?
Flooring - is flooring being cleaned in-line with 2291 I.e (3 days a week perform a 1 stage detergent cleans and 2 days a week perform a 1 stage Biocide clean)?
Surfaces & Doors - are these being cleaned in-line with 2291 I.e (3 days a week perform a 1 stage Biocide clean)
Campaign Clean - 1 day per month perform a VLFC Strip Clean
Room Number:
Are all refuse bins being emptied and cleaned?
Flooring - is flooring being cleaned in-line with 2291 I.e (3 days a week perform a 1 stage detergent cleans and 2 days a week perform a 1 stage Biocide clean)?
Surfaces & Doors - are these being cleaned in-line with 2291 I.e (3 days a week perform a 1 stage Biocide clean)
Campaign Clean - 1 day per month perform a VLFC Strip Clean
Room Numbers:
Are all refuse bins being emptied and cleaned?
Flooring - is flooring being cleaned in-line with 2291 I.e (3 days a week perform a 1 stage detergent cleans and 2 days a week perform a 1 stage Biocide clean)?
Surfaces & Doors - are these being cleaned in-line with 2291 I.e (3 days a week perform a 1 stage Biocide clean)
Campaign Clean - 1 day per month perform a VLFC Strip Clean
Room Numbers:
Are all refuse bins being emptied and cleaned?
Flooring - is flooring being cleaned in-line with 2291 I.e (3 days a week perform a 1 stage detergent cleans and 2 days a week perform a 1 stage Biocide clean)?
Surfaces & Doors - are these being cleaned in-line with 2291 I.e (3 days a week perform a 1 stage Biocide clean)
Campaign Clean - 1 day per month perform a VLFC Strip Clean
Room Numbers:
Are all refuse bins being emptied and cleaned?
Flooring - is flooring being cleaned in-line with 2291 I.e (3 days a week perform a 1 stage detergent cleans and 2 days a week perform a 1 stage Biocide clean)?
Surfaces & Doors - are these being cleaned in-line with 2291 I.e (3 days a week perform a 1 stage Biocide clean)
Campaign Clean - 1 day per month perform a VLFC Strip Clean
Room Numbers:
Are all refuse bins being emptied and cleaned?
Flooring - is flooring being cleaned in-line with 2291 I.e (3 days a week perform a 1 stage detergent cleans and 2 days a week perform a 1 stage Biocide clean)?
Surfaces & Doors - are these being cleaned in-line with 2291 I.e (3 days a week perform a 1 stage Biocide clean)
Campaign Clean - 1 day per month perform a VLFC Strip Clean
Room Numbers:
Are all refuse bins being emptied and cleaned?
Flooring - is flooring being cleaned in-line with 2291 I.e (3 days a week perform a 1 stage detergent cleans and 2 days a week perform a 1 stage Biocide clean)?
Surfaces & Doors - are these being cleaned in-line with 2291 I.e (3 days a week perform a 1 stage Biocide clean)
Campaign Clean - 1 day per month perform a VLFC Strip Clean
Room Numbers:
Are all refuse bins being emptied and cleaned?
Flooring - is flooring being cleaned in-line with 2291 I.e (3 days a week perform a 1 stage detergent cleans and 2 days a week perform a 1 stage Biocide clean)?
Surfaces & Doors - are these being cleaned in-line with 2291 I.e (3 days a week perform a 1 stage Biocide clean)
Campaign Clean - 1 day per month perform a VLFC Strip Clean
Room Numbers:
Are all refuse bins being emptied and cleaned?
Flooring - is flooring being cleaned in-line with 2291 I.e (3 days a week perform a 1 stage detergent cleans and 2 days a week perform a 1 stage Biocide clean)?
Surfaces & Doors - are these being cleaned in-line with 2291 I.e (3 days a week perform a 1 stage Biocide clean)
Campaign Clean - 1 day per month perform a VLFC Strip Clean
Room Numbers:
Are all refuse bins being emptied and cleaned?
Flooring - is flooring being cleaned in-line with 2291 I.e (2 days a week perform a 1 stage detergent clean and 1 day a week perform a 1 stage Biocide clean)?
Surfaces & Doors - are these being cleaned in-line with 2291 I.e (2 days a week perform a 1 stage clean)
Campaign Clean - 1 day per month perform a VLFC Strip Clean
Room Numbers:
Are all refuse bins being emptied and cleaned?
Flooring - is flooring being cleaned in-line with 2291 I.e (2 days a week perform a 1 stage detergent clean and 1 day a week perform a 1 stage Biocide clean)?
Surfaces & Doors - are these being cleaned in-line with 2291 I.e (2 days a week perform a 1 stage clean)
Campaign Clean - 1 day per month perform a VLFC Strip Clean
Room Numbers:
Are all refuse bins being emptied and cleaned?
Flooring - is flooring being cleaned in-line with 2291 I.e (2 days a week perform a 1 stage detergent clean and 1 day a week perform a 1 stage Biocide clean)?
Surfaces & Doors - are these being cleaned in-line with 2291 I.e (2 days a week perform a 1 stage clean)
Campaign Clean - 1 day per month perform a VLFC Strip Clean
Room Numbers:
Are all refuse bins being emptied and cleaned?
Flooring - is flooring being cleaned in-line with 2291 I.e (2 days a week perform a 1 stage detergent clean and 1 day a week perform a 1 stage Biocide clean)?
