Coiled Tubing Rig Up Checklist

TES-MS-1065

Coiled Tubing Rig Up Checklist

Document Number: TES-HS-1037

Revision Level: 1.0

Release Date: 03/28/2013

  • Customer Location

  • Date (mm/dd/yy)

  • Arrival Time (24 hours)

  • Departure Time (24 Hours)

  • Name

  • Field Supervisor

Note: This form must be submitted to Division HSSE specialist & Corporate QHSSE Manager prior to running in hole.

Inspection Items

  • HSE

  • ERP, emergency contacts, driving directions and GPS are posted

  • Certification papers delivered with equipment

  • Smoking area butt container out in smoking area

  • Suitable amount of facilities

  • 8ft of 10ft ground rod buried at least 2.5ft into ground

  • PVC ground rod covers in place for visibility

  • Spotters have on Hi Vis vest when spotting equipment

  • Sufficient quantity of absorbent materials on location

  • 75ft buffer zone from all pressure sources

  • MSDS for all chemicals on location

  • Fire extinguishers out and hanging on front of equipment

  • Trip hazards clearly marked

  • Appropriate signage installed

  • Shower trailer set up at minimum 55ft from chemical area and function tested

  • All containers labeled

  • Equipment physical appearance (rust, paint, etc.)

  • Iron certifications within annual requirement and banded

  • All JSEA's signed

  • Fuel trailer grounded and bonding cable installed and available for use when fueling

  • Employees have correct PPE available for use

  • Extra PPE inventory available on location

  • Are wheel chicks available for vehicles

  • All containments in place / sides upright/ bridges installed

  • Lifting equipment is inspected and register up to date

  • Fall Protection inspected and register up to date

  • Controlled work instructions on site

  • Chemical Transport manifest on site and signed by the driver

  • CTU

  • Annual inspection of CT gauges reviewed

  • Confirm Weight indicator is functioning

  • PUMP

  • Double pump outlets capped or plugged (no open loops)

  • Check valve for kill line or remote operated valve (pump to reel)

  • PSV annual inspections

  • PSV for fluid pump and electronic trip or Pre-set PSV

  • Fluid Line anchored at each end.

  • BOP

  • Current BOP Certification

  • BOP has pressure test within 14 days of arrival

  • BOP function test

  • Shear ram performance test within previous 180 days

  • Confirm BOP Ram Configuration per NOP/WSP

  • Check for short bolting on BOP components prior to rig up

  • Flange connection only-BOP to Wellhead

  • INJECTOR HEAD

  • Certified rigging on IH (slings, D-rings, Shackles, etc)

  • Inspection and weight rating documentation for pad eyes

  • IH chain guards properly secured, secondary tether installed

  • Keepers on bolts/lock nuts installed

  • Fall restraint not deployed (SRL Sala Block)

  • Hydraulic lines restrained (BOP, IH)

  • IH stabilizer lines and anchors secure and correct come alongs used?

  • CRANE

  • Crane Anemometer installed and functional

  • Daily crane inspection forms in crane cab and available for review (max 30 days all others brought to yard for records)

  • Confirm anti two block test

  • Lifting equipment is inspected and register up to date

Checklist Completed By

  • Name (Please Print)

  • Date/Time

*Note: N2 Rig Up Checklist must be submitted along with this report if N2 is being used for operation.

  • Comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.