Information
-
CSB BASEMENT PLANTROOM
-
Location
-
Conducted on
-
Campus
-
-
Completed by:
-
-
Document No.
CSB Basement Plantroom [009213]
-
Have the actions of the previous audit been actioned?
-
Clean & Safe
-
Lighting Operational
-
Emergency Exit Lights Operational
-
Free of Abnormal Noise
-
Plant Room Secure
-
Send to WOMS
CSB Multistack Chiller [2074]
-
Chiller running?
-
Condenser water pump running?
-
Suction pressure within acceptable range
-
Discharge pressure within acceptable range
-
Cond water flow temp within acceptable range
-
Cond water return temp within acceptable range
-
Chilled water pump running?
-
Suction pressure within acceptable range
-
Discharge pressure within acceptable range
-
CHW flow temp within acceptable range
-
CHW return temp within acceptable range
-
Evaporator refrigerant temp within acceptable range
-
Send to WOMS
Mechanical Distribution Board [2148]
-
Lamp Test
-
Faults
-
Send to WOMS
DHW Calorifier C-B-1 [9195]
-
DHW flow temp within acceptable range
-
Entering steam pressure within acceptable range
-
DHWP-B-1 online
-
DHWP-B-1 running
-
Send to WOMS
Compressed Air Receiver 1 [9200]
-
Air receiver 1 pressure within acceptable range
-
Air dryer compressor functioning appropriately
-
Auto drains functioning when tested
-
Free of air leaks at piping/connections/plant
-
Send to WOMS
Compressed Air Receiver 2 [9201]
-
Air receiver 2 pressure within acceptable range
-
Air dryer compressor functioning appropriately
-
Auto drains functioning when tested
-
Free of air leaks at piping/connections/plant
-
Send to WOMS
Heat Exchanger [3088]
-
Online
-
Running
-
Steam pressure within acceptable range
-
HHW flow temp within acceptable range
-
HHW pump running
-
Send to WOMS
Condensate Tank [3087]
-
Pump operating appropriately
-
Tank pressure within acceptable range
-
Flow pressure within acceptable range
-
Piping free from leaks
-
Send to WOMS
Steam Headers and Connecting Pipes [2149]
-
Free from leaks
-
Send to WOMS
-
Add signature