Information
-
Conducted on
-
Location
-
Project/Task
-
Project Manager
-
Contact person/Supervisor
-
Prepared by
1. Public Safety
-
1.1 Traffic & pedestrians taken into consideration?
-
1.2 Signage is appropriate for scope of works?
-
1.3 Traffic management plan completed, submitted & maintained?
2. Personal Protective Equipment
-
2.1 In good order & being worn?
-
2.2 Hi-Vis vest/jacket done up?
-
2.3 Head, eye and ear protection worn as required?
-
2.4 Safety footwear adequate?
-
2.5 Sun protection appropriate?<br>Hat, long sleeves, pants and sunglasses worn?
-
2.6 Sunscreen available?
3. Plant
-
3.1 Daily checklist or logbook complete?
-
3.2 Reversing signal, flashing lights in working order?
4. Elevated Work Platform specific
-
4.1 Evidence of pre-start checks available
-
4.2 Elevated Work Platform "Work Checklist" (FM220) signed off by operator.
5. First Aid Facilities
-
5.1 Kit available & contents appropriate?
-
5.2 Within use-by date?
-
5.3 Certified First Aider on site?
6. Chemicals
-
6.1 MSDS register on site?
-
6.2 Is MSDS register up to date?
-
6.3 Dangerous goods storage appropriate (including fuels)?
7. Powered equipment/machinery i.e. chainsaws
-
7.1 Branch chipping operations performed in accordance with Work Instruction 9316
-
7.2 Operator trained and competent in the use of branch chippers?
-
7.3 Operator trained and competent in the use of a chainsaw?
8. Fall Protection
-
8.1 Is operator wearing safety harness and lanyard attached to Elevated Work Platform?
9. Arboriculture Specific
-
9.1 Has arboriculture team member completed the Arboriculture OH&S Checklist prior to task/project commencement?
-
9.2 Is Elevated Work Platform and other plant/equipment a safe distance from power lines?<br>(Refer WorkSafe Victoria's guidance on no-go zones for overhead electrical power lines)
-
9.3 Wind conditions appropriate?
10. Other
-
10.1 Staff amenities appropriate and accessible?
-
10.2 Is on site storage available?
-
10.3 Power leads and tools tagged and in date?
-
10.4 Services locations and protection identified (including spotters and any required permits?)
-
10.5 Site induction carried out (including sub contractors?)
-
10.6 JSA/SWMS available and completed?
-
10.7 Emergency procedure in place?
-
10.8 Licences and registrations current?
-
10.9 Fall from height controls or procedures in place?
-
Comments/additional safety items:
-
Items requiring attention referred to:
-
For action by:
-
Auditor signature
-
Auditee signature