Title Page
-
Clerk of Works Site Surveillance Form
-
Job Number 31/34069/06
-
Contract Number: FCEC2001.01
-
Project: Falls Creek Eagle Chair Replacement
-
Contractor: Leitner Poma of America
-
Surveillance Officer:
-
Site Supervisor:
-
Arrival Time:
-
Departure Time:
-
Date:
-
Exact Location:
-
Work Item(s) Being Inspected:
-
General Site Observations including Plant/Equipment and Labour on Site:
-
Any Defective Work and Materials; and Non-Compliances?
-
List items that are defective and/or non-compliant
-
Add Photo (if possible)
-
Any test results received/observed?
-
List any test results:
-
Any Hold/Witness Points Reached?
-
Add details of Hold/Witness Points:
-
Add Photos
-
Quality of Work:
-
Any Delays to Works and/or Potential Delays (wet weather, waiting on works by others, industrial action, latent conditions, etc)?
-
List Delay(s) (and expected time if know)
-
Any Environmental, OH&S, Industrial Relations Issues?
-
List Issues
-
Photo (if required)
-
Any verbal directions given to the contractor?
-
Note any verbal instructions given to the Contractor:
-
Is a Notice of Proposed Variation, Variation Order or Site Instruction Required?
-
If Yes, Provide Details
-
Further Inspection and/or Testing Required on Work Item(s) Listed Above
-
Photographs Taken?
List Photos and Location/Item
-
Add media
-
Contractors Verification Records
-
If Incomplete or Non Existent list/document actions required
-
Weather Conditions:
- Fine
- Overcast
- Light Rain
- Heavy Rain
-
Other Comments