Title Page
-
Inspection Reference Number
-
Acceptable Score - 75%
-
Inspection Date and Time
-
Inspector Name
- Kumar Karki
- Ramesh Bhandari
- Niranjan Kharel
- Bishnu Poudel
- Rahul Garg
- Hasnain Kadri
- Khokhon Shajahan Ali
- Chanduru Kumaran
-
Line
-
Station
- 1Y1 - King Salman
- 1Z1 - Anas Ibn Malik
- 1A1 - King Abdullah Financial District
- 1A2 - Prince Turki Ibn Abdulaziz Ath Thani
- 1B1 - Imam Said Ibn Abdulaziz
- 1B2 - Prince Naif
- 1B3 - Olaya / King Abdullah
- 1B4 - Prince Sultan Ibn Salman
- 1C1 - Al Aruba Road (Kingdom Tower)
- 1C2 - Musa Ibn Nassair Street (Sulimanaya)
- 1C3 - Prince Mohammed Bin Abdulaziz Street (Tahlia)
- 1C4 - Prince Sultan (Faysalia Tower)
- 1D2 - Abdul Malik Ibn Marwan
- 1D5 - Prince Faisal Ibn Turki Ibn Abdulaziz
- 1E2 - Imam Abdullah Ibn Faisal Ibn Turki
- 1F4 - King Said (King Abdulaziz Historical Centre)
- 1F5 - Imam Faisal Bin Turki (Al Khazzan Street)
- 1F7 - Downtown / Qasr Al Hokm
- 1F8 - Al Ras Square
- 1F9 - Ammar Ibn Yasir
- 1G1 - Amir Mohamed Ibn Abdulrahman
- 1G2 - Islamabad Street
- 1H2 - Regional Bus Station
- 1J1 - An Nasser Road
- 1J2 - Dar Al Baida Square
- 1Y1 - Park & Ride
- 1H2 - Park & Ride
- 1J2 - Park & Ride
- Emergency Exit
- North Depot
- South Depot
-
Station
- 2A1 - King Saud University
- 2A2 - Science Oasis
- 2A3 - Prince Turki Ibn Abdulaziz
- 2B1 - Takhasusi Road
- 2B2 - Olaya Street /King Abdullah
- 2B4 - Prince Ahmed Ibn Abdulaziz
- 2C1 - King Abdulaziz Road
- 2C2 - Prince Nasser Ibn Farhan Street
- 2C4 - Turki Ibn Ahmed Ibn Al Sadiri
- 2C3 - Convention Centre
- 2D2 - Khalid Bin Al Waleed
- 2E1 - Sheikh Hassan Bin Hussain
- 2E2 - Al Ahaha (Isbiliyah and Al Kaleej Districts)
- 2F1 - Al Najah Street
- 2G1 - King Fahad Stadium
- 2-1 Emergency Eggress Shaft
- 2-2 Emergency Eggress Shaft
- 2SS1 - Substation between 2F1 & 2G1
- East Depot
- West Stabling
-
Location
Documentation
-
Documentation (MP&I, COSHH/SDS, Tool Box Talk, Checklist, Tag, Record)
- 1
- 2
- 3
- 4
- 5
- N/A
-
Staff Appearance (Uniform, PPE) And Personal Hygiene
- 1
- 2
- 3
- 4
- 5
- N/A
Cleanliness Of Station Platform 1
-
Low And High Level Ceilings, Air Conditioning Vents, And Lighting Fixture’S Cover, Display And Signages
- 1
- 2
- 3
- 4
- 5
- N/A
-
Vertical Surfaces (Wall, Steel Work, Ledges, Doors, Display Screens/Signage/Maps, Glazing/Glass, Louvers, Structural Support, Partition, Mirror)
- 1
- 2
- 3
- 4
- 5
- N/A
-
Elevators
- 1
- 2
- 3
- 4
- 5
- N/A
-
Escalators
- 1
- 2
- 3
- 4
- 5
- N/A
-
Staircase
- 1
- 2
- 3
- 4
- 5
- N/A
-
Platform Screen Door (PSD) Non-Lineside
- 1
- 2
- 3
- 4
- 5
- N/A
-
Waste Bins Status
- 1
- 2
- 3
- 4
- 5
- N/A
-
Furniture (Seating), Fixture And Fittings
- 1
- 2
- 3
- 4
- 5
- N/A
-
Hard Floor
- 1
- 2
- 3
- 4
- 5
- N/A
Cleanliness Of Station Platform 2
