Information
-
Store Name (Town and Name - i.e. Glasgow Union Street)
-
Conducted on
-
Area Manager
-
Auditor
Coffee Audit - Overview
Coffee Process
-
Barista(s)
-
Was button 3 used for flushing?
-
Has the coffee been levelled properly?
-
Was the coffee tamped properly? (once for espresso, twice for ristretto)
-
Was the handle wiped before inserting into the group head?
-
Was the timer in use?
-
Was the steamer purged before steaming?
-
Was a thermometer in use?
-
Correct ROP? (20-22 sec for Espresso, 15 sec for Ristretto)
-
Are the 4 steps of milk steaming being followed? (1. Position, 2. Inject air, 3. Vortex, 4. Tap & Swirl.)
-
Was the steamer wiped and purged after steaming?
-
Was the milk being steamed whilst coffee was extracting?
-
Was the milk poured correctly? (spout for latte, side for cappuccino)
-
Presentation up to standard (white disk, ring of crema)
-
Are the foam levels correct? (Capp, 2 - 2.5 cm, Latte, 1 - 1.5 cm, Flat White, 0.5 - 1cm)
-
Is the bar clean and free of coffee grounds?
-
Coffee Photos
Pressure Check
-
Is the pump pressure between 8 - 10 Bar
-
Is the steam pressure between 0.9 - 1.1 Bar
Summary Comments
-
Additional comments (optional)