Information
N2 Rig Up Checklist
TES-MS-1064
N2 Rig Up Checklist
Document Number: TES-HS-1034
Revision Level: 1.0
Release Date: 03/28/2013
-
Customer Location
-
Date (mm/dd/yy)
-
Arrival Time (24 hours)
-
Departure Time (24 Hours)
-
Name
-
Field Supervisor
Note: This form must be submitted to Division HSSE Specialist & Corporate QHSSE Manager prior to pumping stage 1.
Inspection Items
-
Certification papers delivered with equipment
-
N2 PPE available (Insulated gloves, long sleeves, face shield)
-
75ft buffer zone marked from all pressure sources
-
Braided transfer hoses inspected for damage, have brass fittings and have proper PSI rating
-
N2 pump(s) iron banded within annual certification
-
N2 Iron restrained or anchored
-
All hammer unions are compatible
-
Inline check valve (dart type) installed
-
Double block valve installed on bleed
-
All N2 connections cleaned and lubricated with Diesel fuel
-
E-kill/ESD function tested
-
Name (Please Print)
-
Date/Time
-
Comments