-
Low And High Level Ceilings, Air Conditioning Vents, And Lighting Fixture’S Cover, Display And Signages
- 1
- 2
- 3
- 4
- 5
- N/A
-
Vertical Surfaces (Wall, Steel Work, Ledges, Doors, Display Screens/Signage/Maps, Glazing/Glass, Louvers, Structural Support, Partition, Mirror)
- 1
- 2
- 3
- 4
- 5
- N/A
-
Elevators
- 1
- 2
- 3
- 4
- 5
- N/A
-
Escalators
- 1
- 2
- 3
- 4
- 5
- N/A
-
Staircase
- 1
- 2
- 3
- 4
- 5
- N/A
-
Platform Screen Door (PSD) Non-Lineside
- 1
- 2
- 3
- 4
- 5
- N/A
-
Waste Bins Status
- 1
- 2
- 3
- 4
- 5
- N/A
-
Furniture (Seating), Fixture And Fittings
- 1
- 2
- 3
- 4
- 5
- N/A
-
Hard Floor
- 1
- 2
- 3
- 4
- 5
- N/A
Cleanliness Of Station Platform 3
-
Low And High Level Ceilings, Air Conditioning Vents, And Lighting Fixture’S Cover, Display And Signages
- 1
- 2
- 3
- 4
- 5
- N/A
-
Vertical Surfaces (Wall, Steel Work, Ledges, Doors, Display Screens/Signage/Maps, Glazing/Glass, Louvers, Structural Support, Partition, Mirror)
- 1
- 2
- 3
- 4
- 5
- N/A
-
Elevators
- 1
- 2
- 3
- 4
- 5
- N/A
-
Escalators
- 1
- 2
- 3
- 4
- 5
- N/A
-
Staircase
- 1
- 2
- 3
- 4
- 5
- N/A
-
Platform Screen Door (PSD) Non-Lineside
- 1
- 2
- 3
- 4
- 5
- N/A
-
Waste Bins Status
- 1
- 2
- 3
- 4
- 5
- N/A
-
Furniture (Seating), Fixture And Fittings
- 1
- 2
- 3
- 4
- 5
- N/A
-
Hard Floor
- 1
- 2
- 3
- 4
- 5
- N/A
Cleanliness Of Station Platform 4
-
Low And High Level Ceilings, Air Conditioning Vents, And Lighting Fixture’S Cover, Display And Signages
- 1
- 2
- 3
- 4
- 5
- N/A
-
Vertical Surfaces (Wall, Steel Work, Ledges, Doors, Display Screens/Signage/Maps, Glazing/Glass, Louvers, Structural Support, Partition, Mirror)
- 1
- 2
- 3
- 4
- 5
- N/A
-
Elevators
- 1
- 2
- 3
- 4
- 5
- N/A
-
Escalators
- 1
- 2
- 3
- 4
- 5
- N/A
-
Staircase
- 1
- 2
- 3
- 4
- 5
- N/A
-
Platform Screen Door (PSD) Non-Lineside
- 1
- 2
- 3
- 4
- 5
- N/A
-
Waste Bins Status
- 1
- 2
- 3
- 4
- 5
- N/A
-
Furniture (Seating), Fixture And Fittings
- 1
- 2
- 3
- 4
- 5
- N/A
-
Hard Floor
- 1
- 2
- 3
- 4
- 5
- N/A
Cleanliness Of Offices ( Ticket, Administrative)
-
Low And High Level Ceilings, Air Conditioning Vents, And Lighting Fixture’S Cover, Display And Signages
- 1
- 2
- 3
- 4
- 5
- N/A
-
Vertical Surfaces (Wall, Steel Work, Ledges, Doors, Display Screens/Signage/Maps, Glazing/Glass, Louvers, Structural Support, Partition, Mirror)
- 1
- 2
- 3
- 4
- 5
- N/A
-
Ticket Vending Machine And Automatic Fare Gates
- 1
- 2
- 3
- 4
- 5
- N/A
-
Waste Bins Status
- 1
- 2
- 3
- 4
- 5
- N/A
-
Furniture (Seating), Fixture And Fittings
- 1
- 2
- 3
- 4
- 5
- N/A
-
Soft Floor
- 1
- 2
- 3
- 4
- 5
- N/A
-
Hard Floor
- 1
- 2
- 3
- 4
- 5
- N/A
Cleanliness Of Station Concourse And Mezzanine Level 1
-
Low And High Level Ceilings, Air Conditioning Vents, And Lighting Fixture’S Cover, Display And Signages