Surfaces & Doors - are these being cleaned in-line with 2291 I.e (2 days a week perform a 1 stage clean)
Campaign Clean - 1 day per month perform a VLFC Strip Clean
Room Numbers:
Are all refuse bins being emptied and cleaned?
Flooring - is flooring being cleaned in-line with 2291 I.e (2 days a week perform a 1 stage detergent clean and 1 day a week perform a 1 stage Biocide clean)?
Surfaces & Doors - are these being cleaned in-line with 2291 I.e (2 days a week perform a 1 stage clean)
Campaign Clean - 1 day per month perform a VLFC Strip Clean
Room Numbers:
Are all refuse bins being emptied and cleaned?
Flooring - is flooring being cleaned in-line with 2291 I.e (2 days a week perform a 1 stage detergent clean and 1 day a week perform a 1 stage Biocide clean)?
Surfaces & Doors - are these being cleaned in-line with 2291 I.e (2 days a week perform a 1 stage clean)
Campaign Clean - 1 day per month perform a VLFC Strip Clean
Room Numbers:
Are all refuse bins being emptied and cleaned?
Flooring - is flooring being cleaned in-line with 2291 I.e (2 days a week perform a 1 stage detergent clean and 1 day a week perform a 1 stage Biocide clean)?
Surfaces & Doors - are these being cleaned in-line with 2291 I.e (2 days a week perform a 1 stage clean)
Campaign Clean - 1 day per month perform a VLFC Strip Clean
Room Numbers:
Are all refuse bins being emptied and cleaned?
Flooring - is flooring being cleaned in-line with 2291 I.e (2 days a week perform a 1 stage detergent clean and 1 day a week perform a 1 stage Biocide clean)?
Surfaces & Doors - are these being cleaned in-line with 2291 I.e (2 days a week perform a 1 stage clean)
Campaign Clean - 1 day per month perform a VLFC Strip Clean
Room Numbers:
Are all refuse bins being emptied and cleaned?
Flooring - is flooring being cleaned in-line with 2291 I.e (2 days a week perform a 1 stage detergent clean and 1 day a week perform a 1 stage Biocide clean)?
Surfaces & Doors - are these being cleaned in-line with 2291 I.e (2 days a week perform a 1 stage clean)
Campaign Clean - 1 day per month perform a VLFC Strip Clean
Room Numbers:
Are all refuse bins being emptied and cleaned?
Flooring - is flooring being cleaned in-line with 2291 I.e (2 days a week perform a 1 stage detergent clean and 1 day a week perform a 1 stage Biocide clean)?
Surfaces & Doors - are these being cleaned in-line with 2291 I.e (2 days a week perform a 1 stage clean)
Campaign Clean - 1 day per month perform a VLFC Strip Clean
Room Numbers:
Are all refuse bins being emptied and cleaned?
Flooring - is flooring being cleaned in-line with 2291 I.e (2 days a week perform a 1 stage detergent clean and 1 day a week perform a 1 stage Biocide clean)?
Surfaces & Doors - are these being cleaned in-line with 2291 I.e (2 days a week perform a 1 stage clean)
Campaign Clean - 1 day per month perform a VLFC Strip Clean
Room Numbers:
Are all refuse bins being emptied and cleaned?
Flooring - is flooring being cleaned in-line with 2291 I.e (2 days a week perform a 1 stage detergent clean and 1 day a week perform a 1 stage Biocide clean)?
Surfaces & Doors - are these being cleaned in-line with 2291 I.e (2 days a week perform a 1 stage clean)
Campaign Clean - 1 day per month perform a VLFC Strip Clean
Room Numbers:
Are all refuse bins being emptied and cleaned?
Flooring - is flooring being cleaned in-line with 2291 I.e (2 days a week perform a 1 stage detergent clean and 1 day a week perform a 1 stage Biocide clean)?
Surfaces & Doors - are these being cleaned in-line with 2291 I.e (2 days a week perform a 1 stage clean)
Campaign Clean - 1 day per month perform a VLFC Strip Clean
Room Numbers:
Are all refuse bins being emptied and cleaned?
Flooring - is flooring being cleaned in-line with 2291 I.e (2 days a week perform a 1 stage detergent clean and 1 day a week perform a 1 stage Biocide clean)?
Surfaces & Doors - are these being cleaned in-line with 2291 I.e (2 days a week perform a 1 stage clean)
Campaign Clean - 1 day per month perform a VLFC Strip Clean
Room Numbers:
Are all refuse bins being emptied and cleaned?
Flooring - is flooring being cleaned in-line with 2291 I.e (2 days a week perform a 1 stage detergent clean and 1 day a week perform a 1 stage Biocide clean)?
Surfaces & Doors - are these being cleaned in-line with 2291 I.e (2 days a week perform a 1 stage clean)
Campaign Clean - 1 day per month perform a VLFC Strip Clean
Room Numbers:
Are all refuse bins being emptied and cleaned?
Flooring - is flooring being cleaned in-line with 2291 I.e (2 days a week perform a 1 stage detergent clean and 1 day a week perform a 1 stage Biocide clean)?
Surfaces & Doors - are these being cleaned in-line with 2291 I.e (2 days a week perform a 1 stage clean)
Campaign Clean - 1 day per month perform a VLFC Strip Clean
Add question?
Health & Safety
- Yes
- No
- N/A
Is the Cleaning Equipment clean and tidy?
Are all PSS Staff wearing the correct PPE?
Have stock levels been audited, are there sufficient on site?
Management Sign Off