Information

N2 Rig Up Checklist

TES-MS-1064

N2 Rig Up Checklist

Document Number: TES-HS-1034

Revision Level: 1.0

Release Date: 03/28/2013

  • Customer Location

  • Date (mm/dd/yy)

  • Arrival Time (24 hours)

  • Departure Time (24 Hours)

  • Name

  • Field Supervisor

Note: This form must be submitted to Division HSSE Specialist & Corporate QHSSE Manager prior to pumping stage 1.

Inspection Items

  • Certification papers delivered with equipment

  • N2 PPE available (Insulated gloves, long sleeves, face shield)

  • 75ft buffer zone marked from all pressure sources

  • Braided transfer hoses inspected for damage, have brass fittings and have proper PSI rating

  • N2 pump(s) iron banded within annual certification

  • N2 Iron restrained or anchored

  • All hammer unions are compatible

  • Inline check valve (dart type) installed

  • Double block valve installed on bleed

  • All N2 connections cleaned and lubricated with Diesel fuel

  • E-kill/ESD function tested

  • Name (Please Print)

  • Date/Time

  • Comments

*Note: N2 Rig Up Checklist must be submitted along with this report if N2 is being used for operation.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.