- 1
- 2
- 3
- 4
- 5
- N/A
-
Vertical Surfaces (Wall, Steel Work, Ledges, Doors, Display Screens/Signage/Maps, Glazing/Glass, Louvers, Structural Support, Partition, Mirror)
- 1
- 2
- 3
- 4
- 5
- N/A
-
Elevators
- 1
- 2
- 3
- 4
- 5
- N/A
-
Escalators
- 1
- 2
- 3
- 4
- 5
- N/A
-
Staircase
- 1
- 2
- 3
- 4
- 5
- N/A
-
Waste Bins Status
- 1
- 2
- 3
- 4
- 5
- N/A
-
Furniture (Seating), Fixture And Fittings
- 1
- 2
- 3
- 4
- 5
- N/A
-
Hard Floor
- 1
- 2
- 3
- 4
- 5
- N/A
Cleanliness Of Station Concourse And Mezzanine Level 2
-
Low And High Level Ceilings, Air Conditioning Vents, And Lighting Fixture’S Cover, Display And Signages
- 1
- 2
- 3
- 4
- 5
- N/A
-
Vertical Surfaces (Wall, Steel Work, Ledges, Doors, Display Screens/Signage/Maps, Glazing/Glass, Louvers, Structural Support, Partition, Mirror)
- 1
- 2
- 3
- 4
- 5
- N/A
-
Elevators
- 1
- 2
- 3
- 4
- 5
- N/A
-
Escalators
- 1
- 2
- 3
- 4
- 5
- N/A
-
Staircase
- 1
- 2
- 3
- 4
- 5
- N/A
-
Waste Bins Status
- 1
- 2
- 3
- 4
- 5
- N/A
-
Furniture (Seating), Fixture And Fittings
- 1
- 2
- 3
- 4
- 5
- N/A
-
Hard Floor
- 1
- 2
- 3
- 4
- 5
- N/A
Cleanliness Of Female Toilet
-
Documentation (Checklist Record)
- 1
- 2
- 3
- 4
- 5
- N/A
-
Low And High Level Ceilings, Air Conditioning Vents, And Lighting Fixture’S Cover, Display And Signages
- 1
- 2
- 3
- 4
- 5
- N/A
-
Vertical Surfaces (Wall, Steel Work, Ledges, Doors, Display Screens/Signage/Maps, Glazing/Glass, Louvers, Structural Support, Partition, Mirror)
- 1
- 2
- 3
- 4
- 5
- N/A
-
Hard Floor
- 1
- 2
- 3
- 4
- 5
- N/A
-
Sanitary Fixtures And Fittings (Including Counter And Sink)
- 1
- 2
- 3
- 4
- 5
- N/A
-
Wc Bowl / Urinals
- 1
- 2
- 3
- 4
- 5
- N/A
-
Waste Bins Status
- 1
- 2
- 3
- 4
- 5
- N/A
-
Consumables (Replenished And Adequately Available)
- 1
- 2
- 3
- 4
- 5
- N/A
Cleanliness Of Male Toilet
-
Documentation (Checklist Record)
- 1
- 2
- 3
- 4
- 5
- N/A
-
Low And High Level Ceilings, Air Conditioning Vents, And Lighting Fixture’S Cover, Display And Signages
- 1
- 2
- 3
- 4
- 5
- N/A
-
Vertical Surfaces (Wall, Steel Work, Ledges, Doors, Display Screens/Signage/Maps, Glazing/Glass, Louvers, Structural Support, Partition, Mirror)
- 1
- 2
- 3
- 4
- 5
- N/A
-
Hard Floor
- 1
- 2
- 3
- 4
- 5
- N/A
-
Sanitary Fixtures And Fittings (Including Counter And Sink)
- 1
- 2
- 3
- 4
- 5
- N/A
-
Wc Bowl / Urinals
- 1
- 2
- 3
- 4
- 5
- N/A
-
Waste Bins Status
- 1
- 2
- 3
- 4
- 5
- N/A
-
Consumables (Replenished And Adequately Available)
- 1
- 2
- 3
- 4
- 5
- N/A
Cleanliness Of Prayer Room And Ablution Room
-
Documentation (Checklist Record)
- 1
- 2
- 3
- 4
- 5
- N/A
-
Low And High Level Ceilings, Air Conditioning Vents, And Lighting Fixture’S Cover, Display And Signages
