Stimulation / Wire Line Rig Up Checklist
TES-MS-1063
Stimulation / Wire Line Rig Up Checklist
Document Number: TES-HS-1033
Revision Level: 1.0
Release Date: 03/28/2013
-
Customer Location
-
Date (mm/dd/yy)
-
Arrival Time (24 hours)
-
Departure Time (24 Hours)
-
Name
-
Field Supervisor
Note: This form must be submitted to Division HSSE Specialist & Corporate QHSSE Manager prior to pumping stage 1.
Inspection Items
HSE
-
Emergency contact numbers, ERP, GPS and directions posted in Data Van/Customer Trailer
-
Appropriate JSEAs discussed and signed
-
Sufficient absorbent materials on location to manage spills
-
LO/TO equipment available
-
Trip Hazards marked/eliminated
-
Ground rods in place and equipment connected properly (Data Van, Shower trailer, Fuel Trucks)
-
Line backers used to guard cables
-
Adequate room for egress between equipment
-
Wheels chocked on equipment with running road engines
-
Confined spaces identified with placards
-
MSDS available for every chemical on location
-
MSDS available in shower trailer for quick reference
-
Spill kits on location and available
-
First Aid kits inspected and stocked
Backside (Blender, C.A.S., Hydration, Sand)
-
Bridges used to keep hoses off sides of containment
-
Acid Lines marked with Pink Ribbon
-
Brine Lines marked with Orange Ribbon
-
Chemical hoses marked at every connection and coded properly (Primary= 1 stripe, Back up= 2 stripes)
-
Chemical hoses ran together to eliminate unnecessary trip hazards
-
Suction hoses (Red) used on suction side
-
Chemical hoses machine crimped or double banded
-
Boost hoses (blue) used on discharge side
-
Boost hoses restrained with whip check
-
Unused ports on blender/hydration capped (discharge)
-
Guards in place on Sand King stingers
-
Chemical Exclusion Zone set up
-
Respiratory Protection signs in place around sand area
-
Shower Trailer set up within 55ft of Chemical area and function tested
-
Water in shower trailer tested for Cl2 level
-
Hand Rails set up on each mover
Front Side (Pumps)
-
Pumps spotted with enough room for egress
-
Pumps spotted with enough room for work platforms to extend
-
Whip checks installed on boost hoses
-
Restraints used for all independent pumps and lines from front of missile forward
-
Iron certification within annual requirement
-
Iron banded within quarterly date
-
Swivel carriers available and used during rig up
-
Fire extinguishers inspected and placed on front of tractors
-
Lifting devices inspected and register up to date
-
Fall arrest devices inspected and register up to date
-
75ft exclusion zone set up around pumping equipment and well head
-
Exclusion zone marked off at front of pumps
Wireline
-
Lifting equipment inspected and register up to date
-
Fall arrest devices inspected and register up to date
-
WL sheaves and chains inspected and register up to date
-
BOP function test
-
Hydraulic lines secured with whip checks
-
Back of perforator outside of exclusion zone
-
Catch pan under bottom sheave
-
Perforator grounded
-
Wheels chocked on perforator
Crane
-
Confirm anti two block test
-
Daily crane inspection forms available for review in crane cab
-
Max 30 days inspections in cranes (all others brought back to yard for record keeping)
Checklist Completed By
-
Name (Please Print)
-
Date/Time
-
Comments