Information

  • Document No.

  • Excavator / work parties in area.

  • Push Back

  • RL

  • Shot

  • Conducted on

  • Prepared by

Active Coal Face

  • Area of inspection

  • Is there any loose coal present on the floor or in the work area?

  • Have you organised to get loose coal removed or compacted prior to the end of shift?

  • Is the loose coal accessible?

  • Enter requirement to compact or remove coal into the shift handover book.

  • Contact short term planner to establish access to area.

  • Is the coal face blasted?

  • How many days ago was the coal blasted?

  • Will all blasted inventory in this area be mined out within 21 days of being blasted?

  • Inform Short Term planning team of requirement to complete a risk assessment on how to manage risk of Spon com.

  • Are all catch benches clean of loose coal and material?

  • Have you organised to get the bench cleaned off this shift?

  • Enter the cleaning of catch benches into the shift handover book.

  • Do catch benches have a gradient of 2% towards active pit?

  • Have you organised to reshape catch benches?

  • Enter the reshaping of catch benches into the shift handover book.

  • Is all safety bunding a minimum of 5m from the crest of the pit?

  • Have you organised to get the bund pulled back this shift?

  • Enter the requirement to pull back bunding into the shift handover book.

  • Will the bottom of coal be reached in the next 72 hours?

  • Contact the geology department and request a recommendation to be released with a timeline and method of smothering the final wall.

  • Are there any identified heated areas within this area?

  • According to the Heated Area TARP, what level is the heated area?

  • Has the temp been tested this shift? If so what was the reading?

  • What actions have been taken to cool the area?

  • Has this area been escalated as priority in stock rotation?

  • Inform short term planners and load and dump supervisors to priorities this area in stock rotation.

  • Has the temp been tested this shift? If so what was the reading?

  • What actions have been taken to cool the area?

  • Has this area been escalated as priority in stock rotation?

  • Inform short term planners and load and dump supervisors to priorities this area in stock rotation.

  • Has a JHA been completed and all persons working around the area signed on?

  • You must immediately arrange for a JHA to be completed focusing on the risks associated with Spon Com and Toxic Gasses.

  • Has the area been excavated and heated material been track rolled?

  • Is the area able to be excavated and heated material removed and track rolled? (Access, within pit limits etc.)

  • You must immediately arrange for the area to be excavated and track rolled / compacted.

  • You must immediately contact the short t

  • Has the excavation site been buried, compacted or sealed?

  • You must immediately arrange for the site to be compacted.

  • Has the temp been tested every three hours this shift? If so what was the last reading?

  • Has this area been escalated as priority in stock rotation?

  • Inform short term planners of requirement to prioritise this area in stock rotation.

  • Is there spontaneous combustion present in the active mining area?

  • Has the Spon Com TARP been followed?

  • You must follow Spon Com Tarp.

  • What visual signs are present?

  • This is a low risk stage of Spon com. OCE and all production supervisors must be notified immediately. Controlling of Spon com in these areas must occur as soon as practicable.

  • Gas testing and monitoring by the OCE or delegate is to take place to establish if a risk to personnel is acceptable.

  • Supervisors and OCE to develop a safe treatment plan to remediate the spontaneous combustion, as soon as practical mobilise equipment and resources to the area to implement the treatment plan. NOTE: Treatment of spontaneous combustion may depend on the area however in all situations water shall only be used to extinguish flame and only when all other methods have been deemed unsafe or ineffective. Options for treating Spon com in active mining area may include: - Excavate and load out heated material. - Compact loose coal leaving no raised edges to catch wind. (Safety bunds may be left for safety reasons.) - Grade the coal to a hard floor and clean any loose coal from toe of faces.

  • What actions have been taken to cool the area?

  • Supervisor to assess area for possibility of spontaneous combustion reoccurring specifically looking for loose coal, temperature spikes etc.

  • Supervisor to immediately assess the need for individuals to be in the area. Wind direction to be monitored. Supervisors who have teams conducting work in the area will conduct a JHA to identify hazards and controls required for personnel to continue working in area.

  • Gas testing and monitoring by the OCE or delegate is to take place to establish if a risk to personnel is acceptable.

  • Supervisors and OCE to develop a safe treatment plan to remediate the spontaneous combustion, and immediately mobilise equipment and resources to the area to implement the treatment plan. NOTE: Treatment of spontaneous combustion may depend on the area however in all situations water shall only be used to extinguish flame and only when all other methods have been deemed unsafe or ineffective. Options for treating Spon com in active mining area may include: - Excavate and load out heated material. - Compact loose coal leaving no raised edges to catch wind. (Safety bunds may be left for safety reasons.) - Grade the coal to a hard floor and clean any loose coal from toe of faces.

  • What actions have been taken to cool the area?

  • OCE is to detail the Spon com event in the OCE report.

  • Any persons showing early warning signs and physical signs of discomfort from the spontaneous combustion is to be removed from the area and taken to the site paramedic.

  • Supervisors to put together an amber alert detailing Spon com issue occurring in the pit , it's location and the actions taken to avoid any fume or gas given off from the event. Amber alert to be included in the OCE report email sent for that shift.

  • What actions have been taken to cool the area?

  • Initiate Incident Management Actions using Incident Management Tarp

  • Supervisor to write an incident gram and notify management as per incident management TARP. Visual flame is an HPI and reportable to the inspectorate.

  • Supervisor to enter incident into RTBS within 24 hours and use the risk matrix card to determine the MRO risk rating.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.