- 1
- 2
- 3
- 4
- 5
- N/A
-
Vertical Surfaces (Wall, Steel Work, Ledges, Doors, Display Screens/Signage/Maps, Glazing/Glass, Louvers, Structural Support, Partition, Mirror)
- 1
- 2
- 3
- 4
- 5
- N/A
-
Hard Floor
- 1
- 2
- 3
- 4
- 5
- N/A
-
Soft Floor
- 1
- 2
- 3
- 4
- 5
- N/A
-
Sanitary Fixtures And Fittings (Including Counter And Sink)
- 1
- 2
- 3
- 4
- 5
- N/A
-
Waste Bins Status
- 1
- 2
- 3
- 4
- 5
- N/A
-
Consumables (Replenished And Adequately Available)
- 1
- 2
- 3
- 4
- 5
- N/A
Cleanliness Of Walkways/Footbridge 1
-
Low And High Level Ceilings, Air Conditioning Vents, And Lighting Fixture’S Cover, Display And Signages
- 1
- 2
- 3
- 4
- 5
- N/A
-
Vertical Surfaces (Wall, Steel Work, Ledges, Doors, Display Screens/Signage/Maps, Glazing/Glass, Louvers, Structural Support, Partition, Mirror)
- 1
- 2
- 3
- 4
- 5
- N/A
-
Waste Bins Status
- 1
- 2
- 3
- 4
- 5
- N/A
-
Furniture (Seating), Fixture And Fittings
- 1
- 2
- 3
- 4
- 5
- N/A
-
Hard Floor
- 1
- 2
- 3
- 4
- 5
- N/A
Cleanliness Of Walkways/Footbridge 2
-
Low And High Level Ceilings, Air Conditioning Vents, And Lighting Fixture’S Cover, Display And Signages
- 1
- 2
- 3
- 4
- 5
- N/A
-
Vertical Surfaces (Wall, Steel Work, Ledges, Doors, Display Screens/Signage/Maps, Glazing/Glass, Louvers, Structural Support, Partition, Mirror)
- 1
- 2
- 3
- 4
- 5
- N/A
-
Waste Bins Status
- 1
- 2
- 3
- 4
- 5
- N/A
-
Furniture (Seating), Fixture And Fittings
- 1
- 2
- 3
- 4
- 5
- N/A
-
Hard Floor
- 1
- 2
- 3
- 4
- 5
- N/A
Cleanliness Of Walkways/Footbridge 3
-
Low And High Level Ceilings, Air Conditioning Vents, And Lighting Fixture’S Cover, Display And Signages
- 1
- 2
- 3
- 4
- 5
- N/A
-
Vertical Surfaces (Wall, Steel Work, Ledges, Doors, Display Screens/Signage/Maps, Glazing/Glass, Louvers, Structural Support, Partition, Mirror)
- 1
- 2
- 3
- 4
- 5
- N/A
-
Waste Bins Status
- 1
- 2
- 3
- 4
- 5
- N/A
-
Furniture (Seating), Fixture And Fittings
- 1
- 2
- 3
- 4
- 5
- N/A
-
Hard Floor
- 1
- 2
- 3
- 4
- 5
- N/A
Cleanliness Of Walkways/Footbridge 4
-
Low And High Level Ceilings, Air Conditioning Vents, And Lighting Fixture’S Cover, Display And Signages
- 1
- 2
- 3
- 4
- 5
- N/A
-
Vertical Surfaces (Wall, Steel Work, Ledges, Doors, Display Screens/Signage/Maps, Glazing/Glass, Louvers, Structural Support, Partition, Mirror)
- 1
- 2
- 3
- 4
- 5
- N/A
-
Waste Bins Status
- 1
- 2
- 3
- 4
- 5
- N/A
-
Furniture (Seating), Fixture And Fittings
- 1
- 2
- 3
- 4
- 5
- N/A
-
Hard Floor
- 1
- 2
- 3
- 4
- 5
- N/A
Cleanliness Of Exit/Entrance Interior And Exterior 1
-
Low And High Level Ceilings, Air Conditioning Vents, And Lighting Fixture’S Cover, Display And Signages
- 1
- 2
- 3
- 4
- 5
- N/A
-
Vertical Surfaces (Wall, Steel Work, Ledges, Doors, Display Screens/Signage/Maps, Glazing/Glass, Louvers, Structural Support, Partition, Mirror)
