Coiled Tubing Rig Up Checklist
TES-MS-1065
Coiled Tubing Rig Up Checklist
Document Number: TES-HS-1037
Revision Level: 1.0
Release Date: 03/28/2013
-
Customer Location
-
Date (mm/dd/yy)
-
Arrival Time (24 hours)
-
Departure Time (24 Hours)
-
Name
-
Field Supervisor
Note: This form must be submitted to Division HSSE specialist & Corporate QHSSE Manager prior to running in hole.
Inspection Items
-
HSE
-
ERP, emergency contacts, driving directions and GPS are posted
-
Certification papers delivered with equipment
-
Smoking area butt container out in smoking area
-
Suitable amount of facilities
-
8ft of 10ft ground rod buried at least 2.5ft into ground
-
PVC ground rod covers in place for visibility
-
Spotters have on Hi Vis vest when spotting equipment
-
Sufficient quantity of absorbent materials on location
-
75ft buffer zone from all pressure sources
-
MSDS for all chemicals on location
-
Fire extinguishers out and hanging on front of equipment
-
Trip hazards clearly marked
-
Appropriate signage installed
-
Shower trailer set up at minimum 55ft from chemical area and function tested
-
All containers labeled
-
Equipment physical appearance (rust, paint, etc.)
-
Iron certifications within annual requirement and banded
-
All JSEA's signed
-
Fuel trailer grounded and bonding cable installed and available for use when fueling
-
Employees have correct PPE available for use
-
Extra PPE inventory available on location
-
Are wheel chicks available for vehicles
-
All containments in place / sides upright/ bridges installed
-
Lifting equipment is inspected and register up to date
-
Fall Protection inspected and register up to date
-
Controlled work instructions on site
-
Chemical Transport manifest on site and signed by the driver
-
CTU
-
Annual inspection of CT gauges reviewed
-
Confirm Weight indicator is functioning
-
PUMP
-
Double pump outlets capped or plugged (no open loops)
-
Check valve for kill line or remote operated valve (pump to reel)
-
PSV annual inspections
-
PSV for fluid pump and electronic trip or Pre-set PSV
-
Fluid Line anchored at each end.
-
BOP
-
Current BOP Certification
-
BOP has pressure test within 14 days of arrival
-
BOP function test
-
Shear ram performance test within previous 180 days
-
Confirm BOP Ram Configuration per NOP/WSP
-
Check for short bolting on BOP components prior to rig up
-
Flange connection only-BOP to Wellhead
-
INJECTOR HEAD
-
Certified rigging on IH (slings, D-rings, Shackles, etc)
-
Inspection and weight rating documentation for pad eyes
-
IH chain guards properly secured, secondary tether installed
-
Keepers on bolts/lock nuts installed
-
Fall restraint not deployed (SRL Sala Block)
-
Hydraulic lines restrained (BOP, IH)
-
IH stabilizer lines and anchors secure and correct come alongs used?
-
CRANE
-
Crane Anemometer installed and functional
-
Daily crane inspection forms in crane cab and available for review (max 30 days all others brought to yard for records)
-
Confirm anti two block test
-
Lifting equipment is inspected and register up to date
Checklist Completed By
-
Name (Please Print)
-
Date/Time
*Note: N2 Rig Up Checklist must be submitted along with this report if N2 is being used for operation.
-
Comments