- 1
- 2
- 3
- 4
- 5
- N/A
-
Elevators
- 1
- 2
- 3
- 4
- 5
- N/A
-
Escalators
- 1
- 2
- 3
- 4
- 5
- N/A
-
Staircase
- 1
- 2
- 3
- 4
- 5
- N/A
-
Waste Bins Status
- 1
- 2
- 3
- 4
- 5
- N/A
-
Furniture (Seating), Fixture And Fittings
- 1
- 2
- 3
- 4
- 5
- N/A
-
Hard Floor
- 1
- 2
- 3
- 4
- 5
- N/A
Cleanliness Of Exit/Entrance Interior And Exterior 2
-
Low And High Level Ceilings, Air Conditioning Vents, And Lighting Fixture’S Cover, Display And Signages
- 1
- 2
- 3
- 4
- 5
- N/A
-
Vertical Surfaces (Wall, Steel Work, Ledges, Doors, Display Screens/Signage/Maps, Glazing/Glass, Louvers, Structural Support, Partition, Mirror)
- 1
- 2
- 3
- 4
- 5
- N/A
-
Elevators
- 1
- 2
- 3
- 4
- 5
- N/A
-
Escalators
- 1
- 2
- 3
- 4
- 5
- N/A
-
Staircase
- 1
- 2
- 3
- 4
- 5
- N/A
-
Waste Bins Status
- 1
- 2
- 3
- 4
- 5
- N/A
-
Furniture (Seating), Fixture And Fittings
- 1
- 2
- 3
- 4
- 5
- N/A
-
Hard Floor
- 1
- 2
- 3
- 4
- 5
- N/A
Cleanliness Of Exit/Entrance Interior And Exterior 3
-
Low And High Level Ceilings, Air Conditioning Vents, And Lighting Fixture’S Cover, Display And Signages
- 1
- 2
- 3
- 4
- 5
- N/A
-
Vertical Surfaces (Wall, Steel Work, Ledges, Doors, Display Screens/Signage/Maps, Glazing/Glass, Louvers, Structural Support, Partition, Mirror)
- 1
- 2
- 3
- 4
- 5
- N/A
-
Elevators
- 1
- 2
- 3
- 4
- 5
- N/A
-
Escalators
- 1
- 2
- 3
- 4
- 5
- N/A
-
Staircase
- 1
- 2
- 3
- 4
- 5
- N/A
-
Waste Bins Status
- 1
- 2
- 3
- 4
- 5
- N/A
-
Furniture (Seating), Fixture And Fittings
- 1
- 2
- 3
- 4
- 5
- N/A
-
Hard Floor
- 1
- 2
- 3
- 4
- 5
- N/A
Cleanliness Of Exit/Entrance Interior And Exterior 4
-
Low And High Level Ceilings, Air Conditioning Vents, And Lighting Fixture’S Cover, Display And Signages
- 1
- 2
- 3
- 4
- 5
- N/A
-
Vertical Surfaces (Wall, Steel Work, Ledges, Doors, Display Screens/Signage/Maps, Glazing/Glass, Louvers, Structural Support, Partition, Mirror)
- 1
- 2
- 3
- 4
- 5
- N/A
-
Elevators
- 1
- 2
- 3
- 4
- 5
- N/A
-
Escalators
- 1
- 2
- 3
- 4
- 5
- N/A
-
Staircase
- 1
- 2
- 3
- 4
- 5
- N/A
-
Waste Bins Status
- 1
- 2
- 3
- 4
- 5
- N/A
-
Furniture (Seating), Fixture And Fittings
- 1
- 2
- 3
- 4
- 5
- N/A
-
Hard Floor
- 1
- 2
- 3
- 4
- 5
- N/A
Cleanliness P&R Car Park
-
Low And High Level Ceilings, Air Conditioning Vents, And Lighting Fixture’S Cover, Display And Signages
- 1
- 2
- 3
- 4
- 5
- N/A
-
Vertical Surfaces (Wall, Steel Work, Ledges, Doors, Display Screens/Signage/Maps, Glazing/Glass, Louvers, Structural Support, Partition, Mirror)
- 1
- 2
- 3
- 4
- 5
- N/A
-
Waste Bins Status
- 1
- 2
- 3
- 4
- 5
- N/A
-
Furniture (Seating), Fixture And Fittings
- 1
- 2
- 3
- 4
- 5
- N/A
-
Hard Floor
- 1
- 2
- 3
- 4
- 5
- N/A
Cleanliness P&R Lobby<br>
-
Low And High Level Ceilings, Air Conditioning Vents, And Lighting Fixture’S Cover, Display And Signages
- 1
- 2
- 3
- 4
- 5
- N/A
-
Vertical Surfaces (Wall, Steel Work, Ledges, Doors, Display Screens/Signage/Maps, Glazing/Glass, Louvers, Structural Support, Partition, Mirror)
- 1
- 2
- 3
- 4
- 5
- N/A
-
Elevators
- 1
- 2
- 3
- 4
- 5
- N/A
-
Escalators
- 1
- 2
- 3
- 4
- 5
- N/A
-
Staircase
- 1
- 2
- 3
- 4
- 5
- N/A
-
Waste Bins Status
- 1
- 2
- 3
- 4
- 5
- N/A
-
Furniture (Seating), Fixture And Fittings
- 1
- 2
- 3
- 4
- 5
- N/A
-
Hard Floor
- 1
- 2
- 3
- 4
- 5
- N/A
Cleanliness Of Back Of House
-
Low And High Level Ceilings, Air Conditioning Vents, And Lighting Fixture’S Cover, Display And Signages
- 1
- 2
- 3
- 4
- 5
- N/A
-
Vertical Surfaces (Wall, Steel Work, Ledges, Doors, Display Screens/Signage/Maps, Glazing/Glass, Louvers, Structural Support, Partition, Mirror)
- 1
- 2
- 3
- 4
- 5
- N/A
-
Offices And Staff Room (Smr, Police Room, Safety Room Etc..)
- 1
- 2
- 3
- 4
- 5
- N/A
-
Store And Janitorial Room
- 1
- 2
- 3
- 4
- 5
- N/A
-
Trash Room / Waste Holding Area
- 1
- 2
- 3
- 4
- 5
- N/A
-
Hard Floor
- 1
- 2
- 3
- 4
- 5
- N/A
-
Staircase
- 1
- 2
- 3
- 4
- 5
- N/A
Pest Control
-
Pest Trap Management
- 1
- 2
- 3
- 4
- 5
- N/A
-
Pest Treatment
- 1
- 2
- 3
- 4
- 5
- N/A
Cleanliness Of Exterior Areas
-
Platform - Exterior Low Level And High Level [All Vertical And Horizontal Finishes (Glazing/Glass, Wall, Louvers) Fixtures, Roof, Lineside Psd]
- 1
- 2
- 3
- 4
- 5
- N/A
-
Concourse And Mezzanine - Exterior Low Level And High Level [All Vertical And Horizontal Finishes (Glazing/Glass, Wall, Louvers) Fixtures, Roof]
- 1
- 2
- 3
- 4
- 5
- N/A
-
Walkways/Footbridge - Exterior Low Level And High Level [All Vertical And Horizontal Finishes (Glazing/Glass, Wall, Louvers) Fixtures, Roof]
- 1
- 2
- 3
- 4
- 5
- N/A
-
Exit/Entrance - Exterior Low Level And High Level [All Vertical And Horizontal Finishes (Glazing/Glass, Wall, Louvers) Fixtures, Roof] & Exterior Fixtures And Fittings (Bicycle Rack, Bollards, Barrier, Light Poles, Landscape Fixtures, Waste Bin Etc.)
- 1
- 2
- 3
- 4
- 5
- N/A
-
Back Of House - Exterior Low Level And High Level [All Vertical And Horizontal Finishes (Glazing/Glass, Wall, Louvers) Fixtures, Roof]
- 1
- 2
- 3
- 4
- 5
- N/A
-
P&R Car Park - Exterior Low Level And High Level [All Vertical And Horizontal Finishes (Glazing/Glass, Wall, Louvers) Fixtures, Roof] & Exterior Fixtures And Fittings (Bicycle Rack, Bollards, Barrier, Light Poles, Landscape Fixtures, Waste Bin Etc.)
- 1
- 2
- 3
- 4
- 5
- N/A
-
Depot Buildings - Exterior Low Level And High Level [All Vertical And Horizontal Finishes (Glazing/Glass, Wall, Louvers) Fixtures, Roof]
- 1
- 2
- 3
- 4
- 5
- N/A
Signature
-
Signature